Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Stone Dumped Rip Rap Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the Georgia Department of Transportation involves the supply and installation of dumped stone rip rap for bridge projects located in Walker and Whitfield. The contractor is responsible for transporting, dumping, and grading Type 1, 24-inch stone rip rap to ensure proper erosion control and slope stabilization in accordance with GDOT Item 603-2024 specifications. The scope of work requires the use of heavy hauling trucks and loaders to deliver and install a total of 49,000 square yards of rip rap. This project falls under NAICS code 238910 and is designed to support prime contractors in meeting state infrastructure requirements.

General Info

Subcontract for installing 49,000 square yards of stone rip rap for GDOT bridge projects.

Agency

Georgia Department of TransportationView Agency

NAICS

238910 - Site Preparation ContractorsView NAICS

Place of Performance

Walker, Whitfield, GA, USA

Set-Aside

NONE

Documents

This scope was carved out of B1CBA2602616-0.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Call 013 B1CBA2602616-0

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia Department of Transportation
ContactsNo contacts available
OfficeN/A
Organization / Agency
Georgia Department of Transportation
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs dumped stone rip rap for prime contractors on Georgia Department of Transportation (GDOT) bridge projects. Transports, dumps, and grades Type 1, 24-inch stone rip rap for erosion control and slope stabilization per GDOT Item 603-2024 specifications. Utilizes heavy hauling trucks and loaders. Delivers 49,000 square yards of installed rip rap.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
Demolition of Structure, 51 Main Street, Durham - Bid Extended
Solicitation # 39005
The Town of Durham, Connecticut, is soliciting sealed bids from licensed contractors for the complete demolition and removal of a wood-framed structure and its concrete foundation at 51 Main Street. The scope of work includes installing 220 linear feet of 8-foot-high chain-link fencing, demolishing the structure and foundation walls into the existing cellar hole, removing three wooden poles from the rear parking lot, and performing final site cleanup and backfilling. Contractors must implement water-based dust suppression and comply with all OSHA and environmental regulations. The contract will be awarded to the lowest responsible and qualified bidder based on price, past performance, financial responsibility, and experience with similar projects. The final bid deadline has been extended to October 8, 2026, at 2:00 p.m. Required submission materials include a lump-sum project price, a 10 percent bid bond or cashier's check, proof of licenses and insurance, and three professional references. Upon award, the contractor must provide a Labor and Materials Payment bond and a Performance Bond, each for 100 percent of the contract price via AIA Document A312. Payment will be issued within 30 days of invoicing based on the percentage of work completed. Additional requirements include compliance with Connecticut prevailing wage laws for bids exceeding 100,000 dollars, adherence to non-discrimination and ADA standards, and the execution of a nondisclosure agreement. Final payment is contingent upon a site inspection and the submission of disposal records and air quality reports.
DAS Procurement

POSTED

about 11 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS