Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Storm Drain Trash Capture System Installation

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Storm Drain Trash Capture System Installation supports prime contractors on Caltrans District 8 storm water mitigation projects within the San Bernardino and Riverside areas. The scope of work involves the installation of debris traps, catch basin inserts, and specialized filtration hardware, ensuring all systems are fully operational and installed according to Caltrans standard maintenance practices. The contractor is required to utilize specialized lifting equipment for grate removal and must strictly adhere to all Caltrans environmental compliance protocols. Classified under NAICS code 238910, the project focuses on delivering effective storm water mitigation infrastructure to meet agency standards.

General Info

Subcontract for installing storm drain trash capture systems for Caltrans District 8 projects.

Agency

California → Caltrans, District 8 - San Bernardino/Riverside

Place of Performance

CA

Set-Aside

NONE

Documents

This scope was carved out of 1M380.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Storm Water Mitigation

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom Storm Water Mitigation
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 8 - San Bernardino/Riverside
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Caltrans, District 8 - San Bernardino/Riverside
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs trash capture devices and filtration systems for prime contractors on Caltrans District 8 storm water mitigation projects. Installs debris traps, catch basin inserts, and specialized storm drain filtration hardware according to Caltrans standard maintenance practices. Uses specialized lifting equipment for grate removal. Adheres to Caltrans environmental compliance protocols. Delivers fully installed and operational storm water trash capture systems.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
Hilltop Reservoir Grass Turf And Irrigation Project
Solicitation # PW 26-17
The Hilltop Reservoir Grass Turf and Irrigation Project (PW 26-17) is a solicitation by the City of El Segundo, California, for renovation improvements at a site located north of the intersection of Grand Ave and Lomita St. The scope of work includes the partial demolition of an existing reservoir, backfilling and grading the site for future park use, and the installation of landscaping, a reclaimed water irrigation system, perimeter fencing, and a new manual vehicular gate. Additionally, the project requires the construction of an 8-foot-high reinforced masonry site wall and general site demolition. The contractor is responsible for traffic control, protecting existing utilities, and managing construction and demolition waste recycling. The contract will be awarded to the lowest responsible bidder who is financially qualified and licensed according to state regulations. Bids must be submitted in writing on provided proposal forms and include bid security equal to 10% of the lump sum base bid. Performance must be completed within 60 working days from the Notice to Proceed, followed by a 90-day landscape maintenance and establishment period. All work is subject to the inspection and approval of the City Engineer or City Inspector, with specific labeling requirements for fire supply lines and water valves to distinguish between potable, non-potable, and recycled water. There is no specified set-aside status for this solicitation.
CITY OF EL SEGUNDO

POSTED

about 3 hours ago

DEADLINE

in 26 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS