Steel Deck Bridge Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This subcontract involves the fabrication and installation of a steel deck bridge for prime contractors working on California State Lands Commission refinery dock projects. The scope of work includes mounting the steel structure onto existing wooden foundations using cranes and welding equipment to provide critical structural reinforcement and emergency stabilization. The project requires strict adherence to structural engineering standards and mandates that all welding work be performed by AWS certified personnel. The final deliverable is a fully installed steel deck bridge designed to meet the specific safety and stability requirements of the refinery dock environment.
General Info
Agency
Place of Performance
CASet-Aside
Documents
This scope was carved out of Letter of Emergency Authorization for the C&H Sugar Company, Inc. Refinery Emergency Dock Repair.
The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
Earlier notices in this NAICS code
Posted before this notice, open and closed
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
