Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Streambed Stabilization & Erosion Control

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves performing streambed stabilization and erosion control for prime contractors on City of San Diego stormwater and planning projects. The scope of work focuses on a one-mile reach of Manzanita Creek, where the contractor will implement bio-engineered fascines and various stabilization techniques to secure the streambed and install necessary erosion control systems. All activities must be executed in strict compliance with the Multiple Species Conservation Program and California Public Resources Code Section 21080.56. The project is categorized under NAICS code 238910 and is located within San Diego, California.

General Info

Streambed stabilization and erosion control for Manzanita Creek projects in San Diego, California.

Agency

California → City of San Diego

Place of Performance

San Diego, CA

Set-Aside

NONE

Documents

This scope was carved out of 2025-001076.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Manzanita Greening & Canyon Health Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom Manzanita Greening & Canyon Health Project
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Diego
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → City of San Diego
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs streambed stabilization and erosion control for prime contractors on City of San Diego stormwater and planning projects. Implements bio-engineered fascines and stabilization techniques to secure the streambed along a one-mile reach of Manzanita Creek. Work must comply with California Public Resources Code Section 21080.56 and the Multiple Species Conservation Program (MSCP). Delivers a stabilized streambed and installed erosion control systems.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
Demolition of Substandard Structures
Solicitation # 271010
The City of Dothan, Alabama, is soliciting bids for the demolition of seven substandard structures located at 303 N Edgewood Dr, 415 N Alice St, 604 Torino Dr (shed), 706 W Adams St, 1104 Sonata St, 1211 Greenwood Dr, and 3439 Denton Rd (shed). The contractor is responsible for complete demolition, removal of all debris, and grading the sites to be clean, level, and free of obstructions. Specific asbestos surveys have been conducted for several properties; those at 303 N Edgewood Dr, 1211 Greenwood Dr, and 706 W Adams St contain non-friable asbestos-containing materials, requiring abatement by a certified Alabama contractor and notification to the Alabama Department of Environmental Management (ADEM) prior to demolition. The contract is a lump sum agreement with a performance period of 60 consecutive calendar days following the Notice to Proceed. Liquidated damages of $50.00 per day will be assessed for delays beyond this period. Bidders must provide a performance bond in the amount of the bid and maintain insurance including $1,000,000 general liability and $1,000,000 automobile liability. Award will be made on a group basis based on total price, qualification, and past performance. Required submission documents include a signed bid form, signed City Terms and Conditions, a No Boycott Agreement, and an Alabama Immigration Compliance Form. There is no set-aside status for this solicitation.
City of Dothan

POSTED

about 15 hours ago

DEADLINE

in 18 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS