Steel Bridge Downspout System Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract involves the installation of 200 linear feet of steel pipe as part of a bridge downspout system designed to direct runoff from the bridge deck to ground-level drainage infrastructure. This work is classified as a subcontract under NAICS code 238210, indicating it falls within the specialty trade contracting sector, specifically related to plumbing and pipefitting. The project is being managed by MASSDOT, with the place of performance located in District 6, though specific city and state details are not provided. The solicitation was posted and had a response deadline on August 4, 2026, indicating this is a planned procurement with no immediate submission window, likely intended for future work scheduling. No set-aside provisions or organization type details are specified, suggesting the subcontract is open to general qualified vendors. The work is critical for maintaining the integrity and safety of bridge infrastructure by ensuring proper water drainage away from structural elements.
General Info
Agency
NAICS
Place of Performance
District 6, MA, USSet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
