Stone Beetland 69 kilovolt (kV) Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Stone Beetland 69kV Project, managed by the Sacramento Municipal Utility District (SMUD), involves upgrading existing lower voltage infrastructure and constructing new 69kV lines around the Stone Beetland development in the Meadowview neighborhood of Sacramento, California. The scope of work includes upgrading approximately 0.55 mile of existing 12kV overhead line along the northern boundary with stronger, taller poles and a 69kV circuit, as well as installing approximately 950 feet of new overhead 69kV line with three new wood or metal poles along the western boundary. The project will tie into existing 69kV lines on Cosumnes River Boulevard to improve regional electric system reliability, operational flexibility, and capacity for future load growth. Construction is scheduled to take place during daylight hours, beginning in March 2026 and concluding by July 2026. The project is classified under NAICS code 237130 and has been granted a Notice of Exemption under CEQA Sections 15301, 15302, and 15303, confirming that no further environmental review is required. Kim Crawford serves as the primary point of contact and Environmental Management Specialist for the lead agency.

General Info

SMUD will upgrade 69kV electric lines in Sacramento from March to July 2026.

Agency

California → Sacramento Municipal Utility District

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

Sacramento, CA

Set-Aside

NONE

Documents

(1)

Stone Beetland 69kV Project Notice of Exemption 12-16-2025

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Sacramento Municipal Utility District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Sacramento Municipal Utility District
Office AddressN/A
Contacts
Kim CrawfordEnvironmental Specialist

Full Description

Show more
The Stone Beetland 69kV Project (Project) consists of upgrading existing lower voltage lines to 69kV and constructing new 69kV lines along the perimeter of the Stone Beetland development project. Approximately 0.55 mile of existing 12kV overhead line located along the northern boundary of the development project will be upgraded with taller, stronger poles and 69kV circuit. Along the western boundary of the development project, approximately 950 feet of new overhead 69kV line will be installed which will include approximately 3 new wood or metal poles. The Project will tie into existing 69kV lines on Cosumnes River Boulevard and is needed to enhance the reliability of the electric system across the region, improve the operational flexibility of the electric system and accommodate future load growth. Construction activities will occur during daylight hours. Construction is expected to begin March 2026 and be completed by July 2026.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
Kittrell Job Corps Center-12 Strand Fiber Optic Replacement- Bldg 2, Bldg 3, Bldg 4
Solicitation # kittrell-job-corps-center-12-strand-fiber-optic-replacement-bldg-2-bldg-3-bldg-4
Covenant Learning Solutions, operator of the Kittrell Job Corps Center in North Carolina, is soliciting sealed bids for the replacement of 12-strand aerial fiber optic cables and associated connectors between Buildings 2, 3, and 4. The contractor is responsible for providing all labor, materials, equipment, and supervision to install outdoor-rated fiber optic cable along existing aerial pathways and terminate them into existing network switches. A critical requirement of this project is that the existing network service must remain fully operational without interruption until the owner authorizes the final switch-over. The contractor must also provide a construction timeline for approval during a pre-construction meeting and adhere to standard work hours of 8:00 AM to 3:00 PM, Monday through Friday. The project requires strict adherence to industry standards, local codes, and manufacturer specifications regarding cable support and bend radius. Acceptance is contingent upon successful Optical Loss Testing, OTDR testing, continuity testing, and polarity verification, as well as the submission of a complete closeout package with as-built documentation. Bidders must hold a valid North Carolina General Contractor license and maintain all necessary Builder's Risk and Liability insurance. Proposals must be submitted via email to Rachelle Judkins by September 30, 2026, and must include a completed Mandatory Bid Document. Payment will be issued as a single lump sum upon project completion, provided all required purchasing documentation is submitted.
Covenant Learning Solutions operator of Kittrell Job Corps Center

POSTED

about 14 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237130
New
Federal
Sources Sought for the Recapitalization of the Navy’s High Voltage (230kV) Transmission Loop and all Ancillary Equipment at Naval Submarine Base Kings Bay, GA
Solicitation # N69450-26-R-PW20
This sources sought notice seeks to identify qualified offerors for the wholesale recapitalization and cybersecurity hardening of the 230kV high voltage transmission loop and all ancillary equipment at Naval Submarine Base Kings Bay, Georgia. The project is envisioned as a design-build effort with an estimated magnitude between $100 million and $250 million and an anticipated period of performance of approximately 900 calendar days. Key technical requirements include the relocation of the high power loop and crossing tower, replacement of conductors, installation of smart motor-operated disconnects and vacuum/SF6 circuit breakers, and the modernization of substation digital protective relays. All telemetry and relay configurations must comply with NERC CIP standards and DoD Unified Facilities Criteria 4-010-06 for Industrial Control Systems. Due to the critical nature of the nuclear deterrent mission and the requirement for seamless integration with the Georgia Power Company (GPC) macro-grid, the government is considering this procurement under other than full and open competition. Potential sources must demonstrate significant financial capability, including a single project bonding capacity of $200 million, and possess specialized experience in 230kV live cutovers and cryptographic SCADA telemetry interconnection. Security requirements are stringent, requiring U.S. citizenship and at least Tier 3/Secret clearance for key personnel, including project managers and cybersecurity leads, to access restricted areas such as nuclear-support zones and the Defensive Ordnance Support Facility. Responses are due by 2:00 PM EDT on October 6, 2026, under NAICS codes 237130 or 221122.
Navfacsyscom Southeast

POSTED

1 day ago

DEADLINE

in 14 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS