St Marys Welcome Center Improvements

Closed
PE-66960-NONST-2026-000000036State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for comprehensive interior modernization. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms with new vanities and lavatories, and updating interior surfaces with new paint and signage. Technical upgrades involve installing raised flooring and electrical distribution for classrooms, implementing simple dimming controls, replacing ballasts, lamps, and ceiling fans, and replacing variable air volume systems and lighting controls. The contractor is also responsible for correcting plumbing deficiencies and installing new safety stair treads in all stairwells. The performance period is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the Notice to Proceed. Award will be determined using the best suited negotiate methodology, with price, past performance, and corporate relevant experience weighted with equal importance. Offerors must provide performance and payment bonds equal to 100 percent of the contract price and adhere to strict submission guidelines, including electronic delivery of separate price and technical files. All work must comply with ADA accessibility guidelines, Buy American requirements, and prevailing wage rates as specified in the applicable wage determinations.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project is estimated between 10 million and 25 million dollars with a performance period of 730 days after award. The comprehensive scope of work includes selective demolition, building envelope and roofing repairs, interior reconfiguration with new finishes, and the installation of updated HVAC, exhaust extraction, compressed air, and NFPA-compliant fire suppression systems. Additionally, the project requires the replacement of electrical distribution, lighting, low-voltage systems, and building automation controls, alongside site improvements such as paving, drainage upgrades, and hazardous materials abatement. The contract is divided into two primary pricing elements: ELIN 0001 for building renovation and ELIN 0002 for paving removal and replacement. Award will be based on the lowest price, and bidders must propose on all line items to avoid rejection. Performance is subject to the Davis-Bacon Act and Buy American requirements. Bonding requirements are tiered, with proposals exceeding 150,000 dollars requiring bid, payment, and performance bonds. Contractors must implement a government-approved Quality Control Plan utilizing three phases of control for each Definable Feature of Work and adhere to strict marking and labeling standards, including MIL-STD-101 for piping. Invoicing is managed through Wide Area Work Flow with monthly submissions required within five calendar days of the invoice date.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 26 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 includes the construction of a separate 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention and utility systems. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact Rahul Maheshwari to receive the formal bid invitation and project documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 3 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. The project follows a fire sprinkler discharge that impacted the first, second, and third floors, including dormitory rooms, offices, and medical areas. The scope of work involves architectural repairs such as drywall replacement, painting, ceiling tile and flooring installation, rubber wall base installation, and electrical and plumbing repairs to restore the facility to its original condition. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Award will be based on best value, with evaluation weights assigned to price (60), quality (20), past performance (10), and schedule (10). Prospective bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required documentation includes a detailed cost breakdown, a timeline for completion, a 90-day bid guarantee, a valid Massachusetts Contractor's License, and wage rate certifications. The contract is subject to the Davis-Bacon Act, requiring a minimum wage of 13.65 per hour and specific paid sick leave provisions. Contractors must comply with NFPA-101 Life Safety Code, OSHA, EPA, and ADA regulations, and provide proof of automobile liability insurance naming Adams and Associates, Inc. as an additional insured. Deliverables include a sequenced construction schedule due within 14 days of the Notice to Proceed. The project includes a one-year guarantee of workmanship and a specific 20-year product warranty for LVP flooring. Payment terms are Net 30.
Grafton Job Corps

POSTED

about 3 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The contract involves the demolition and removal of the existing entry deck, handicap ramp, and associated framing, followed by the construction of a new CMU stem wall, concrete porch deck, and accessible ramp at the St. Marys Welcome Center. The work includes developing and submitting all necessary drawings, exhibits, and design data to obtain building permits in compliance with local, state, and federal codes, including ADA requirements. The project is funded and overseen by the City of St. Marys, Georgia, with a contract value estimated between 100,000 and 300,000 dollars, and a completion timeline of 120 days from the Notice to Proceed. Bidders must submit sealed bids by September 30, 2025, with a mandatory pre-bid meeting held on September 11, 2025. The procurement emphasizes adherence to nondiscrimination policies, Georgia security and immigration laws, and inclusion of all subcontractor compliance affidavits, notably under O.C.G.A. § 13-10-91, with a focus on federal work authorization verification. The contract incorporates specific federal and state regulatory clauses, including compliance with Title 49 CFR Part 21 on nondiscrimination and Georgia’s immigration verification statutes. It mandates inclusion of these provisions in all subcontracts and details sanctions for noncompliance, such as withholding payments or contract termination. The agreement is governed by Georgia law, and the contractor is responsible for providing bonds, insurance certificates, and detailed cost breakdowns for change orders. Payment procedures require monthly applications supported by notarized documentation, Certificates of Insurance, and proof of stored materials if applicable. The project’s performance is inspected on-site by the City’s designated representatives, with final acceptance contingent upon meeting all contractual, regulatory, and quality standards, including ADA compliance and industry best practices. The contractor’s full-time superintendent must remain on-site until punch list items are completed and verified. Overall, the contract emphasizes clear communication, strict adherence to specifications, and comprehensive documentation throughout the project lifecycle.

General Info

Documents

1

City of St. Marys GA Invitation for Bid: Welcome Center Concrete Porch & Handicap Ramp

PDF, High priority: read this first48 pages · ifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Solicitation number changed from 66960 ST. PE-66960-NONST-2026-000000036 to PE-66960-NONST-2026-000000036.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of St. Marys
Contacts1 person available
OfficeN/A
Organization / AgencyGeorgia → City of St. Marys
Office AddressN/A

Full Description

Show more
The work to be done includes the removal and disposal of the existing entry deck and handicap ramp & related framing, decking & handrail features. The work shall also include all the work, efforts & activities required to construct a new CMU Stem Wall & Concrete Porch Deck and Concrete HC Ramp. The Contractor shall also be required to develop and submit the drawings, exhibits, & design data required to obtain the necessary building permits, in accordance with applicable State, County & City Building Code Requirements.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS