This Government Contract opportunity from Vermont was posted on August 13, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Stormwater Catch Basin Replacement – Concrete & Paving Restoration
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The City of Winooski is seeking a subcontractor to supply and install a new concrete catch basin structure as part of stormwater infrastructure replacement. The scope of work includes complete removal of the existing catch basin and installation of a new concrete structure meeting all applicable engineering and safety standards. Following installation, the contractor is responsible for restoring all disturbed surfaces, including roadway paving and adjacent concrete or asphalt areas, to their original condition or better, ensuring seamless integration with existing infrastructure and compliance with municipal specifications for durability and surface quality. Work must be completed in accordance with local regulations and municipal standards for stormwater management and public right-of-way restoration. The contract is classified under NAICS code 238110 for heavy and civil engineering construction and is open for bid through the City of Winooski’s official procurement portal, with responses due by August 26, 2025. All work must be performed within the designated project area in Winooski, Vermont, and contractors are expected to coordinate closely with city authorities to minimize disruption to public traffic and utilities. Successful bidders will be required to demonstrate proven experience with similar infrastructure projects and the capacity to complete both structural and surface restoration work to high-quality standards.
General Info
Place of Performance
VT, USASet-Aside
Documents
This scope was carved out of STR- 26- 02.
The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.
2025 Stormwater Catch Basin BV169 Replacement
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
