Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on July 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Storm Drain Repair Project

Closed
15-135State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Additional deliverables include the installation of new gravity sewers, manholes, and a fully operational pumping station equipped with mechanical and electrical systems, a generator, and odor control equipment. The project has an estimated value of 16,690,000 dollars. This solicitation is set aside for Small Businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone Small Businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation criteria focusing on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts and Table A. The agreement is based on EJCDC standard forms, requiring performance and payment bonds, as well as proof of insurance. Bids are due by November 10, 2026, with a final bid opening date of November 12, 2026. Contract administration involves monthly progress payments due 30 days after presentation to the owner, subject to review by the Engineer and the Resident Project Representative. The contractor must adhere to rigorous technical standards, including AWS D1.2 for welding and NEMA standards for motors. Materials must be delivered in original manufacturer packaging with specific labeling and storage requirements, such as maintaining a minimum ambient temperature of 45 degrees Fahrenheit for coatings. The project commences upon the issuance of a Notice to Proceed, which typically occurs within 30 to 60 days of the bid opening or effective date.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing, restoration, and the installation of FRP reinforcing systems. Mechanical and structural requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation of new slide gates and modifications to existing sluice gates. Additional technical tasks include the rehabilitation of reactor mixers and aerators, the installation and operation of a temporary 11 MGD pumped bypass, and extensive electrical and instrumentation upgrades, including the replacement of motor control center components. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of bid for reimbursement. Requested services and supplies include lead abatement, metals fabrication, painting and coatings, trucking and hauling, and the provision of access hatches. Quotes are due by November 17, 2026, at 2:00 PM PT, with the final bid date set for November 18, 2026. Submissions should be based on Garney Standard PO and Subcontract Forms, with any exceptions submitted as redlines.
Garney Pacific, Inc.

POSTED

about 2 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The City of Roseville, California is seeking proposals for a storm drain repair project that involves relining aging drainpipes using a cure-in-place liner and installing new drainpipes at five designated locations within the city. The project has an engineer’s estimate of $1.66 million and is being managed by Project Engineer Joe Arino. All communications regarding this project must be submitted through Public Purchase and any inquiries must be made no later than 3 PM on July 28, 2026. Proposals are due by 3:00 PM on August 4, 2026, and the RFP was advertised in the Press Tribune on July 24, 2026. The full specifications and contract documents can be accessed via the City of Roseville’s procurement website, with precedence for resolving discrepancies outlined in the Special Provisions’ Discrepancies and Omissions section. The solicitation number is 15-135, and the primary point of contact for questions is Joseph Arino, reachable via email or phone as listed in the contract data.

General Info

Roseville seeks storm drain repairs via relining and new pipes, $1.66M budget, proposals due August 4, 2026.

Place of Performance

Roseville, CA, 95678, USA

Set-Aside

NONE

Documents

8

2026 Storm Drain Repair Project - City of Roseville CA

PDF, High priority: read this firstspecifications
High

2026 Storm Drain Repair Project - City of Roseville CA

PDF, High priority: read this firstspecifications
High

Addendum No. 2 – Storm Drain Repair Project

PDF, High priority: read this firstamendment
High

Sealed Proposal Instructions and Label for City of Roseville RFP

PDF, High priority: read this firstspecial-notice
High

Storm Drain Repair Project Addendum No. 1

PDF, High priority: read this firstamendment
High

Storm Drain Repair Project Addendum No. 3

PDF, High priority: read this firstamendment
High

STORM DRAIN REPAIR PROJECT - City of Roseville Project Manual

PDF, High priority: read this firstrfp
High

STORM DRAIN REPAIR PROJECT - City of Roseville Proposal Manual

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Roseville
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Joe Arino

Full Description

Show more
Bid #500259: The project consists of the installation of storm drain pipes, drain inlets, manholes, and PVC pipe lining at multiple locations including Royer Park, Edgemont Way, Piedmont Way, East St., and PFE Rd. The scope includes excavation, installation of RCP, DIP, and HDPE pipes, sewer lateral replacement, construction of concrete curb, gutter, and ADA curb ramps, as well as associated asphalt concrete paving, cold planing, and application of traffic markings. The contractor is responsible for all traffic control, water pollution control measures, and construction surveying.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS