Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Z--Ste. Genevieve National Historical Park - Well Dec

Awarded
140P6026Q0031Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract pertains to the permanent decommissioning and abandonment of four historic wells at the Ste. Genevieve National Historical Park in Missouri, specifically one well at the Jean Baptiste Valle House and three at the Kern House. The work requires pumping out water, controlled filling of subsurface voids with engineered rock and chat fill to eliminate collapse hazards, and reconstruction of historic masonry structures including well caps to match existing conditions, ensuring visual and structural compatibility with the park’s historic character. All activities must comply with Missouri Department of Natural Resources regulations under part 10 CSR 23-3.110 and federal environmental standards to prevent contamination of air, waterways, and subsoil. The contract is a Firm Fixed Price arrangement under a simplified acquisition procedure, designated as a total small business set-aside with a NAICS code of 237110 and a size standard of $45 million. Offerors must be registered as active in SAM and possess a Unique Entity Identifier, and must submit quotes via email to the Contracting Specialist by the specified deadline, without alternative stipulations. The period of performance is 180 calendar days from the Notice to Proceed, inclusive of all supply and material lead times, with FOB destination delivery terms. All materials, labor, taxes, and site-specific costs are included in the single line-item lump sum price. The contractor is required to implement a comprehensive accident prevention program with a site-specific safety plan, ensure all personnel use OSHA-compliant PPE including hard hats, maintain two sets of serviceable equipment, post emergency contact information on-site, and report all accidents promptly. Environmental and safety compliance, along with adherence to industry standards and manufacturer specifications, are mandatory. Utilities such as water, gas, and electricity from existing systems must be provided at no cost to the contractor. All work will be inspected by the government, and nonconforming deliverables must be corrected at no additional cost. Final acceptance requires submission of extensive documentation including as-built drawings, test reports, warranty certificates, payrolls for all subcontractors, SF-1413 forms, progress reports, material submittals, and a signed Release of Claims. Payment must be processed through the Treasury’s IPP system, with invoices needing PDF attachments, detailed pricing breakdowns, and signed approvals from the contractor, COR, and CO. The Contracting Officer holds sole authority for modifications, while the COR is limited to technical monitoring and lacks any financial or contractual modification powers. Green procurement preferences apply where applicable,

General Info

Fixed-price well decommissioning at Ste. Genevieve, Missouri, 180 days, small business set-aside.

Contract Value

$66,755

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

99 S Main ST, Ste Genevieve, NE, 63670, USA

Set-Aside

NONE

Award Issued Date

Documents

8

Amendment 0001 to Solicitation 140P6026Q0031

PDF, High priority: read this firstamendment
High

B08 Solicitation Attachment 1 - Project Specifications for Historic Well Decommissioning

PDF, High priority: read this firstspecifications
High

B08 Solicitation Attachment 2 - Statement of Work for Masonry Repointing

PDF, High priority: read this firstsow
High

B12 Misc Contractor Questions - NPS Response

DOCX, High priority: read this firstq-and-a
High

DOL Wage Determination MO20260030 for Missouri Building Construction

PDF, High priority: read this firstwage-determination
High

Limitations on Subcontracting Report Template v1 Dec 15 2016

XLSX, High priority: read this firstreport-template
High

RFQ 140P6026Q0031 for Well Decommission at Ste Genevieve National Historical Park

PDF, High priority: read this firstrfq
High

Solicitation Attachment 5 - Submittal List Template

XLS, High priority: read this firstsubmittal-list
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseAwarded
Posted

Solicitation

Notice updated

The notice title changed. The notice description changed.

Awarded

Contract was awarded

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Mwr Midwest REGION(60000)
Contacts1 person available
OfficeOMAHA, NE, 68102, USA
Office AddressOMAHA, NE, 68102, USA

Full Description

Show more
EO 14398, WELL DECOMMISSION, STGE

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business designations, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by the deadline of December 4, 2026. The scope of work involves comprehensive sewer installation and site development, including the open cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe from 18 to 24 inches. Key structural requirements include the installation of standard and doghouse manholes, interior drop assemblies, and a CSO regulator fit out. Specialized tasks include 24-inch DIP trenchless crossings with associated launch and receiving shafts, as well as the abandonment of existing pipes and manholes. Site work entails clearing and grubbing of 5,130 square yards of wooded areas, seeding, fine grading, and the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Critical project deliverables include the maintenance of flows and bypass for all pipes and manholes to ensure operational continuity, along with geotechnical instrumentation and monitoring. Additionally, the project requires specific railroad insurance. The bid schedule outlines various general and contingent items, including mobilization and extra depth excavation, though the total estimated contract value is not specified.
Cleary Construction, Inc.

POSTED

15 minutes ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer connections. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on responsiveness regarding the submission of MWBE documents, including the Good Faith Efforts Form and Table A. Performance is governed by EJCDC standard forms, including the C-700 General Conditions and C-800 Supplementary Conditions. The contractor is required to provide performance and payment bonds, as well as proof of insurance. Project timelines are triggered by a Notice to Proceed, and failure to achieve substantial completion will result in liquidated damages of 1,000 dollars per day. Payment is processed via applications for payment submitted to the Engineer, with terms due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

15 minutes ago

DEADLINE

in 11 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation and operation of a temporary 11 MGD pumped bypass. Additionally, the project entails the rehabilitation of reactor mixers and aerators, replacement of motor control center components, modifications to sluice and slide gates, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to various small business set-asides, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Subcontractors are specifically requested for lead abatement, metals fabrication, painting, coatings, FRP reinforcing systems, and access hatches. All subcontractors must utilize union labor and be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of bid for reimbursement. Quotes are due by November 17, 2026, and the final bid date is November 18, 2026. Contracts will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

15 minutes ago

DEADLINE

in 20 days
View Details

More opportunities from Department Of The Interior → Mwr Midwest REGION(60000)

Same awarding agency

NAICS: 713990
Federal
Amendment 2: Solicitation for Concession Opportunity for Lodging, Food and Beverage, Retail, Marina Services, and Mechanical Boat Portage within Voyageurs National Park
Solicitation # CC-VOYA002-27
The National Park Service is soliciting proposals for a ten-year concession contract, designated as CC-VOYA002-27, to provide lodging, food and beverage, retail, marina services, and mechanical boat portage within Voyageurs National Park. The scope of work includes the operation and management of facilities such as the Kettle Falls Hotel and associated villas. The selected concessioner will be responsible for routine maintenance, adhering to 18 CFR 600, Department of the Interior standards, and LEED silver ratings where feasible. Key operational requirements include strict adherence to manufacturer instructions for equipment, dark sky compliance for exterior lighting, and the use of licensed Minnesota contractors for fire suppression system maintenance. Environmental compliance is mandatory, specifically regarding the labeling and disposal of hazardous and universal waste. Interested parties must have submitted a Notice of Intent to Propose by September 16, 2026, to receive access to the Microsoft Teams platform for electronic proposal submission. The deadline for electronic proposals is October 22, 2026, by 4:00 p.m. Central Time. Additionally, a hardcopy of the Offeror’s Transmittal Letter featuring an original signature must be received by the National Park Service in Omaha, Nebraska, no later than October 29, 2026, at 4:00 p.m. Central Time. All inquiries and proposal coordination are managed by Tracy Simmons, the Commercial Services Chief for Interior Regions 3, 4, and 5.
All Other Amusement and Recreation Industries

POSTED

16 days ago

DEADLINE

in about 8 hours
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS