Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Health And Human Services was posted on July 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Stephenson Taylor Water Line Extension

Awarded
75H70126R00038Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont in North Carolina involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station. Key infrastructure work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The scope further encompasses the installation of mechanical and electrical systems, including pumps, a generator, and odor control equipment, along with gravity sewers, manholes, stormwater facilities, and site restoration. The project has an estimated value of 16,690,000 dollars and a substantial completion timeline of 560 calendar days. This solicitation, identified as SRP-W-134-0290, is a unit price contract awarded to the responsible bidder submitting the lowest responsive bid. Bidders must provide a completed EJCDC C-410 Bid Form, a bid bond, and evidence of authority to sign, while also demonstrating good faith efforts toward MWBE goals. The contract requires performance and payment bonds and adherence to strict technical standards, including AWWA Specification C-600 for pipelines and NEMA standards for motors. Payment is processed via monthly applications for payment, with funds becoming due 30 days after presentation to the owner. The project is set aside for small businesses, including certified veteran-owned, women-owned, and HUBZone small businesses.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, associated supports, valves, and piping appurtenances. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, the rehabilitation of reactor mixers and aerators, and the rerouting of sump pump discharge lines. Electrical and instrumentation work includes the installation of new or improved instrumentation, the rehabilitation and replacement of motor control center components, and modifications to existing sluice gates alongside the installation of new slide gates. The project also involves excavation, trench work, and surveying of key points around the reactors. This is a union project, and all subcontractors must utilize union labor. Potential subcontractors must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid for reimbursement. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026. This opportunity is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone firms.
Garney Pacific, Inc.

POSTED

about 1 hour ago

DEADLINE

in 20 days
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities (Project No. EN19001.03) and Butterfield Lift Station Improvements (Project No. EN26054) located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 dual force mains from El Prado Road to Kimball Avenue. Additionally, the project requires the construction of a new Mountain Avenue Lift Station featuring a concrete wet well and submersible pumps, modifications to the RP-2 Lift Station to include an elevated electrical platform and standby generator, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operation. Filanc is seeking quotes from various trades, including SWPPP, survey, aggregates, demolition, paving, precast concrete, masonry, metals, coatings, process equipment, fire suppression, piping, and electrical and instrumentation and control. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on equal opportunity and DBE participation. Bids are due by 2:00 PM on October 29, 2025. The primary point of contact for this opportunity is Julia Masaitis.
Filanc

POSTED

about 1 hour ago

DEADLINE

in about 10 hours

AI Contract Overview

Show more

The Stephenson-Taylor Water Line Extension project, solicited under number 75H701-26-R-00038, is a construction initiative sponsored by the Indian Health Service to expand water infrastructure for Caddo County Rural Water District No. 3 in Binger, Oklahoma. The project requires the installation of 10,940 feet of 2-inch DR 11 HDPE water main and 870 feet of 4-inch DR11 HDPE casing, along with directional boring for 815 feet across two roads, a driveway, and a creek, as well as two open-cut gravel road crossings totaling 55 feet. All water mains must maintain a minimum 5-foot horizontal and 2-foot vertical separation from existing gas lines. Four residential service connections are included, consisting of 400 feet of 1-inch PE and 870 feet of 1.5-inch PE line with necessary appurtenances such as gate valves, flush hydrants, air relief valves, tracer wire, locate stations, anode bays, thrust blocks, and fittings. The contractor must conduct pressure testing, disinfection, and bacteriological testing of the completed water main, submitting two consecutive negative test results 24 hours apart, with any re-sampling at the contractor’s expense. Completion includes connecting the new line to the existing Caddo County system. The project is strictly designated as a 100% set-aside for Indian Small Business Economic Enterprise (ISBEE) under NAICS code 237110, with a size standard of $45 million, and will be awarded through a Firm Fixed Price contract using the Lowest Price Technically Acceptable evaluation method. The total estimated value ranges between $250,000 and $500,000, with a performance period of 90 calendar days from the notice to proceed. A mandatory site visit is scheduled for July 24, 2026, at 10:00 AM CT. All solicitation documents are accessible exclusively through SAM.gov, and registration in the System for Award Management is required for eligibility. Proposals must be submitted by August 19, 2026, and offerors are responsible for regularly checking SAM.gov for any amendments or updates; hard copies are not provided. The procurement is managed by the Division of Engineering Services in Seattle under the Department of Health and Human Services

General Info

Indian Small Business to extend 10,940 ft HDPE water line in Oklahoma under $500K Firm Fixed Price contract.

Contract Value

$770,827

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

Caddo, OK, USA

Set-Aside

ISBEE

Award Issued Date

Documents

10

Amendment A00001 to Solicitation 75H70126R00038

PDF, High priority: read this firstamendment
High

Attachment J04 - Company Specialized Experience Form - Construction

PDF, High priority: read this firstcompany-specialized-experience-form
High

Attachment J05 Past Performance Questionnaire for Solicitation 75H70126R00038

DOCX, High priority: read this firstpast-performance
High

Self-Performed Calculation Sheet for Limitations on Subcontracting

DOCX, High priority: read this firstself-performed-calculation-sheet
High

Solicitation 75H701-26-R-00038 Stephenson Taylor Water Line Extension

PDF, High priority: read this firstrfp
High

Statement of Work for Water Line Extension Project OK 23-W92

PDF, High priority: read this firstsow
High

Stephenson Line Extension Bid Specifications OK23-W92

PDF, High priority: read this firstspecifications
High

Stephenson Water Line Extension Plan Set March 2026

PDF, High priority: read this firstspecifications
High

Wage Determination OK20260036 Heavy Construction Oklahoma Counties

PDF, High priority: read this firstwage-determination
High

IHS Buy Indian Act Indian Economic Enterprise Representation Form

PDF, Low priorityrepresentation-form
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Health And Human Services → Division Of Engineering Svcs - Seattle
Contacts1 person available
OfficeSEATTLE, WA, 98121, USA
Office AddressSEATTLE, WA, 98121, USA

Full Description

Show more

***A00001 has been issued. Refer to B05 Amend A00001 for details. 


This is a SOLICITATION NOTICE for the upcoming Solicitation 75H701-26-R-00038 Stephenson-Taylor Water Line Extension a construction project prepared in accordance with FAR Part 36. These construction services are in support of the Indian Health Service (IHS).


A full scope of work, plans and specifications and Construction Wage Determination is included in the solicitation documents. Additional details can be found in the solicitation when it is posted to https://sam.gov.


SCOPE OF WORK: This acquisition is to obtain all required commercial services, equipment, materials, and supplies to construct a water line extension for Caddo County Rural Water District No. 3.


  1. Furnish and install 10,940 feet of 2-inch DR 11 HDPE water main and 870 feet of 4-inch DR11 HDPE as casing.
  2. Directional Bore 815 feet total including 2 road crossings, 1 driveway crossing, and 1 creek crossing.
  3. 2 open cut gravel road crossings totaling 55 feet.
  4. Case the water main or maintain a 5-foot horizontal and 2-foot vertical separation requirement from all gas lines. 
  5. Furnish and install 4 water main taps, water meters, and water service lines to homes. This includes 400 feet of 1-inch PE and 870 feet of 1.5-inch PE and appurtenances.
  6. Furnish and install appurtenances including all gate valves, flush hydrants, air relief valves, tracer wire, locate stations, anode bays, thrust blocks, and fittings.
  7. Complete pressure testing and provide results to the project engineer.
  8. Satisfactorily complete disinfection and bacteriological testing of completed water main. Provide results to the project engineer. 2 consecutive negative tests 24hrs apart. Re-sampling of positive tests is to be performed at contractor expense.
  9. Connect installed water line extension to Caddo County Rural Water District No. 3.

LOCATION OF PROJECT: All work shall be performed at three sites in Binger, Oklahoma.


PERIOD OF PERFORMANCE: Period of Performance is 90 calendar days from date of notice of proceed.


CONSTRUCTION MAGNITUDE: The magnitude of this construction project is anticipated to be between $250,000 and $500,000.


SITE VISIT: A site visit will be held on 24 July 2026 at 10:00AM CT. See L.6 for more details.


CONTRACT TYPE: IHS intends to award a single Firm Fixed Price (FFP) contract in support of this requirement.


This solicitation will be procured as a Request for Proposal (RFP) in accordance with FAR Part 36 procedures with Lowest Price Technically Acceptable (LPTA) evaluation criteria.


This project will be solicited as 100% set aside for Indian Small Business Economic Enterprise (ISBEE) pursuant to the Buy Indian Act under North American Industry Classification System (NAICS) code 237110, Water and Sewer Line and Related Structures Construction. The associated size standard for this procurement is $45 million. For information concerning NAICS and SBA size standards, go to http://www.sba.gov.


NOTE: ALL DATES ARE SUBJECT TO CHANGE. SEE SOLICITATION FOR OFFICIAL DATES, TIMES, AND LOCATIONS OF SITE VISITS AND DEADLINES.


Registration in the System for Award Management (SAM) database is mandatory to be considered for award. Offerors may obtain information on registration and annual confirmation requirements via the internet at: https://www.sam.gov. Contractors are encouraged to complete SAM registration as soon as possible; the Government may not delay award for the purpose of allowing a contractor additional time to register in SAM.


It is the responsibility of the contractor to check https://www.sam.gov frequently for any amendments or changes to the solicitation. Hard copy documents will NOT be available – all


This is a SOLICITATION NOTICE for the upcoming Solicitation 75H701-26-R-00038 Stephenson-Taylor Water Line Extension a construction project prepared in accordance with FAR Part 36. These construction services are in support of the Indian Health Service (IHS).


A full scope of work, plans and specifications and Construction Wage Determination is included in the solicitation documents. Additional details can be found in the solicitation when it is posted to https://sam.gov.


SCOPE OF WORK: This acquisition is to obtain all required commercial services, equipment, materials, and supplies to construct a water line extension for Caddo County Rural Water District No. 3.


  1. Furnish and install 10,940 feet of 2-inch DR 11 HDPE water main and 870 feet of 4-inch DR11 HDPE as casing.
  2. Directional Bore 815 feet total including 2 road crossings, 1 driveway crossing, and 1 creek crossing.
  3. 2 open cut gravel road crossings totaling 55 feet.
  4. Case the water main or maintain a 5-foot horizontal and 2-foot vertical separation requirement from all gas lines. 
  5. Furnish and install 4 water main taps, water meters, and water service lines to homes. This includes 400 feet of 1-inch PE and 870 feet of 1.5-inch PE and appurtenances.
  6. Furnish and install appurtenances including all gate valves, flush hydrants, air relief valves, tracer wire, locate stations, anode bays, thrust blocks, and fittings.
  7. Complete pressure testing and provide results to the project engineer.
  8. Satisfactorily complete disinfection and bacteriological testing of completed water main. Provide results to the project engineer. 2 consecutive negative tests 24hrs apart. Re-sampling of positive tests is to be performed at contractor expense.
  9. Connect installed water line extension to Caddo County Rural Water District No. 3.

LOCATION OF PROJECT: All work shall be performed at three sites in Binger, Oklahoma.


PERIOD OF PERFORMANCE: Period of Performance is 90 calendar days from date of notice of proceed.


CONSTRUCTION MAGNITUDE: The magnitude of this construction project is anticipated to be between $250,000 and $500,000.


SITE VISIT: A site visit will be held on 24 July 2026 at 10:00AM CT. See L.6 for more details.


CONTRACT TYPE: IHS intends to award a single Firm Fixed Price (FFP) contract in support of this requirement.


This solicitation will be procured as a Request for Proposal (RFP) in accordance with FAR Part 36 procedures with Lowest Price Technically Acceptable (LPTA) evaluation criteria.


This project will be solicited as 100% set aside for Indian Small Business Economic Enterprise (ISBEE) pursuant to the Buy Indian Act under North American Industry Classification System (NAICS) code 237110, Water and Sewer Line and Related Structures Construction. The associated size standard for this procurement is $45 million. For information concerning NAICS and SBA size standards, go to http://www.sba.gov.


NOTE: ALL DATES ARE SUBJECT TO CHANGE. SEE SOLICITATION FOR OFFICIAL DATES, TIMES, AND LOCATIONS OF SITE VISITS AND DEADLINES.


Registration in the System for Award Management (SAM) database is mandatory to be considered for award. Offerors may obtain information on registration and annual confirmation requirements via the internet at: https://www.sam.gov. Contractors are encouraged to complete SAM registration as soon as possible; the Government may not delay award for the purpose of allowing a contractor additional time to register in SAM.


It is the responsibility of the contractor to check https://www.sam.gov frequently for any amendments or changes to the solicitation. Hard copy documents will NOT be available – all documents for proposal purposes will be posted at the website for download by interested parties.

More opportunities from Department Of Health And Human Services → Division Of Engineering Svcs - Seattle

Same awarding agency

NAICS: 237110
New
Federal
Rosebud Lift Station Construction
Solicitation # 75H70127R00007
Solicitation 75H70127R00007 is a firm fixed price construction project for the Rosebud Comprehensive Health Care Facility in South Dakota, managed by the Department of Health and Human Services. The project requires the full removal and replacement of an aging lift station that currently services the hospital, quarters units, and tribal program buildings. Due to significant facility expansion and frequent pump failures, the new installation must include a larger wet well, a dry well, chopper pumps to handle foreign objects, and a force main connection. Additionally, a new control system will be implemented to monitor equipment status and flow. The contract will be awarded using the Lowest Price Technically Acceptable (LPTA) method to a bidder who demonstrates a minimum of one sewage lift station replacement project within the last five years and provides an acceptable technical approach. The procurement is open to full and open competition under NAICS 237110, with a 10 percent price evaluation preference for HUBZone small businesses. Key requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds, and the use of the Department of Treasury Invoice Processing Platform for electronic payments. All materials must be new and delivered in original manufacturer packaging.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Federal
Jennifer Brown (COW)
Solicitation # 75H70126Q00036
Solicitation 75H70126Q00036 is a total small business set-aside request for quotes issued by the Indian Health Service Division of Engineering Services for the installation of a replacement individual septic system at a residential property in Ridgefield, Washington. The project scope includes the installation of a 1500-gallon septic tank, a 1050-gallon dose tank with timed dosing controls, a 1440 square foot subsurface drip dispersal field, and associated sewer piping and cleanouts. The estimated contract magnitude is between $25,000 and $100,000, with a firm fixed price award based on price and compliance. Eligible offerors must be Clark County certified septic installers and registered in the System for Award Management. The period of performance requires work to commence within 10 calendar days of the notice to proceed and be completed within 30 calendar days. Contractors must adhere to Davis-Bacon wage determinations and OSHA trench safety regulations. Key deliverables include daily reports and final as-built drawings. Payment will be processed electronically via the Department of Treasury Invoice Processing Platform. Proposals must include a completed SF1442 and a full Section B Price Schedule, with a submission deadline of October 30, 2026, at 2:00pm CDT. Amendment A00001 was issued to provide clarifications on materials, piping, and permitting.
Water and Sewer Line and Related Structures Construction

POSTED

6 days ago

DEADLINE

in 2 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS