Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Texas was posted on January 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Storm Drainage and Culvert Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
The Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project in Oakland, California, is a comprehensive infrastructure effort for the East Bay Municipal Utility District. The scope of work involves the rehabilitation of open and covered concrete structures, including resurfacing and the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, the installation of valves and piping appurtenances, and the modification of sluice and slide gates. Additionally, the project requires the rehabilitation of reactor mixers and aerators, the replacement of motor control center components, and the installation of new electrical and instrumentation systems. Support services include the operation of a temporary 11 MGD pumped bypass, lead abatement, excavation, trench work, and surveying. This solicitation is set aside for Small Business (SB), including SBA certified Veteran Owned Small Business (VOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Women-Owned Small Business (WOSB), and HUBZone Small Business (HUBZone SB). Garney Pacific, Inc. is seeking qualified subcontractors, specifically targeting those with DBE, MBE, WBE, and SBE certifications. All subcontractors must utilize union labor and be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company. Quotes are due by November 17, 2026, with a final bid date of November 18, 2026.
Garney Pacific, Inc.

POSTED

about 7 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The Storm Drainage and Culvert Installation subcontract, issued by the Collin County Community College District in Texas, involves the installation of storm sewers, catch basins, and culverts. The primary objective of the project is to manage surface water runoff along the ring road to ensure proper drainage and infrastructure stability. The project is categorized under NAICS code 237110. There is no specified set-aside status for this procurement. Interested parties can find further details via the provided Texas SmartBuy link.

General Info

Agency

Texas → COLLIN COUNTY COMMUNITY COLLEGE DISTRICT

Place of Performance

TX, USA

Set-Aside

NONE

Documents

This scope was carved out of FY2026-CSP-045.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Collin College Plano Campus Ring Road

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 14 days
  • Lift Station No. 85 ReplacementOpen now, due in 25 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

subcontract

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → COLLIN COUNTY COMMUNITY COLLEGE DISTRICT
ContactsNo contacts available
OfficeN/A
Organization / Agency
Texas → COLLIN COUNTY COMMUNITY COLLEGE DISTRICT
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of storm sewers, catch basins, and culverts to manage surface water runoff along the ring road.

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS