Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Florida was posted on July 15, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Structural Thermoplastic or Aluminum Handrail Supply and Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This subcontract opportunity with the Northwest Florida Water Management District involves the supply and installation of Avcon structural thermoplastic or aluminum tubing handrails. All work must be performed in strict accordance with specifications H.S.17 and H.S.38, and the contract explicitly prohibits the use of any substitutions. The solicitation was posted on July 15, 2024, with a response deadline of August 5, 2024. Classified under NAICS code 326199, this project requires a contractor capable of meeting the specific material and installation standards set forth by the agency.

Documents

This scope was carved out of ITB 24B-005.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

ITB 24B-005 Addendum 1 - Pitt and Williford Springs Boardwalk Replacement

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Northwest Fla Water Management Dist
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply and installation of Avcon structural thermoplastic or aluminum tubing handrails per H.S.17 and H.S.38; no substitutions allowed.

More opportunities from Florida → Northwest Fla Water Management Dist

Same awarding agency

NAICS: 115310
New
SLED
ITB 27B-003 Econfina Creek Site Prep for Reforestation and Habitat Restoration
Solicitation # ITB 27B-003
The Northwest Florida Water Management District is soliciting bids for the 2027 Econfina Creek Site Prep for Reforestation and Habitat Restoration project. The scope of work involves heavy mechanical site preparation and chemical treatment of approximately 1,012 acres of commercially planted sand pine stands within the Econfina Creek Water Management Area across Bay and Washington counties. The contractor must remove all live and dead sand pine and designated hardwoods, ensuring stumps are cut no higher than six inches above the ground, and manage vegetative debris through removal or pile burning. Chemical treatment, utilizing specific concentrations of Imazapyr, Triclopyr, and a modified seed oil surfactant, must cover at least 95% of each unit using a GPS flagging system. The project is divided into two phases: Unit 1, consisting of at least 504 acres, must be completed by September 30, 2027, and Unit 2, consisting of the remaining 508 acres, must be completed by September 30, 2028. Chemical operations must be finalized by September 30 of each year to ensure effectiveness before January replanting. The contract will be awarded to the respondent offering the lowest total lump sum amount, with a point-based tie-breaking system favoring certified minority business enterprises, veteran's business enterprises, and those with a drug-free workplace program. Bidders must submit their responses electronically via DemandStar by December 3, 2026. Required security includes a bid bond and a performance bond of $50,000 or ten percent of the total contract amount. Payment is issued via electronic funds transfer within 30 days following inspection and approval of the work by the District Project Manager.
Support Activities for Forestry

POSTED

about 20 hours ago

DEADLINE

in 22 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS