Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Homeland Security was posted on April 10, 2015. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Station Bathroom Remodel

Closed
21-15-305PCV311Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236118
New
SLED
Solicitation LA01-10-27-0116- Housing Rehab- Rogers County
Solicitation # LA01-10-27-0116
Solicitation LA01-10-27-0116 is a request for bids from the Housing Authority of the Cherokee Nation for the rehabilitation of a single-family home located at 416 West 11th, Claremore, Oklahoma, in Rogers County. The scope of work includes carpentry, hazard reduction, paint, and finish services. Because the property has tested positive for lead-based paint, the contractor must be certified through both the Cherokee Nation and the Department of Environmental Quality (DEQ) and adhere to HUD and EPA lead-safe housing and certification rules. The project must be completed within 45 working days of the Notice to Proceed, with work beginning within two weeks of notification. Failure to meet the completion deadline will result in liquidated damages of 100 dollars per working day. The contract will be awarded to the responsible bidder offering the lowest responsive bid, with evaluation factors including the contractor's current project load, history of on-time completion, quality of previous work, and outstanding warranty issues. Bidders must provide a one-year warranty against faulty materials or workmanship. Required submission documents include a mandatory bid response sheet, a completed work write-up, form HUD-5369-A, and proof of LBP certification. Preference may be given to TERO-certified bidders or Indian-owned enterprises. Compliance with the Davis-Bacon Act, Buy American provisions, and OSHA asbestos standards is mandatory. Payment is structured based on inspection milestones, with one payment at a minimum of 50 percent inspection and the final payment upon 100 percent completion and acceptance by the HACN Inspector. Bids are due by November 9, 2026, at 5:00 P.M.
Cherokee Nation Housing Authority

POSTED

about 17 hours ago

DEADLINE

in 19 days
NAICS: 236118
New
SLED
Solicitation A10-10-27-9713- Housing Rehab- Nowata County
Solicitation # A10-10-27-9713
The Housing Authority of the Cherokee Nation is soliciting bids for the electrical and HVAC rehabilitation of a single-family home located at 413 Shawnee Ave, Lenapah, Oklahoma, in Nowata County. The project must be completed within four working days, with work commencing within two weeks of notification. Failure to meet the completion deadline will result in liquidated damages of 100.00 dollars per working day. The contract will be awarded to the lowest responsive and responsible bidder, with evaluation factors including the bidder's current project load, history of on-time completion, quality of previous work, and any outstanding warranty issues. To be considered responsive, bidders must submit a fully completed Mandatory Bid Response sheet and Work Write Up. Preference will be given to bidders who provide proof of TERO certification through the Cherokee Nation Tribal Employment Rights Office. Required documentation includes a non-collusive affidavit, a drug and tobacco-free workplace statement, and OMB Standard Form LLLL for lobbying disclosure. The successful contractor must comply with Tribal rules, the Davis-Bacon Act, and HUD Section 3 requirements. Mandatory insurance includes Workers' Compensation, Automobile Liability, and Commercial General Liability. All iron, steel, and manufactured goods must adhere to Buy American provisions. Final payment is contingent upon the submission of closing documents and the formal acceptance of work by an HACN inspector.
Cherokee Nation Housing Authority

POSTED

about 17 hours ago

DEADLINE

in 15 days
NAICS: 236118
New
SLED
Solicitation A10-10-27-9688- Housing Rehab- Wagoner County
Solicitation # A10-10-27-9688
Solicitation A10-10-27-9688 is a Request for Bids issued by the Housing Authority of the Cherokee Nation for the rehabilitation of a single home located in Wagoner County, Oklahoma. The scope of work encompasses multiple trade areas, including plumbing, carpentry, flooring, appliances, and drywall and paint finish. The project must be completed within 45 working days, with work commencing within two weeks of notification. Failure to meet the completion deadline will result in liquidated damages of 100 dollars per working day. The contract requires a one-year warranty on all labor and workmanship, as well as the provision of all manufacturer warranties to the homeowner and the agency. The contract will be awarded to the responsible bidder who provides the lowest and most responsive bid, with evaluation factors including past performance, quality of work, and current project load. Bidders must comply with the Davis-Bacon Act, Buy American provisions, and Tribal Employment Rights Office (TERO) regulations. Required submission documents include a completed bid response sheet, work write-up, bid breakdown, and various HUD certifications such as Form HUD-5369-A and HUD-2530. Payment is structured with a minimum of 50 percent paid upon the initial inspection report and the final balance paid upon 100 percent completion and inspector approval. Bids are due by November 6, 2026, at 5:00 P.M.
Cherokee Nation Housing Authority

POSTED

1 day ago

DEADLINE

in 16 days
NAICS: 236118
New
SLED
CMS #211060 RFQ Pre-Disaster DRR
Solicitation # NLAA-2027000003
The State of Colorado Department of Local Affairs, Division of Local Government, is soliciting qualifications under RFQ NLAA-2027000003 to establish a Master Task Order Contract for its Disaster Resilience Rebuilding (DRR) Program. The program aims to facilitate community recovery through financial assistance across six program areas, including technical assistance and the reconstruction or rehabilitation of residential dwellings. Scope of work includes providing labor, equipment, and materials for repairs, as well as specialized services such as environmental compliance testing for lead, asbestos, and radon. Performance standards are governed by various codes, including the 2021 International Residential and Building Codes, 2010 ADA Standards, and HUD Housing Quality Standards. The selection process is based on a 100-point scale evaluating technical expertise, program management approach, cost reasonableness, past performance, personnel qualifications, and proposal completeness. Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) may receive an additional 5 points if they provide proper certification and maintain a Colorado presence. Awarded contractors must provide a one-year general warranty and a ten-year structural warranty, while adhering to strict data security standards for tax, health, and criminal justice information. Proposals must be submitted in PDF format via both email and the Rocky Mountain BidNet portal by the specified deadline.
DOLA - Division Of Local Government

POSTED

1 day ago

DEADLINE

in 2 days
NAICS: 236118
New
SLED
Solicitation A10-10-27-9704- Housing Rehab- Adair County
Solicitation # A10-10-27-9704
Solicitation A10-10-27-9704 is a Request for Bids issued by the Housing Authority of the Cherokee Nation for the rehabilitation of a single-family home located in Adair County, Oklahoma. The scope of work is comprehensive, requiring professional services in carpentry, plumbing, electrical, flooring, drywall, and paint and finish, including the installation of an ADA-approved handicap shower. The project must be initiated within two weeks of notification and completed within 15 working days, with liquidated damages of 100 dollars per day applied for any extensions beyond the contract end date. The contract will be awarded to the responsible bidder providing the lowest responsive bid, with special preference given to Indian enterprises if their bid is within the HUD-approved budget and no more than 25 percent higher than the lowest qualified bid. Award evaluation factors include the bidder's current project load, history of on-time completion, quality of previous work, and outstanding warranty issues. Compliance requirements are stringent, including adherence to Tribal rules, TERO regulations, the Davis-Bacon Act, and Buy American provisions. The awarded contractor must submit a variety of documentation within three days of notification, including general liability, auto, and workman's compensation insurance, core crew lists, and applicable trade licenses. For contracts exceeding 50,000 dollars, Form HUD-2530 is required. Final payment is issued as a single lump sum at 100 percent upon the HACN inspector's approval of the work and the submission of all closing documents.
Cherokee Nation Housing Authority

POSTED

1 day ago

DEADLINE

in 14 days

General Info

NAICS

236118 - Residential Remodelers

Place of Performance

USCG Station Wilmette Harbor 10 Harbor Dr, WILMETTE, IL, 60091, USA

Set-Aside

SBA

Documents

2

Construction_Clause.pdf

PDF

wage_rate.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Notice updated

Response deadline changed from Apr 8, 2015 to Apr 17, 2015. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Base CLEVELAND(00030)
Contacts2 people available
OfficeCLEVELAND, OH, 44199, USA
Office AddressCLEVELAND, OH, 44199, USA
Contacts

Full Description

Show more
Clause 52.222-6 Davis Bacon Act is incorporated DOL Wage Rates are attached, this contract will require contractors to pay their labors and mechanics employed under this contract no less than the locally prevailing wages and fringe benefits for corresponding work on similar projects in the area SECTION 1 - GENERAL INFORMATION 1.1 Scope of Work The contractor must provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to perform as defined in this performance work statement (PWS), The contractor must perform to the standards in this contract. 1.1.2 Place of Performance: 1.1.2.1 Unit: Station Wilmette Harbor Location: 10 Harbor Drive, Wilmette, IL, 60091 1.1.3 Contracting Officer: 1.1.3.1 Name: Joseph Easton Unit: Base Cleveland PH: 216-902-6339 FX: 216-902-6380 E-mail: 1.1.4 Contracting Officers' Technical representative / Unit POC: 1.1.4.1 Name: Kevin Eubanks Unit: Station Wilmette Harbor PH: 847-251-0185 FX: E-mail: Kevin.w.eubanks@uscg.mil 1.1.5 Contact for questions: 1.1.5.1 Any questions regarding scope of work must be directed to the Contracting Officer. 1.1.5.2 Unless specifically annotated below in part 1.5.3, all requests for site visits must be scheduled through the COTR. Requests can be submitted via phone call or e-mail. 1.2 Contractor Personnel 1.2.1 Contract Manager The contractor must provide a contract manager who must be responsible for the performance of the work. The name of this person, and an alternate or alternates, who must act for the contractor when the manager is absent, must be designated in writing to the contracting officer. 1.2.1.1 The contract manager or alternate must have full authority to act for the contractor on all contract matters relating to daily operation of this contract 1.2.1.2 The contact manager and alternate or alternates must be able to read, write, speak, and understand the English language. 1.2.2 Contractor employees The contractor must not employ persons for work on this contract if such employee is considered by the contracting officer to be a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population. 1.2.2.1 Contactor personnel must present a neat appearance and be easily recognized as contractor employees. 1.2.2.2 The contractor must not employ any person who is an employee of the U. S. Government if employing that person would create a conflict of interest. Additionally, the contractor must not employ any person who is an employee of the U. S. Coast Guard unless such person seeks and receives approval according to U. S. Coast Guard regulations. 1.2.3 Security requirements Due to heightened Security at USCG Facilities, all contractor employees performing tasks related to this PWS, while onboard a Coast Guard facility, shall wear identification badges. The identification badges must, at a minimum, contain contractors' business name, contractor employees' name, and contractor employees' picture. Time spent undergoing entrance to USCG facilities will not be considered a government delay of work or differing site condition. 1.3 Hours of Operation 1.3.1 The contractor must perform the tasks as required by the PWS under this contract during the following hours: Monday through Friday between 8:00am and 3:00pm unless other time is specified. 1.3.2 Holidays: If applicable 1.3.3 Special event, or adjusted work hours: If circumstances should arise wherein the contractor desires a different work schedule as required in section 1.3.1 above, the contractor must request same in writing. Submit written request to the government Contracting Officers Technical Representative (COR/COTR) a minimum of 24 hours before the requested adjusted work schedule. If the desired schedule change is to be effective on a Monday, the request must be submitted to the COR/COTR prior to 9:00am on the Friday prior to commencement of work. 1.4 Award It is the governments' intent to make award to the low cost responsive and responsible offeror through issuance of a firm fixed price contract. 1.5 Invoicing Invoices must be mailed in to address as per the contract. To insure proper payment, all invoices shall have requisition number/order number, company name and address, DUNS number, invoice number and date clearly indicated on your invoice. It is recommended that the offeror attach a copy of the Purchase Order / Contract to their invoice(s). SECTION 2 - DEFINITIONS 2.1 General Definitions When the PWS, solicitation provision or contract clause uses a word or term that is defined in the Federal Acquisition Regulations (FAR), the word or term has the same meaning as the definition as contained in section 2.101 of the FAR. The FAR index is available via the Internet at http://www.acqnet.gov at the end of the FAR, after the FAR Appendix. 2.1.1 Defective Service: A service or commodity output that does not meet the standard of performance requirement specified in the contract for that service or commodity. 2.1.2 Quality Assurance: A planned and systematic pattern of all government actions necessary to provide confidence that adequate technical requirements are established; products and services conform to established technical requirements; and satisfactory performance is achieved. Quality assurance refers to actions by the government assurance functions for a contracted service. 2.1.2 Quality Control: Those actins taken by a contractor to control the production of outputs to ensure that they conform to the contract requirements. 2.1.3 Technical Definitions: INSERT AS REQUIRED. IF NONE LISTED - NOT APPLICABLE TO CONTRACT. SECTION 3 - GOVERNMENT FURNISHED PROPERTY AND SERVICES 3.1 General Information The Government must provide the facilities, equipment, materials, and services listed here. 3.1.1 Government Furnished Facilities 3.1.1.1 3.2.1 Government Furnished Equipment 3.2.1.1 3.3.1 Government Furnished Material - Floor tile - 12" x 24" - 150 sq ft - Floor trim - 3" x 12" bull nose- 50 lf - Wall tile - 8" x 12" - 150 sq ft - Wall trim - 3" x 8" bull nose - 50 lf - Decorative tile - 10 sq ft - Vanities o 3" Filler o 33" x 21" o 33" x 21" - Counter Top - 67" x 22" - Customer to supply and install - Shower trim with valve - QTY (2) - Shower bases - 34" x 34" acrylic - WTY (2) - Shower shelves - 4 3.3.1.1 SECTION 4 - CONTRACTOR FURNISHED ITEMS AND SERVICES Except for those items, services, or commodities specifically stated in section 3 as government furnished, the contractor must furnish everything needed to perform this contract according to all its terms. ? SECTION 5 - SPECIFIC TASKS: MALE HEAD NOTES: Customer to complete all demolition Customer to haul away all debris Demo - Customer to remove wall partitions - Customer to remove toilets - Customer to remove sinks - Customer to remove all shower tile - Customer to remove all floor tile - Customer to remove all floor tile base trim - Customer to haul away all debris Plumbing - Install (2) new shower valves and trims o Existing locations - Install (2) new 34" x 34" shower pans - Acrylic o Adjust drain to accommodate new shower pans - Customer to Install (3) new lavatory faucets o Customer to make all final sink connections Wall Work - Install cement board from floor to ceiling in shower areas - Install 8" x 12" tile on shower walls to ceiling - Customer Supplied o Standard Grid Pattern - 8" H x 12" W o Power Grout - TBD Color on all tile work o Cap edges of tile with bull nose tile - Customer Supplied o See diagram for tile layout - Install 4" thick decorative tile strip through both showers o Start approx. 60" from floor - Install shelf above and below strip in corner of plumbing wall- Customer Supplied o 4 total soap shelves - Patch walls affected by our work to a paint ready finish Flooring - Install 12" x 24" tile on floor - Customer Supplied o Horizontal stair step pattern from door to window o Power Grout - TBD - Customer has grout samples o Install new 4 " Base trim - Primed White o Install new transition strip - Wood - Stain to match flooring Shower Bases - Install (2) new 34" x 34" acrylic shower bases - Customer Supplied o Adjust drains to accommodate new pans Cabinets - Install new vanity cabinetry - Customer Supplied - Going from LH wall to RH wall o " filler strip o 27" x 34" x 21" door base o 24" x 34" x 21" door base o 27" x 34" x 21" door base o " filler strip Counter Top - Customer Supplied and installed Painting - Patch all walls affected by our work to a paint ready finish o Coast Guard to paint upon completion Materials List Contractor to supply the following: - All general construction materials (cement board, adhesives, ...) - Power Grout - Color TBD - Walls - 25 LBS - Power Grout - Color TBD - Flooring - 25 LBS - Primed wood base trim - 4 " H US Coast Guard to supply the following: 1. Floor tile - 12" x 24" - 150 SQ FT 2. Wall tile - 8" x 12" - 155 SQ FT 3. Wall trim - 3" x 8" bull nose - 55 LN FT 4. Decorative tile - 10 SQ FT 5. Vanity Cabinetry a. 27" x 21" b. 27" x 21" c. 24" x 21" d. Filler Strip e. Filler Strip 6. Counter Top - Customer to fabricate and install 7. Under mount sinks - QTY 3 8. Shower trim with valve - 2 9. Lavatory faucets - QTY 3 10. Shower bases - 34" x 34" acrylic - QTY 2 11. Shower drains - QTY 2 12. Shower shelves - 4 Women's Head Customer to complete all demolition Customer to haul away all debris Demo - Customer to remove wall partitions - Customer to remove toilets - Customer to remove sinks - Customer to remove all bathroom walls down to studs - Customer to remove all wall tile - Customer to remove all floor tile - Customer to remove studs between closet and existing sinks - Customer to remove all drywall in and on closet - Customer to remove soffit over showers - Customer to remove vanity wall light - Customer to remove can lights over showers - Customer to remove(2) doors on closet wall - Customer to haul away all debris - Contractor to remove valves Plumbing - Install (2)new shower valves and trims - Customer Supplied o Existing valve locations o This wall cavity will be smaller - will most likely have to have one valve higher that the other for them both to fit - Install (2) new 34" x 34" shower pans - Acrylic - Customer Supplied - Relocate sink supply and drain lines and vent within new wall o New wall will be moved backwards from original location approx. 22" - Customer to Install (2) new lavatory faucets - Customer Supplied - Customer to supply and make all final sink connections Electrical - Install new (2) new 6" - can lights over sink location o Center over new sinks - Install (2) new 6" can lights in shower area o Center (1) can light over each shower pan o GFI protect can lights - Relocate outlets to fit in new wall - for each sink on back vanity wall Wall Work - Shower Walls - Install cement board from floor to ceiling in shower areas - Install 8" x 12" tile on shower walls - Customer Supplied o Standard grid pattern o Power Grout - TBD - Customer has grout samples o Cap edges of tile with bull nose tile - Customer Supplied - Install decorative tile strip through both showers o Start approx 60" from floor o 4" strip - Install shelf above and below strip in corner of plumbing wall and rear wall - Customer Supplied o 4 total soap shelves - See attached diagram - Patch walls affected by our work to a paint ready finish Wall Work - Bathroom Walls - Frame out new wall between bathroom and bedroom o This will be the existing closet door wall - Install drywall on new walls - Entire bathroom o Drywall to drywall ceiling transition - Frame out new cubby on LH side of toilet run o Area already marked out o Drywall finish sides of cubby o Install White wood shelf for bottom of cubby - Patch all walls affected by our work and prep for paint Flooring - Install cement board on floor - Install 12" x 24" tile on floor - Customer Supplied o Horizontal Stair Step Pattern - Parallel to vanity o Power Grout - TBD - o Install primed wood base trim - 4 " H o Install new wood transition - Stain to match wood floor Shower Base - Install (2) new 34" x 34" acrylic shower bases - Customer Supplied o Adjust drain locations to accommodate new pans Cabinets - Install new 67" vanity base run - wall to wall - Customer Supplied o From RH going left o " filler strip o 33" x 21" vanity base o 33" x 21" vanity base o " filler Counter Top - Customer Supplied and installed Painting - Leave walls affected by our work paint ready - Coast Guard to paint upon completion Materials List Contractor to provide the following - All general construction materials (cement board, grout, drywall, etc.) - Power Grout - Walls - 25 LBS - Power Grout - Flooring - 25 LBS - Unsanded caulk US Coast Guard to supply: - Floor tile - 12" x 24" - 150 sq ft - Floor trim - 3" x 12" bull nose- 50 lf - Wall tile - 8" x 12" - 150 sq ft - Wall trim - 3" x 8" bull nose - 50 lf - Decorative tile - 10 sq ft - Vanities o 3" Filler o 33" x 21" o 33" x 21" - Counter Top - 67" x 22" - HD to fabricate and install - Shower trim with valve - QTY (2) - Shower bases - 34" x 34" acrylic - WTY (2) - Shower shelves - 4

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS