Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 16, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Storm Water Pump Station Enhancements (Non-PLA)

Closed
CIP No. 25-11State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for labor, materials, and services for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves extensive sewer infrastructure improvements, including the open-cut installation of PVC and Ductile Iron Pipe ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional deliverables include the construction of an outfall and a CSO regulator fit out. Project requirements also encompass critical site management and compliance tasks, such as the implementation and maintenance of a Stormwater Pollution Prevention Plan, geotechnical instrumentation and monitoring, and the maintenance of flows and bypass. General base bid items include mobilization, clearing and grubbing of wooded areas, and seeding and fine grading. Notably, the project requires specific railroad insurance.
Cleary Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 16 days
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To complete these objectives, the project requires a full suite of materials, labor, and equipment, including specialized services such as jack and bore, cold planing, SWPPP, AC paving, welding, potholing, and preconstruction video. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with certified DBE, MBE, SBE, WBE, SBRA, and LSAF firms. Interested subcontractors must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for this effort are Destiny Plummer and Nathan Plummer. All work must be performed in strict accordance with the project bid documents and specifications provided by the Inland Empire Utilities Agency.
Norstar Plumbing and Engineering, Inc

POSTED

about 3 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The contract involves upgrading the storm water pump station for the City of National City by installing a new SDG&E electrical service, which includes laying a new concrete pad, installing a meter and disconnect switch, and extending the existing pump building feeder to re-establish a 120/240V, three-phase, four-wire power supply. Additionally, the project entails removing and replacing the existing automatic control system for the storm water pump with a new, modern pump control system, ensuring all existing power and control conductors are properly reconnected, and commissioning the new system to ensure proper operation. The contractor is responsible for coordinating with SDG&E, the City, and Caltrans to obtain all necessary permits, including encroachment permits for work within the right-of-way and any emergency permits required for work impacting the adjacent freeway off-ramp. The project is titled "Storm Water Pump Station Enhancements (Non-PLA)" with a solicitation number CIP No. 25-11, posted on September 16, 2025, with a response deadline of October 9, 2025. It is managed by the City of National City in California, with a contract size estimated between $500,000 and $1,500,000. The primary point of contact for the project is Alex Preciado, reachable via email at [email hidden] or by phone at [phone hidden]. The scope emphasizes coordination with multiple agencies to ensure all permits and notifications are properly handled, and the work involves significant electrical and civil modifications to enhance the station’s functionality and compliance.

Documents

12
PDF, High priority: read this first12 pages · guidelines
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this firstcontract-document
High
PDF, High priority: read this firstpost-bid-package
High
PDF, High priority: read this firstsupporting-document
High
PDF, High priority: read this firstsupporting-documents
High
PDF, High priority: read this firstbid-certification
High
PDF, Low priorityclose-out-documents
Low
PDF, Low priorityspecial-notice
Low
PDF, Low prioritycertification
Low
PDF, Low priorityother
Low
PDF, Low priorityspecifications
Low

Read all 12 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
  • Lift Station No. 85 ReplacementOpen now, due in 28 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of National City
Contacts1 person available
OfficeN/A

Full Description

Show more
The general scope of work consists of providing a new SDG&E service to the existing City pump station, including installation of a new concrete pad, meter and disconnect switch; intercepting and extending the pump building feeder; and coordinating with SDG&E to re-establish a new 120/240, 3 phase, 4 wire service. The project also includes removal and replacement of the existing storm water pump automatic control system with a new pump control system, reconnecting all existing power and control conductors, and commissioning the new pump control system. The contractor shall be responsible for coordinating and obtaining a Caltrans encroachment permit for all work within the right-of-way and for providing all necessary notifications and coordination with the City, SDG&E, and Caltrans. The contractor shall be responsible for coordinating directly with the required agencies to obtain all required encroachment permits, including an emergency encroachment permit if applicable, for work impacting the adjacent freeway off-ramp.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS