Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Storm Drainage System Installation and Rerouting

Open
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract involves the installation of various storm drainage components such as catch basins, pipes, manholes, and underdrains, along with the rerouting of a storm drain trunkline. The work is to be performed in New London and focuses on improving the existing storm drainage infrastructure to enhance water management and flow. The contract is a subcontract under a Total Small Business Set-Aside in accordance with FAR 19.5 provisions, emphasizing opportunities for small businesses. It falls under NAICS code 237110, which covers water and sewer line construction. The contracting agency is the Department of Homeland Security, specifically Ceu PROVIDENCE(000G1), reflecting a government-led infrastructure effort to support community resilience and public safety.

General Info

Install storm drainage systems and reroute trunkline in New London under small business subcontract.

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

New London, CT, USA

Set-Aside

SBA

Documents

This scope was carved out of 70Z0G126BCGA000NP.

The full solicitation package (12 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

REPAVE CGA, PSN 30134884

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 12 documents on the prime contractFrom REPAVE CGA, PSN 30134884
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Ceu PROVIDENCE(000G1)
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of storm drainage components including catch basins, pipes, manholes, and underdrains, with rerouting of a storm drain trunkline.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
SLED
East Highlands Sanitary Sewer Replacement Phase II
Solicitation # 26-215
The East Highlands Sanitary Sewer Replacement Phase II (Solicitation 26-215) is a public works project for the City of Naperville, Illinois, managed by the Department of Public Utilities. The scope of work involves filling and abandoning existing sanitary sewers and manholes and installing approximately 4,400 linear feet of 8-inch and 1,000 linear feet of 10-inch sanitary sewers, along with manholes and 6-inch sanitary services. Work will be performed across several locations, including E Hillside Rd, Sunset Dr, Thornwood Dr, Pine Ct, Santa Maria Dr, Willow Rd, and Diane Ln. The project also requires extensive restoration, including driveway and roadway pavement patching, curb and gutter replacement, traffic control, and landscape restoration, all performed in accordance with the latest IDOT Standard Specifications and ADA guidelines. The contract will be awarded to the lowest responsible bidder based on factors such as performance history, financial capacity, and technical suitability. Bidders must have completed five similar projects in the last five years and maintain a local office within 70 miles of Naperville. Required submissions include an Affidavit of Compliance, IDOT prequalification certificates, and a bid deposit equal to 10 percent of the total bid. Once awarded, the contractor must provide performance and payment bonds equal to the contract price within ten calendar days. The project is subject to the Illinois Prevailing Wage Act, and failure to meet the final completion date will result in liquidated damages of 1,000 dollars per calendar day.
Public Utilities (Water) | DPU-W

POSTED

about 2 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for labor, materials, and services for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves extensive sewer infrastructure improvements, including the open-cut installation of PVC and Ductile Iron Pipe ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional deliverables include the construction of an outfall and a CSO regulator fit out. Project requirements also encompass critical site management and compliance tasks, such as the implementation and maintenance of a Stormwater Pollution Prevention Plan, geotechnical instrumentation and monitoring, and the maintenance of flows and bypass. General base bid items include mobilization, clearing and grubbing of wooded areas, and seeding and fine grading. Notably, the project requires specific railroad insurance.
Cleary Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To complete these objectives, the project requires a full suite of materials, labor, and equipment, including specialized services such as jack and bore, cold planing, SWPPP, AC paving, welding, potholing, and preconstruction video. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with certified DBE, MBE, SBE, WBE, SBRA, and LSAF firms. Interested subcontractors must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for this effort are Destiny Plummer and Nathan Plummer. All work must be performed in strict accordance with the project bid documents and specifications provided by the Inland Empire Utilities Agency.
Norstar Plumbing and Engineering, Inc

POSTED

about 2 hours ago

DEADLINE

in 1 day
View Details

More opportunities from Department Of Homeland Security → Ceu PROVIDENCE(000G1)

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS