Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Arizona was posted on January 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

STREET TRANSPORTATION DEPARTMENT PROJECT MANAGEMENT ASSISTANCE ON-CALL SERVICES

Closed
PMGTOC2629State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
2026 CPRG NCD SOQ
Solicitation # 2026-SOQ-004
The City of Rogers is soliciting Statements of Qualifications (SOQ) under solicitation number 2026-SOQ-004 for Natural Channel Design services to restore approximately 4,200 linear feet of stream in an urban setting. The scope of work includes engineering, plan design, hydrologic and hydraulic modeling, and the procurement of all necessary local, state, and federal regulatory permits, including potential Letter of Map Revision submissions to FEMA. This project is funded by the Climate Pollution Reduction Grant (CPRG) subaward CPRG-NWA-001 and EPA award 02F75801, requiring compliance with EPA nondiscrimination regulations, Title VI of the Civil Rights Act of 1964, and 40 CFR Parts 5 and 7. Key milestones include the completion and approval of construction plans and permit applications by May 1, 2027, with final construction completion targeted for December 31, 2027. Selection is based on a ranking of qualifications rather than price, with the highest-ranked firm invited to negotiate a contract. Evaluation criteria focus on professional staff expertise, past performance, understanding of the scope, and the quality of the work plan. Interested firms must submit a PDF via OpenGov or hard copy to Colt Craig by November 10, 2026. Submissions are limited to 25 pages and must include Standard Form 330 Part II, an Equal Employment Opportunity policy, the Arkansas DFA Illegal Immigrant Contractor Disclosure Form, and EPA certifications regarding debarment and lobbying for contracts exceeding 100,000 dollars. Additionally, firms must maintain active registration in SAM.gov and demonstrate a commitment to DBE goals through six good faith efforts in subcontracting per 40 CFR 33.301.
Community Development

POSTED

about 4 hours ago

DEADLINE

in 12 days
NAICS: 541330
New
International
Pump Optimisation and Aeration Efficiency Analysis
Solicitation # FA2253
Thames Water Utilities Limited is establishing a single-lot, sole-supplier framework agreement under solicitation FA2253 for pump optimisation and aeration efficiency services. The contract focuses on the monitoring, testing, and analysis of pumping and aeration systems across approximately 60 operational sites, encompassing roughly 200 tests during the AMP period. The primary objective is to reduce whole-life costs and improve operational performance through a structured delivery model that includes site identification, efficiency studies, and performance monitoring. The agreement will feature fixed pricing structures based on an agreed rate card and will be managed through key performance indicators to ensure strategic partnership and continuous improvement. The contract is scheduled for an initial three-year term starting May 10, 2027, with potential extensions up to a maximum of eight years, ending May 9, 2035. Eligible suppliers must demonstrate a proven track record of delivering measurable savings and innovation and must have the capacity to operate within London, the Thames Valley, and the Home Counties. Award selection is based on a 50% technical and 50% commercial weighting. The procurement process is a multi-stage procedure requiring a Pre-Selection Questionnaire via SAP Ariba by October 19, 2026, followed by an Invitation to Negotiate stage. Successful providers must also meet stringent insurance requirements, including 15 million pounds for public and products liability and 10 million pounds for professional indemnity.
Thames Water Utilities Limited

POSTED

about 4 hours ago

DEADLINE

N/A

AI Contract Overview

Show more

The City of Phoenix is seeking up to two qualified engineering consultants to provide on-call project management, construction administration, and inspection services for the Street Transportation Department’s Design and Construction Management Division, specifically supporting the Horizontal Project Management Team. The services will involve full-time project management duties for a range of horizontal transportation infrastructure projects, with work conducted on-site at City facilities. This contract opportunity aims to ensure efficient oversight and administration of transportation construction projects. The solicitation, identified as PMGTOC2629, was posted on January 8, 2026, with a response deadline of January 30, 2026. The procurement is managed by the Design and Construction Procurement office located in Phoenix, Arizona. Interested parties can contact Christopher Balderrama, Contracts Specialist II, for further information. The contract is designated for the State, Local, and Education (SLED) organization type but does not specify any set-aside status or NAICS code. The primary focus of this contract is to support the City’s infrastructure needs through specialized engineering consulting services.

General Info

City of Phoenix seeks two engineering consultants for on-call project management and inspection services.

Place of Performance

AZ, USA

Set-Aside

NONE

Documents

6

City of Phoenix Project Addendum No. 1

DOC, High priority: read this first2 pages · amendment
High

City of Phoenix Subcontractor Selection Plan Excerpt

PDF, High priority: read this first3 pages · contract-document
High

Consultant Reference Check Instructions and Evaluation Form for PMGTOC2629

DOCX, High priority: read this first5 pages · consultant-reference-check
High

Design-Build Team Reference Check Instructions and Evaluation Form

PDF, High priority: read this first5 pages · reference-check-instructions
High

RFQ PM Assistance On-Call Services Phoenix Street Transportation

PDF, High priority: read this first13 pages · rfq
High

Consultant and Contractor Reference Check Instructions and Evaluation Form

DOCX, Low priority5 pages · other
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyArizona → Design and Construction Procurement
Contacts1 person available
OfficePHOENIX, AZ, 85003, USA
Office AddressPHOENIX, AZ, 85003, USA
Contacts
Christopher BalderramaContracts Specialist II

Full Description

Show more
The City of Phoenix is seeking up to two qualified engineering consultants to provide project management and construction administration and inspection services on an as-needed basis in support of the Street Transportation Department's, Design and Construction Management Division, Horizontal Project Management Team. Services will include full-time project management for a variety of horizontal transportation infrastructure projects and will be performed on-site at City facilities.

More opportunities from Arizona → Design and Construction Procurement

Same awarding agency

New
SLED
SANITARY SEWER REHABILITATION PROGRAM JOB ORDER CONTRACT
Solicitation # JOC261
The City of Phoenix, through the Office of the City Engineer's Design and Construction Procurement section, is soliciting qualifications for the Sanitary Sewer Rehabilitation Program Job Order Contract (JOC261). The primary objective of this on-call service is to maintain the wastewater collection system by rehabilitating existing infrastructure, specifically targeting 8-inch to 15-inch diameter clay pipes. The primary method of rehabilitation is cured-in-place pipe (CIPP) using felt and resin lining, though some projects may require dig and replace operations. All work will be performed within the state of Arizona. Selection is based on a qualifications-based process using Statements of Qualifications (SOQs), with a heavy emphasis on project management and subcontracting, which accounts for 34.3% of the evaluation weight. Interested firms must be registered in the City's Vendor Management System and hold the appropriate Arizona Registrar of Contractors license. Submissions must be made electronically via the City's Procurement Portal by 12:00 pm Phoenix time on November 30, 2026. Required documentation includes a 10-page maximum SOQ in PDF format, a separate bonding capacity statement from a surety company, an Experience Modification Rate (EMR) rating, and at least three references. The contract includes specific requirements for Small Business Enterprise (SBE) participation, requiring contractors to meet established annual goals and adhere to strict reporting and compliance reviews. While the current SBE required goal is listed as 0.00%, contractors must still provide a Statement of Proposed SBE Utilization and a Letter of Intent for any proposed SBE subcontractors. Additionally, the contractor must provide performance and payment bonds for each individual Job Order proposal prior to execution. All inquiries must be directed solely to the designated Contract Specialist, Alissa Bahr.

POSTED

about 6 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541330
New
SLED
LIFT STATION 47 REDUNDANT FORCE MAIN CONSTRUCTION ADMINISTRATION & INSPECTION SERVICES
Solicitation # WS90501000
The City of Phoenix is seeking a qualified consultant team to provide construction administration and inspection services for the Lift Station 47 Redundant Force Main project. This project involves the installation of a new 12-inch HDPE redundant force main and the reconfiguration of the discharge header, with an estimated construction cost of 7.9 million dollars. The scope of work includes day-to-day construction oversight to prevent defects, maintaining pipe fusion records, evaluating CCTV or digital rehabilitation documentation, and assisting the City in obtaining necessary permits and approvals. Technical requirements include adherence to ASCE 7-22 for seismic design, ACI requirements for concrete in sulfate-containing soil, and OSHA regulations for excavation and shoring. Selection will be conducted through a qualifications-based process, with a total of 1,000 points available for the Statement of Qualifications (SOQ) and an additional 21 points available through reference checks. Evaluation criteria focus on the prime firm's experience, project understanding and approach, the qualifications of key personnel and subconsultants, and staffing information. Interested firms must submit a single PDF SOQ not exceeding 10 pages via the City's OpenGov procurement portal by 12:00 pm Phoenix time on October 30, 2026. The City will negotiate fees and contract terms with the selected team following the evaluation process.
Engineering Services

POSTED

3 days ago

DEADLINE

in about 23 hours
View Details
NAICS: 237110
New
SLED
LARGE DIAMETER SANITARY SEWER REHABILITATION - GRADE 5 & 4 MANHOLES - NORTH - ZONES 5 & 6 - DESIGN-BID-BUILD
Solicitation # WS90500273
The City of Phoenix, Office of the City Engineer, is soliciting bids for the Large Diameter Sanitary Sewer Rehabilitation project (WS90500273) focusing on Grade 4 and 5 manholes in North Zones 5 and 6. The scope of work involves the rehabilitation of 100 active sanitary sewer manholes or structures, which may include the installation of corrosion-coating systems, structural inserts, and liner repairs. To facilitate these repairs, the contractor may be required to utilize bypass pumping and small-diameter flow-through plugs. The project must be completed within 300 calendar days from the Notice to Proceed, and the contractor is required to submit a detailed Critical Path Model chart within one week of the pre-construction meeting. Contract award will be granted to a responsive and responsible bidder based on the low total base bid or the low combination of the base bid and selected alternates. Key requirements include a 2.5% Small Business Enterprise (SBE) participation goal and the provision of performance and labor and material bonds executed by a surety company authorized in Arizona. Bidders must submit sealed proposals including bid forms, a bid bond or cashier's check, and SBE utilization documentation. Following Addendum 2, the bid due date was extended to November 3, 2026, and the Triplex Liner System was approved as a substitution. Final acceptance of the work is contingent upon video scanning, adherence to MAG and City standards, and a collective inspection by the City, Engineer, and Contractor.
Water and Sewer Line and Related Structures Construction

POSTED

6 days ago

DEADLINE

in 5 days
View Details
NAICS: 541330
SLED
GRAND CANAL PHASE IV - 47TH AVENUE TO 23RD AVENUE PLANNING STUDY
Solicitation # ST87600149
The City of Phoenix is soliciting Statements of Qualifications for the Grand Canal Phase IV Planning Study, a project funded by the USDOT Reconnecting Communities Pilot Program. The objective is to conduct a pre-design planning study and preliminary engineering for a 3.5-mile continuous active transportation route featuring a multi-use path at least 12 feet wide. The study area extends from 47th Avenue to 23rd Avenue and specifically addresses critical barrier locations at Interstate 17 and the US-60/BNSF Railways. Key deliverables include 15 percent design plans for the preferred concept and a comprehensive Project Assessment Report, incorporating NEPA environmental documentation, public involvement, and stakeholder coordination. This procurement follows a qualifications-based selection process with a strict submission deadline of October 30, 2026. Applicants must submit a single PDF Statement of Qualifications not exceeding 14 pages, excluding covers, the information sheet, and the table of contents. Evaluation is based on a 1,000-point scale considering firm experience, key personnel, and project approach, with an additional 21 points available through three consultant reference checks. All participating firms must be registered in the City Vendor Management System and certify compliance with federal Affirmative Action requirements and restrictions on foreign country products. A final contract will be executed following the selection of a firm and the successful negotiation of fees and terms.
Engineering Services

POSTED

9 days ago

DEADLINE

in about 23 hours
View Details
NAICS: 237110
SLED
LIFT STATION 47 - REDUNDANT FORCE MAIN DESIGN-BID-BUILD
Solicitation # WS90501000
The City of Phoenix, through the Office of the City Engineer, is soliciting bids for the Lift Station 47 Redundant Force Main project under a design-bid-build contract. The primary objective is to enhance operational flexibility and redundancy by installing approximately 9,500 linear feet of 12-inch high-density polyethylene HDPE force main. This new main will follow the alignment of the existing 12-inch ductile iron force main, extending south along 113th Drive from the lift station to Indian School Road, and then east to 99th Avenue for discharge into the gravity sewer. The scope also includes minor reconfiguration of the lift station discharge piping and the demolition and salvage of existing components, such as an 8-inch flow meter. The project must be completed within 365 calendar days from the Notice to Proceed. All work must adhere to the Maricopa Association of Governments MAG Uniform Standard Specifications, the MCDOT Supplement, and Maricopa County Ordinance P-36. Bidders are required to provide a 10 percent bid guarantee and, upon award, must furnish performance and labor/material bonds for the full contract amount. A Small Business Enterprise SBE goal of 5 percent has been established. Bids must be submitted in sealed envelopes to the bid box at Phoenix City Hall by the specified deadline. The contractor is responsible for maintaining SWPPP inspection documentation for three years post-completion and must ensure all project plans are marked for official use only per City Code.
Water and Sewer Line and Related Structures Construction

POSTED

14 days ago

DEADLINE

in 12 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS