This Solicitation opportunity from Rhode Island was posted on October 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
State of RI BHDDH Johnston Group Home Demolition Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The State of Rhode Island BHDDH is soliciting bids under RFQ27007057 for the demolition of a former group home located at 22 Tartaglia Street in Johnston, Rhode Island. The selected firm will be responsible for all permitting and the complete demolition of the structure to the slab, including the removal of existing utilities, below-grade utility structures, concrete patches, walkways, and retaining walls. Following demolition, the site must be infilled, stabilized with temporary vegetation, and managed for erosion and sediment control. A pre-bid conference was scheduled for October 16, 2026, with a final response deadline of November 5, 2026. The project requires strict adherence to the 2018 International Building Code, OSHA standards, ADA compliance, and EPA notification and disposal regulations. An asbestos determination survey conducted on April 6, 2026, confirmed that all 52 samples collected were non-asbestos containing; however, the contractor must notify the owner immediately if any suspected hazardous materials are encountered. Key requirements include the provision of performance and payment bonds, the installation of a secure site enclosure fence, and the engagement of a professional engineer to conduct a structural survey to prevent unplanned collapse. The use of explosives and the on-site sale of removed materials are strictly prohibited. Contract administration involves a Construction Manager and Architect, with payments processed via AIA Documents G702 and G703. The contractor is subject to liquidated damages of 500 dollars per day for delays. Quality control will be managed through a schedule of tests and inspections, with earthwork and grading verified by a soils engineer using ASTM standards. Temporary electric services must comply with NECA, NEMA, UL, and NFPA 70, while the fire-safety program must meet NFPA 241 requirements.
General Info
Agency
Place of Performance
Set-Aside
Documents
8AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownSolicitation requirements
25 mandatory25 requirements in 8 areas
- Technical6 · 6 must008
Demolition of Group Home Structure
- Compliance5 · 5 must003
Permitting Responsibility
Contract notice - Quality Assurance5 · 5 must017
Quality Control Service Reporting
- 22 more requirements, each with its source quote
Read every requirement with its source and proposal context.
Read all 25 requirementsThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Asphalt Paving ServicesOpen now, due in 64 days
- Site Preparation and Grading ServicesOpen now, due in 64 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Notice details unchanged. Attachments may have changed.
Deadline has passed
Organization & Contact Information
Full Description
More opportunities from State of Rhode Island
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
