Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Utah was posted on May 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Structural Metal Fabrication and Installation for Security Screen Walls

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves the fabrication and installation of engineered metal screen walls for a parking garage, requiring full compliance with AISC 303, AISC 360, and AWS D1.1 standards. All work must include creation of detailed shop drawings, precision CNC cutting, welding, and secure anchoring to existing structural elements. The scope demands technical accuracy in fabrication, adherence to industry-certified welding practices, and robust integration with the building’s infrastructure to ensure safety and durability. Execution must align strictly with the specified standards governing structural steel and welding procedures. This is a subcontract opportunity posted by the state of Utah on May 13, 2026, with proposals due by June 4, 2026. The NAICS code 332312 identifies the work within metal fabrication services. The place of performance and exact agency office details are not specified, but the opportunity is accessible through Utah’s BonfireHub portal. All bidders must be prepared to meet the engineering and installation requirements without deviation from the prescribed codes, and the project expects complete accountability for quality control throughout manufacturing and field installation phases.

General Info

Fabricate and install metal screen walls per AISC 303, AISC 360, AWS D1.1 for Utah parking garage by June 4, 2026.

Agency

Place of Performance

UT, USA

Set-Aside

NONE

Documents

This scope was carved out of MP26044.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

DFCM Construction - Prequalified General Stage II - Courts - Provo Security Upgrades - Project #26358150

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUtah
ContactsNo contacts available
OfficeN/A
Organization / AgencyUtah
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Fabrication and installation of engineered metal screen walls for the parking garage, including shop drawing creation, CNC cutting, welding, and anchoring to existing structures in compliance with AISC 303, AISC 360, and AWS D1.1 standards.

More opportunities from Utah

Same awarding agency

NAICS: 541310
New
SLED
Sandy City - Architectural Design for City Hall Stairs, Ramp, and Landscape
Solicitation # GJ27-124
Sandy City is soliciting proposals for professional architectural design services under solicitation GJ27-124 to improve Sandy City Hall, located at 10000 South Centennial Parkway, Utah. The scope of work involves the replacement of the west stairs, the construction of an ADA-compliant pedestrian ramp, and a comprehensive landscape redesign of the north hillside and southwest corner. Key technical requirements include the design of a complete hydronic snowmelt system with a new boiler integrated into the City's Alerton building automation system, as well as landscaping that adheres to Waterwise design principles and Sandy City's Division 7 Landscaping and Irrigation standards. The selected architect will be responsible for providing preliminary concepts, 60% and 90% design submissions, and final bid-ready construction documents, along with cost estimates at each milestone. The project operates on a strict timeline, with 100% complete construction documents due by February 1, 2027, and a final project completion goal of June 30, 2027. The architect is also required to participate in a warranty walk approximately 10 months after substantial completion. Proposals must be submitted as a fixed, lump-sum fee via the sandycity.ionwave.net portal. The deadline for submitting written questions is November 4, 2026, at 11:30 AM MT, and the final closing date for bid submissions is November 6, 2026, at 11:30 AM MT. Evaluation will be based on a 100-point criteria system, and the design must ensure continued safe public access and building egress as City Hall will remain operational throughout the construction process.
Architectural Services

POSTED

1 day ago

DEADLINE

in 9 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS