Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Subgrade Excavation and Aggregate Base Supply

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

SC, USA

Set-Aside

NONE

Documents

This scope was carved out of 3059.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Asphalt Resurfacing for Solid Waste Convenience Centers

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencySouth Carolina → Public Works
ContactsNo contacts available
OfficeN/A
Organization / AgencySouth Carolina → Public Works
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs aggregate base material for prime contractors on York County Public Works facility projects. Identifies and removes unsuitable subgrade/base material and furnishes and places aggregate base material for subgrade repair per SCDOT specifications. Uses excavation and compaction equipment to stabilize soft or rutting areas. Delivers stabilized subgrade and installed aggregate base.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
South Sacramento Sidewalk Gap Closure Tree Removal Project
Solicitation # 41021
The South Sacramento Sidewalk Gap Closure Tree Removal Project, solicitation 41021, is a CUPCCAA project managed by the County of Sacramento Department of Transportation. The contractor is required to provide all labor, materials, and equipment to remove designated trees along Cottonwood Lane and Stevenson Avenue to support new sidewalk construction and infrastructure improvements. The scope includes cutting limbs and trunks to a height of two feet above existing grade, with no stump grinding required. All debris must be legally disposed of, and the contractor is responsible for traffic control, protecting non-designated trees, and restoring any damaged utilities or improvements. To avoid nesting season, tree removal must be completed by January 31st, or otherwise approved by the engineer and surveyed by the Agency if performed after February 1st. The estimated construction cost is 110,000 dollars, with the contract award based on the lowest responsive and responsible base bid. The period of performance is twenty working days, and the project is subject to prevailing wage requirements and specific hourly restrictions near Florin High School. Bidders must provide a bid bond or certified check for at least 10 percent of the bid amount, and the successful awardee must execute performance and payment bonds for 100 percent of the contract price. Evaluation factors include regulatory compliance with California Air Resources Board Advanced Clean Fleets regulations. Bids must be submitted electronically via the Sacramento County Electronic Bidding Portal by October 22, 2026.
County of Sacramento, Community Services Agency, Department of Transportation

POSTED

about 12 hours ago

DEADLINE

in 14 days
View Details

More opportunities from South Carolina → Public Works

Same awarding agency

NAICS: 237310
New
SLED
Asphalt Resurfacing for Solid Waste Convenience Centers
Solicitation # 3059
York County Public Works is soliciting sealed bids for the asphalt resurfacing of four Solid Waste Collection and Recycling Centers located at Eastview, Lesslie, Ogden Road, and Mt. Gallant in South Carolina. The project encompasses approximately 6,155 square yards of pavement work, including the cold milling or removal of four inches of existing asphalt, subgrade inspection and repair, and the installation of six inches of new compacted hot-mix asphalt. All work must adhere to South Carolina Department of Transportation specifications. To minimize operational disruption, facility closures are restricted to a maximum of three business days. The contract will be awarded to the lowest responsible and responsive bidder based on price, product evaluation, and prior service history. Bidders must be licensed in South Carolina and provide a bid bond of 5 percent if the total bid exceeds 50,000 dollars. The successful contractor is required to provide performance and payment bonds equal to 100 percent of the contract amount, valid for two years after final payment. Insurance requirements include at least 1 million dollars in general and automobile liability coverage, along with statutory workers compensation. Submissions must be uploaded in PDF format via the OpenGov portal by the November 4, 2026, deadline.
Highway, Street, and Bridge Construction

POSTED

about 14 hours ago

DEADLINE

in 27 days
View Details
NAICS: 237310
SLED
County Transportation Committee (CTC) 2026 Resurfacing Plan
Solicitation # 2027-10
Dorchester County is soliciting bids for the County Transportation Committee (CTC) 2026 Resurfacing Plan, a project with an estimated cost of 3,000,000 dollars. The scope of work involves the resurfacing of nine centerline miles of local paved roadways, including asphalt milling, resurfacing, full-depth patching, full-depth reclamation, striping, and concrete repairs. A key technical requirement is the use of Warm Mix Asphalt (WMA) produced and placed according to SCDOT specifications, with strict temperature controls between 220 and 285 degrees Fahrenheit. The contractor is also responsible for adjusting utility valves and manholes to match the new roadway. The contract will be awarded to the lowest responsive and responsible bidder. Submissions must be made electronically via the OpenGov portal by October 14, 2026, at 2:00 pm. Once a Notice to Proceed is issued, the contractor must achieve substantial completion within 270 calendar days, with final completion due within 60 calendar days thereafter. Required security includes a bid bond of 5 percent for bids exceeding 25,000 dollars, as well as performance and payment bonds at 100 percent of the contract amount. Payment is due within 30 days of approved invoices. The contractor must also comply with ADA and Title VI of the Civil Rights Act of 1964.
Highway, Street, and Bridge Construction

POSTED

28 days ago

DEADLINE

in 6 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS