STUD, TURNLOCK FASTENER
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract pertains to the procurement of 237 units of a STUD, TURNLOCK FASTENER with part number CA1824-1 and NSN 5325-00-414-7702, designated as a critical application item. Supply is to be provided by ALCOA GLOBAL FASTENER and HOWMET GLOBAL FASTENING SYSTEMS INC., both under the same part number and procurement reference. The contract mandates strict adherence to technical and quality requirements outlined in the DLA Master List of Technical and Quality Requirements, with packaging, labeling, and marking governed by MIL-STD-129 and ASTM D3951, where DLA requirements supersede ASTM standards. Sampling and inspection protocols require compliance with MIL-STD-1916 or ASQ H1331, applying zero-defect acceptance criteria for all attributes unless otherwise specified, with critical, major, and minor characteristics assigned verification levels VII, IV, and II or AQLs of 0.1, 1.0, and 4.0 respectively. Delivery is to be FOB origin with a 171-day lead time, and the required delivery date is January 18, 2027, with a need ship date of January 17, 2027. No quantity variance is permitted—zero plus or minus. Inspection and acceptance both occur at the destination, specifically at the DLA Distribution Depot in Tinker AFB, Oklahoma. Packaging must be palletized per DLA Packaging Requirements (RP001), with all units clearly marked and labeled as directed. Transportation logistics follow DLAD Proc Note C19 for general shipping and C20 for first destination routing. The contract is issued under solicitation SPE4A6-26-T-08HR, with the unit of issue being each (EA), and all terms enforceable as of the solicitation issue date, governed by the applicable DLA revision of technical standards in effect at that time.
General Info
Agency
NAICS
Place of Performance
3301 F AVE CEN REC BLDG 506 DR 22, TINKER AFB, OK, 73145-8000, USSet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
STUD, TURNLOCK FASTENER
RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS
(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE
DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB
AT:
http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx
FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES
RQ017: PHYSICAL INDENTIFICATION/BARE ITEM MARKING
SAMPLING:
THE SAMPLING METHOD SHALL BE IN ACCORDANCE WITH MIL-STD-1916 OR ASQ
H1331, TABLE 1 OR A COMPARABLE ZERO BASED SAMPLING PLAN UNLESS OTHERWISE
SPECIFIED BY THE CONTRACT. IF THE APPLICABLE DRAWING, SPECIFICATION,
STANDARD, OR QUALITY ASSURANCE PROVISION (QAP) SPECIFIES CRITICAL, MAJOR
AND/OR MINOR ATTRIBUTES, THEY SHALL BE ASSIGNED VERIFICAITON LEVELS OF
VII, IV AND II OR AQLS OF 0.1, 1.0 AND 4.0 RESPECTIVELY. UNSPECIFIED
ATTRIBUTES SHALL BE CONSIDERED AS MAJOR UNLESS SAMPLING PLANS ARE
SPECIFIED IN APPLICABLE DOCUMENTS. FOR MIL-STD-1916, THE MANUFACTURER
MAY USE THE ATTRIBUTE OR VARIABLE INSPECTION METHOD AT THEIR OPTION OR
PER THE CONTRACT. MIL-STD-105/ASQ Z1.4 MAY BE USED TO SET SAMPLE LOT
SIZE, BUT ACCEPTANCE WOULD BE ZERO NON-CONFORMANCES IN THE SAMPLE LOT
UNLESS OTHERWISE SPECIFIED IN THE CONTRACT.
ALCOA GLOBAL FASTENER (29372)
TORRANCE, CALIF.
P/N CA1824-1
CRITICAL APPLICATION ITEM
HOWMET GLOBAL FASTENING SYSTEMS INC. 29372 P/N CA1824-1
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the corresponding ANSI X12 unit of issue.
https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments% 2FDLMS%2FeApplications%2FLogDataAdmin%2FUnitofIssueandPurchaseUnit.xlsx&wdOrigin=BROWSELINK
SPE4A6-26-T-08HR
SECTION B
PR: 7017572971 PRLI: 0001 CONT’D
CLIN PR PRLI UI QUANTITY UNIT PRICE TOTAL PRICE.
0001 7017572971 0001 EA 237.000
NSN/MATERIAL:5325004147702
DELIVERY (IN DAYS):0171
DELIVER FOB: ORIGIN
QTY VARIANCE: PLUS 0% MINUS 0%
INSPECTION POINT: DESTINATION
ACCEPTANCE POINT: DESTINATION
PREP FOR DELIVERY:
PKGING DATA-QUP:001
WILL BE PACKAGED IN ACCORDANCE WITH ASTM D3951.
All DLA Master List of Technical and Quality Requirements take precedence over ASTM D3951. Mark and label all packaging and packing in accordance with MIL-STD-129. The Unit of Issue (U/I) and Quantity per Unit Pack (QUP) will be as specified in the contract/purchase order. PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
PARCEL POST ADDRESS:
SW3211
DLA DISTRIBUTION DEPOT OKLAHOMA
3301 F AVE CEN REC BLDG 506 DR 22
TINKER AFB OK 73145-8000
US
FOR TRANSPORTATION SEE DLAD DLAD PROC NOTE C19. FOR FIRST DESTINATION TRANSPORTATION SEE DLAD PROC NOTE
C20 AND CONTRACT
FREIGHT SHIPPING ADDRESS:
SW3211
DLA DISTRIBUTION DEPOT OKLAHOMA
3301 F AVE CEN REC BLDG 506 DR 22
TINKER AFB OK 73145-8000
US
Need Ship Date:01/17/2027 Original Required Delivery Date:01/18/2027
SPE4A6-26-T-08HR NSN/Part Number: 5325-00-414-7702 Quantity: 237 EA Purchase Request: 7017572971QTY: 237 Delivery: 171 days ADO
Similar Contracts
Same NAICS industry code
More opportunities from Department Of Defense → ASC COMMODITIES DIVISION
Same awarding agency
