Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Structural Steel Repair & Painting

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for structural steel repair and painting involves performing rehabilitation work on City bridges in Illinois. The scope of work includes cleaning and painting steel bridge surfaces specifically at Pier 4 and Pier 7, as well as painting bearing surfaces within 10 feet of deck joints. The contractor is responsible for delivering repaired and painted structural steel components, applying a final finish coat in Reddish Brown, Munsell No. 2.SYR 3/4, utilizing industrial painting and abrasive blasting equipment in accordance with Section 506. The project falls under NAICS code 238320 and is managed by the Engineering agency of Illinois. The solicitation was posted on September 2, 2026, with a response deadline of September 16, 2026.

General Info

Illinois structural steel repair and painting for City bridges at Pier 4 and 7.

Agency

Illinois → EngineeringView Agency

NAICS

238320 - Painting and Wall Covering ContractorsView NAICS

Place of Performance

IL, USA

Set-Aside

NONE

Documents

This scope was carved out of 26-094.

The full solicitation package (8 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

2026 Bridge Rehabilitation Program

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIllinois → Engineering
ContactsNo contacts available
OfficeN/A
Organization / Agency
Illinois → Engineering
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs structural steel repairs and protective coating application for prime contractors on City bridge rehabilitation projects in Illinois. Cleans and paints steel bridge surfaces at Pier 4 and Pier 7 and paints bearing surfaces within 10 ft of deck joints. Applies final finish coat in Reddish Brown, Munsell No. 2.SYR 3/4 using industrial painting and abrasive blasting equipment per Section 506. Delivers repaired and painted structural steel components.

Similar Contracts

Same NAICS industry code

NAICS: 238320
New
SLED
Paint All Exterior and Common Area Doors, Buildings 4166, 4167, 4168 & 3673
Solicitation # N400857606105
Solicitation N400857606105 is for a project at MCAS Cherry Point, North Carolina, involving the cleaning, preparation, priming, and painting of approximately 800 exterior and common area doors, frames, vents, and louvers across Buildings 4166, 4167, 4168, 4169, and 3673. Additionally, the scope includes refinishing approximately 2,350 linear feet of handrails at Building 3673. The contractor must ensure a uniform, durable finish, with common area and storage doors painted on both sides and residential doors painted on the corridor-facing side only. All work must be completed within 180 calendar days after the award. The contract will be awarded based on the lowest price and is subject to the Davis-Bacon Act, with a minimum wage requirement of 13.65 per hour for covered workers through December 31, 2026. Bonding requirements vary by proposal value: no bonds for amounts 35,000 and less, a payment bond for amounts between 35,000 and 150,000, and a bid, payment, and performance bond for amounts exceeding 150,000. Proposals are due by September 18, 2026, at 1200 local time. The project requires a Quality Control Manager to oversee the work and ensure compliance with government standards, as any inadequate surface preparation or coating defects will be recoated at the contractor's expense.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 6 days
View Details

More opportunities from Illinois → Engineering

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS