This Government Contract opportunity from Massachusetts was posted on July 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Stormwater Drainage and Culvert Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is seeking MBE, DBE, and WBE subcontractors and suppliers for a targeted green-street retrofit project in downtown Romney, West Virginia. The project involves the construction of approximately 343.59 linear feet of South Marsham Street between Gravel Lane and US Route 50. The scope of work includes the installation of 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and necessary drainage, underdrain, inlet, pipe, tie-in, and downspout work. Additionally, the project requires limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor, as well as the planting of six native trees and approximately 345 native plants. The goal is to treat approximately 1.7 acres of impervious surface within a 3.3-acre drainage area, concluding with final stabilization, cleanup, and restoration. This solicitation is open to various small business concerns, including veteran-owned, service-disabled veteran-owned, HUBZone, disadvantaged, woman-owned, and minority-owned businesses. To accommodate the project scale, these entities are encouraged to form consortiums if individual bid items are too large for a single firm to handle. Bids must be submitted by September 17, 2026, at 4:00 P.M. Interested parties should contact Jonah Leith or Jennifer Wilson for further details and must provide a response indicating their intent to bid.
Harbel, Inc.

POSTED

about 9 hours ago

DEADLINE

in 4 days
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, is a comprehensive infrastructure initiative issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches in diameter, as well as 54-inch and 145.5-inch diameter tie-ins and associated pipe fittings. Additional construction requirements include the delivery of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, and surface restoration, alongside the excavation of cobbles and large boulders. This solicitation, posted on September 11, 2026, with a response deadline of September 29, 2026, is open to small businesses, including certified service-disabled veteran-owned, minority, and women-owned enterprises. The prime contractor, J.W. Fowler, is actively seeking subcontractor pricing and offering support to M/W/DBE firms regarding bonding, insurance, and equipment procurement to maximize participation.
James W. Fowler Co.

POSTED

about 9 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The contract entails the installation of storm drains, catch basins, and culverts alongside the Park Plaza trail in Boston to effectively manage stormwater runoff. The work falls under NAICS code 237110, indicating it is a civil engineering construction project focused on water and sewer line and related structures. The effort is intended to improve drainage infrastructure in a high-traffic urban area to prevent flooding and erosion along the trail corridor. The solicitation was posted on July 27, 2026, with a response deadline of August 25, 2026, at 7:00 PM. This is classified as a subcontract, meaning the awardee will be working under a prime contractor rather than directly with the Massachusetts highway agency. The place of performance is specifically identified as Park Plaza in Boston, with ZIP code 02116, and the work must be completed in compliance with local and state regulatory standards for stormwater management and infrastructure development.

General Info

Install storm drains, catch basins, and culverts on Park Plaza trail in Boston to manage stormwater runoff.

Agency

Massachusetts → 0H100 - HIGHWAYView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Park Plaza Boston, MA, 02116, USA

Set-Aside

NONE

Documents

This scope was carved out of BD-27-1030-0H100-0H002-131771.

The full solicitation package (49 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

613163 LYNNFIELD FAP No. STP-0034(033)X Rail Trail Construction, from Ford Avenue to the Peabody

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts → 0H100 - HIGHWAY
ContactsNo contacts available
OfficeN/A
Organization / Agency
Massachusetts → 0H100 - HIGHWAY
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of storm drains, catch basins, and culverts to manage runoff along the trail.

More opportunities from Massachusetts → 0H100 - HIGHWAY

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS