Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on September 22, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Structural and Miscellaneous Steel Fabrication & Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238120
New
SLED
Corpyard Phase II - Connex Structural Anchoring & Welding: (REBID)
Solicitation # 26-091-ITB
The City of West Sacramento is soliciting bids for the Corpyard Phase II project to provide all labor, materials, equipment, and specialized tooling required to anchor 14 existing shipping containers to a cement-treated asphalt surface at 4300 West Capitol Avenue. The scope of work includes container pre-checks, drilling and cleaning holes, installing Bolthold asphalt anchors, bolting down plates, performing AWS welding for angle connections, and applying zinc-rich cold galvanizing spray for rust protection. All work must be performed according to PSE stamped drawings and structural calculations, with a total project duration of 90 working days from the Notice to Proceed. The estimated project value is 35,000 dollars. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must provide a bid security of at least 10 percent of the total bid price, and the successful contractor must furnish performance and payment bonds for 100 percent of the contract price. Compliance with California prevailing wage requirements and registration with the California State Department of Industrial Relations is mandatory. Proposals must be submitted electronically via the OpenGov portal by November 17, 2026, at 1:00 PM. Payment terms include 95 percent payment of progress estimates within 30 days, with a 5 percent retention held until final acceptance by the Engineer.
Capital Projects - Construction

POSTED

1 day ago

DEADLINE

in 3 days
NAICS: 238120
New
SLED
Midlothian Mines Headstock Replacement
Solicitation # IFB27000129
Chesterfield County is soliciting bids for the Midlothian Mines Headstock Replacement, a project to construct a headstock replica at Midlothian Mines Park. The scope of work includes field verification of existing foundations, removing and welding new steel knife plates, fabricating and erecting a new heavy timber headstock with custom steel connection plates, and installing copper flashing. Additionally, the contractor must refurbish and reinstall existing winder wheels and apply specific wood-preservative treatments. All steel components must be hot-dipped galvanized according to ASTM standards, and timber must be kiln-dried Southern Pine with UC5C pressure preservative treatment. The contract will be awarded to the lowest responsive and responsible bidder based on a lump sum bid. Bids are due by December 17, 2026, and must be submitted via hard copy or the County's eProcurement system. A non-mandatory pre-bid conference is scheduled for November 19, 2026. Bidders must provide a bid bond equal to 5% of the total bid price, and if the bid exceeds $500,000, both performance and payment bonds of 100% of the contract price are required. Payment is typically made within 30 days of receiving an accurate invoice, with a 5% retainage applied to monthly estimates. The project is subject to various regulatory compliances, including federal, state, and local environmental and safety regulations, as well as Equal Employment Opportunity requirements.
Chesterfield County

POSTED

1 day ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

This subcontract agreement with the City of Alhambra in California involves the fabrication and installation of structural steel framing, supports, and miscellaneous metal components for a community center project. The work falls under NAICS code 238120, focusing on the essential metal structural elements required for the facility's construction. The solicitation was posted on September 22, 2025, and requires all responses to be submitted by the deadline of October 28, 2025. Interested parties can find further details and bidding information through the City of Alhambra's official procurement portal.

General Info

Documents

This scope was carved out of N2M25-132.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

N2M25-132 Alhambra Community Center Project - BC09 Aluminum and Glazing

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Alhambra
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → City of Alhambra
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply and install structural steel framing, supports, and miscellaneous metal components for the community center.

More opportunities from California → City of Alhambra

Same awarding agency

NAICS: 238310
SLED
Ceiling Removal And T-Bar Replacement At Fire Station 71 Headquarters
Solicitation # N2M25-155
Solicitation N2M25-155 is a project issued by the City of Alhambra, California, for the removal of existing ceilings and the installation of new T-bar ceilings at the Fire Station 71 Headquarters. The contract is awarded to the lowest responsible bidder based on the prices provided in the bid schedule. To be eligible, contractors must be registered with the Department of Industrial Relations and must perform at least 51 percent of the contract work using their own organization. The scope of work is a lump sum item that requires adherence to the current edition of the Green Book Standard Specifications for Public Works, as well as compliance with OSHA and NFPA requirements. Bids must be submitted in sealed envelopes to the City Clerk's office by December 3, 2026, at 10:30 a.m. Each proposal must include a bid bond of at least 10 percent of the total bid amount. The successful awardee is required to provide performance and payment bonds totaling 100 percent of the contract value, including any subsequent change orders. Additionally, the contractor must comply with California prevailing wage laws and EEO certifications. Final acceptance of the work is subject to inspection and approval by the City Designated Engineer, and the contractor is responsible for removing all construction graffiti prior to the completion of the project.
Drywall and Insulation Contractors

POSTED

13 days ago

DEADLINE

in 19 days
View Details
NAICS: 238160
SLED
Roof Replacement Alhambra Fire Station 73
Solicitation # N2M25-15
The City of Alhambra is soliciting bids for the roof replacement of Fire Station 73, located at 2200 W. Main Street, Alhambra, California. The project requires a contractor holding a C-39 Roofing Contractor license to provide all labor, materials, and equipment necessary for the installation. The estimated project budget is approximately 102,000 dollars, based on a rate of 17 dollars per square foot. The contract will be awarded to the lowest responsible bidder who can demonstrate the ability to self-perform at least 51 percent of the contract work. Bids must be submitted to the City Clerk's office by December 3, 2026, at 10:30 a.m. The project must be completed within 90 calendar days from the Notice to Proceed, with standard working hours from 7:00 AM to 4:00 PM, Monday through Friday. Requirements include a bid bond of 10 percent of the total bid, as well as performance and payment bonds totaling 100 percent of the contract amount. Contractors must be registered with the Department of Industrial Relations per Labor Code section 1725.5 and obtain a City Business License and Construction Permit before starting. Strict material storage and quality control standards are mandated, including specific temperature controls for liquid materials and adherence to the Standard Specifications For Public Works (Green Book). Payment will be issued within 30 days of receiving a proper invoice.
Roofing Contractors

POSTED

23 days ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS