Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Massachusetts was posted on July 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Stormwater Drainage and Conveyance System Work

Closed
State & Local
Submission Closed

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves the installation of stormwater drainage and conveyance infrastructure including catch basins, piping, swales, and related elements designed to direct surface runoff toward an infiltration basin and rain garden. This work is part of a broader effort to manage stormwater runoff sustainably by enhancing natural infiltration and reducing downstream impacts. The project is positioned under NAICS code 238110, indicating it falls under site preparation and civil construction services, and is structured as a subcontract opportunity with a response deadline of August 20, 2026. The work is to be performed at Gliniewicz Way in Abington, Massachusetts, with the employing agency being the Town of Abington under the Massachusetts state jurisdiction. All activities must comply with local stormwater management standards and environmental best practices to ensure effective runoff control and ecological integration of the drainage system.

General Info

Install stormwater drainage infrastructure at Gliniewicz Way, Abington, MA, by August 20, 2026.

Place of Performance

Gliniewicz Way Abington, MA, 02351, USA

Set-Aside

NONE

Documents

This scope was carved out of BD-27-1472-ABGTN-ABGTN-131558.

The full solicitation package (31 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Stormwater BMP

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26_1208 – Lumber Bridge-NCOpen now, due in 6 days
  • ASO-0953-00 Construction of standalone DME at Paulding Northwest Atlanta Airport (PUJ), Dallas, GAOpen now, due in 33 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts → ABGTN - Town of Abington
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of catch basins, piping, swales, and other conveyance elements to direct runoff to the infiltration basin and rain garden.

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS