Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Stormwater Management & Cistern Installation

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract focuses on the installation of stormwater capture and management systems for mixed-use development projects within the City of Los Angeles. The scope of work involves partnering with prime contractors to install above-ground or underground cisterns, filtration systems, pumps, and piping. Additionally, the contractor is responsible for performing necessary grading for drainage and ensuring all components are properly connected to the site stormwater systems. The primary objective is to deliver a fully functional stormwater capture system that adheres to all local regulations. The project is categorized under NAICS code 238910 and is centered in Los Angeles, California, specifically within the 90028 zip code area.

General Info

Subcontract for installing stormwater capture and management systems for mixed-use projects in Los Angeles.

Agency

California → City of Los Angeles

Place of Performance

Los Angeles, CA, 90028

Set-Aside

NONE

Documents

This scope was carved out of ENV-2021-8030-EIR.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

The Star Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 7 documents on the prime contractFrom The Star Project
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Los Angeles
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → City of Los Angeles
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs installation of stormwater capture and management systems for prime contractors on City of Los Angeles mixed-use development projects. Installs cisterns for stormwater capture, performs grading for drainage, and connects to site stormwater systems. Utilizes underground or above-ground cisterns, filtration systems, pumps, and piping. Delivers a functional stormwater capture system compliant with local regulations.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
Federal
Forest Wide Decommissioning Project
Solicitation # 127EAX27Q0013
The Forest Wide Decommissioning Project, solicitation number 127EAX27Q0013, is a firm fixed price contract issued by the USDA Forest Service CSA Southwest to establish a more sustainable recreation program within the Tonto National Forest. The project requires the removal and safe disposal of recreational accommodations outside of National Forest boundaries, including entry station buildings, toilet buildings, sidewalks, asphalt pavement, fish cleaning stations, septic systems, and parking lots. The scope is divided into a base bid for the Tonto Basin Ranger District and an option bid for the Globe Ranger District. The contractor must commence work within 10 calendar days of the notice to proceed and complete all work, including final site cleanup, within a 150-day period of performance. This opportunity is a total small business set-aside under NAICS code 238910. Award will be granted to the highest technically rated offeror, provided the price is fair and reasonable and past performance is acceptable or neutral. Technical evaluations will focus on the work plan, key personnel, and the performance schedule. The contract is subject to the Davis-Bacon Act, requiring compliance with specific construction wage rates and paid sick leave mandates. Offerors must submit their proposals in three separate PDF documents, including a signed SF1442, a price proposal using the provided schedule of items, and a technical proposal adhering to specific page limits for each evaluation factor.
Csa Southwest 7 Usda-Fs

POSTED

about 12 hours ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS