Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Stormwater Pipe Replacement

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Shoreline in Washington is seeking a subcontractor for a stormwater pipe replacement project located along 10th and 8th Ave NE. The scope of work involves the removal and replacement of existing stormwater piping, which includes trenching, pipe installation, backfilling, and compaction under NAICS code 237110. This opportunity was posted on August 17, 2026, and requires a response by September 2, 2026. Interested parties can find further details and submission guidelines through the provided public purchase link.

General Info

Shoreline, WA seeks subcontractors for stormwater pipe replacement by September 2, 2026.

Agency

Washington → City of ShorelineView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

WA, USA

Set-Aside

NONE

Documents

This scope was carved out of 1382070.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

10th Ave NE Stormwater Improvements

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyWashington → City of Shoreline
ContactsNo contacts available
OfficeN/A
Organization / Agency
Washington → City of Shoreline
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Removal and replacement of existing stormwater piping including trenching, pipe installation, backfilling, and compaction along 10th and 8th Ave NE.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Cypress Lake WTP, Wellfield, & Raw Water Main in Osceola County, FL
Solicitation # cypress-lake-wtp-wellfield-raw-water-main-osceola-county-fl
Wharton-Smith, Inc. is soliciting proposals from State of Florida Certified Disadvantaged Business Enterprise (DBE) subcontractors and suppliers for the Cypress Lake WTP, Wellfield, and Raw Water Main project in Florida. This project, owned by the Central Florida Water Cooperative, has an estimated value of 270 million dollars. The scope of work is extensive, involving the construction of raw water production wells, well heads, well pumps, discharge piping, and a surge bladder tank. It also includes site civil work, a wellhead cage, an electrical building, a standby generator, and the construction of several specialized facilities, including Operations and Reverse Osmosis buildings, pretreatment and post-treatment chemical buildings, a post-treatment degasification system, and an odor control air exhaust dispersion stack system. Additionally, the contractor must provide production well disinfection and primary and secondary water quality analytical laboratory testing to achieve regulatory certification. The solicitation is categorized under NAICS code 237110. Interested parties must submit their proposed scope of work at least 24 hours before the bid date, with firm pricing due by 10:00 AM on the day of the bid. The final deadline for submissions is August 19, 2026, at 2:00 PM EST. Proposals should be emailed to Nichole Voitel at watergmpbids@whartonsmith.com. Bidding documents, including plans, specifications, and addenda, are available for free download via ConstructConnect. Wharton-Smith, Inc. has indicated a willingness to review responsible quotes and negotiate terms where appropriate.
Wharton-Smith, Inc.

POSTED

about 5 hours ago

DEADLINE

in 2 days
View Details
NAICS: 237110
New
SEWER CONSTRUCTION
Solicitation # Sanitary Contract No. 866
Sanitary Contract No. 866, titled Replacement of the Southwest Diversion Pressure Sewer - Phase I Frankfurt Avenue, is a construction project managed by the City of Baltimore Department of Public Works Office of Engineering and Construction. The primary scope of work involves the installation of approximately 4,450 linear feet of 102-inch sewer pipe using open-cut construction, including all associated appurtenances and surface repairs. The project is funded through the U.S. EPA Water Infrastructure Finance and Innovation Act (WIFIA) and the Maryland Water Quality and Drinking Water Revolving Loan Fund, with established minority and women-owned business goals of 22 percent for MBE and 16 percent for WBE. To be eligible for award, bidders must be prequalified by the City of Baltimore Department of Public Works Office of Boards and Commissions under category B02552 for Sewer Construction, with a required cost qualification range between 60,000,000.01 and 70,000,000.00 dollars. Sealed bids must be submitted in duplicate to the Office of the Comptroller in Baltimore, Maryland, by 11:00 A.M. on August 5, 2026. All bid inquiries must be directed to Lotania Walston and Darryn Mobley by the July 8, 2026, deadline. Joint venture submissions require the inclusion of the legal document establishing the venture for verification purposes.
Monumental Paving & Excavating, Inc.

POSTED

about 5 hours ago

DEADLINE

in about 3 hours
View Details

More opportunities from Washington → City of Shoreline

Same awarding agency

NAICS: 541620
New
SLED
Echo Lake In-Lake Phosphorus Treatment and Water Quality Monitoring Services
Solicitation # 1398042
The City of Shoreline, Washington, is soliciting proposals under solicitation number 1398042 for in-lake phosphorus inactivation treatment and water quality monitoring services at Echo Lake. The project aims to implement recommendations from the Echo Lake Cyanobacteria Management Plan and is funded through the City of Shoreline Surface Water Utility and Washington State Department of Ecology grants. The selected consultant will develop a dosing plan using alum or lanthanum-based products, manage NPDES permit compliance, conduct baseline monitoring, and provide technical assistance for regulatory reporting. The anticipated maximum compensation for the agreement is 145,000 dollars. Proposals are due by 2:00 p.m. Pacific Time on August 28, 2026, and must be submitted exclusively via publicpurchase.com in PDF format. The evaluation is based on a 100-point scale, prioritizing the cost proposal (30 points), approach (25 points), project team expertise (20 points), and project experience (20 points), with the executive summary accounting for the remaining 5 points. The anticipated contract award date is September 4, 2026. Selected consultants must provide a business license, a W-9 form, and maintain specific insurance coverages, including 2,000,000 dollars each for professional liability and commercial general liability, and 1,000,000 dollars for auto liability. All digital deliverables must adhere to Section 508 and WCAG 2.1 Level AA accessibility standards.
Environmental Consulting Services

POSTED

5 days ago

DEADLINE

in 11 days
View Details
NAICS: 541618
SLED
Consulting Services for Selection of Pool Facility Construction Contracting Method and Potential Additional Owner Support Services
Solicitation # 1395864
The City of Shoreline, Washington is seeking qualified consultants to provide expert services in selecting the most appropriate public works contracting method for the construction of a new pool facility, in alignment with RCW Chapter 39.10. The consultant will be responsible for evaluating available contracting options, advising on the preferred method, and, if needed, preparing and submitting an application to the State of Washington Project Review Committee for approval. The scope may also include additional owner support services as determined during the engagement. Proposals must be submitted by 2:00 p.m. Pacific Local Time on Thursday, August 20, 2026, with questions due by August 3 and responses posted by August 5. The selection process includes a review period from August 20 to 24, followed by interviews on August 27 and 28, with contract award anticipated between August 31 and September 18. The initial agreement will run for eight months with a maximum total compensation of $80,000 covering both Phase 1 and potential Phase 2 services, subject to amendment. All documents are posted on publicpurchase.com, and respondents are solely responsible for monitoring updates and addenda. Only registered users on the site will receive notifications, though access to the full request and submission requirements is available through the City’s official website. Points of contact and further details are listed via the City’s procurement portal.
Other Management Consulting Services

POSTED

21 days ago

DEADLINE

in 3 days
View Details