Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Vermont was posted on August 13, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Stormwater Catch Basin Replacement – Concrete & Paving Restoration

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The City of Winooski is seeking a subcontractor to supply and install a new concrete catch basin structure as part of stormwater infrastructure replacement. The scope of work includes complete removal of the existing catch basin and installation of a new concrete structure meeting all applicable engineering and safety standards. Following installation, the contractor is responsible for restoring all disturbed surfaces, including roadway paving and adjacent concrete or asphalt areas, to their original condition or better, ensuring seamless integration with existing infrastructure and compliance with municipal specifications for durability and surface quality. Work must be completed in accordance with local regulations and municipal standards for stormwater management and public right-of-way restoration. The contract is classified under NAICS code 238110 for heavy and civil engineering construction and is open for bid through the City of Winooski’s official procurement portal, with responses due by August 26, 2025. All work must be performed within the designated project area in Winooski, Vermont, and contractors are expected to coordinate closely with city authorities to minimize disruption to public traffic and utilities. Successful bidders will be required to demonstrate proven experience with similar infrastructure projects and the capacity to complete both structural and surface restoration work to high-quality standards.

General Info

Supply and install new concrete catch basin with full surface restoration in Winooski, Vermont by August 26, 2025.

Documents

This scope was carved out of STR- 26- 02.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

2025 Stormwater Catch Basin BV169 Replacement

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont → City of Winooski
ContactsNo contacts available
OfficeN/A
Organization / AgencyVermont → City of Winooski
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply and installation of new concrete catch basin structure; restoration of asphalt or concrete paving on roadway and adjacent surfaces after work completion.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS