Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Vermont was posted on March 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Subsurface Exploration for Siting of Potential Stormwater Treatment Practices

Closed
ENG-26-01State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
RFP/RFQ - On-Call Engineering Services for Torrington Transfer Station/NRRA
Solicitation # EDC 11- 2026 -01
The Northwest Hills Council of Governments (NHCOG) is soliciting proposals under solicitation number EDC 11- 2026 -01 for on-call engineering services to support the Torrington Transfer Station and the Northwest Resource Recovery Authority (NRRA). The agency seeks a qualified firm specializing in Municipal Solid Waste and Recycling Transfer Stations to provide technical analysis, facility and operational capacity assessments, site planning, and permitting assistance. These services are intended to support ongoing operations and inform the NRRA Strategic Plan and future capital investment decisions, ensuring compliance with CT DEEP General Permits. Interested firms must submit their proposals by November 30, 2026, at 11:00 AM. Submissions must include a project management plan, key personnel resumes limited to two pages, three relevant references, a technical approach, and a detailed project timeline. A fee proposal containing hourly rates or lump sum allocations must be submitted in a separate sealed envelope. Evaluation will be based on personnel qualifications, experience with multiuse trails and waste facility planning, the proposed project approach, and the fee schedule. Awardees must provide proof of workers compensation, liability, and vehicle insurance, including a waiver of subrogation and naming the State of Connecticut and NHCOG as additional insureds within ten days of the award. Required documentation also includes a Non-Collusion Affidavit and certifications of non-discrimination.
DAS Procurement

POSTED

about 14 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract involves hiring a Geotechnical Engineer to conduct subsurface explorations and provide detailed geotechnical reports for three City-owned locations in Vermont. These sites are being evaluated for the installation of potential stormwater treatment practices (STPs). The agreement follows the EJCDC E-530 standard form, which governs the professional services between the Owner and the Geotechnical Engineer. It allows for amendments if additional services are required to support the design and construction phases or if further investigation of alternative sites becomes necessary. The solicitation, titled "Subsurface Exploration for Siting of Potential Stormwater Treatment Practices," was posted on March 24, 2026, with a submission deadline of April 16, 2026. The Department of Economic Development for Vermont is managing the contract, and the point of contact for inquiries is available via email and phone. The work is to be performed within Vermont, and the contract details and instructions are accessible through the Vermont Business Registry. This project is important for advancing stormwater management infrastructure through precise geotechnical data to guide effective design and construction decisions.

General Info

Hire Geotechnical Engineer for subsurface exploration and reports at three Vermont stormwater sites.

Place of Performance

VT, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont → Department of Economic Development
Contacts1 person available
OfficeVT, USA

Full Description

Show more
The Owner is seeking a Geotechnical Engineer to perform subsurface explorations and deliver geotechnical data reports for three City-owned sites identified for potential stormwater treatment practices (STPs). The Agreement will utilize EJCDC E-530, Agreement Between Owner and Geotechnical Engineer for Professional Services. The Agreement may be amended as mutually agreed upon for additional services in support of design and construction of these STPs by others, or for further exploration of alternative sites. Refer to the RFP Instructions for detailed information about the Project and the Agreement.

More opportunities from Vermont → Department of Economic Development

Same awarding agency

New
SLED
Cognitive Behavioral Risk Interventionist - NSCF
Solicitation # 77254
The State of Vermont Department of Corrections is seeking one or more licensed providers to deliver Cognitive Behavioral Risk Reduction services at the Northern State Correctional Facility in Newport, Vermont. These services target incarcerated individuals assessed with a moderate to high risk of reoffending, utilizing the evidence-based Risk-Needs-Responsivity (R-N-R) Model. The scope of work requires a commitment of 40 hours per week, consisting of approximately 10 to 12 ninety-minute group sessions weekly, with services provided for at least 48 weeks per calendar year. The contract is for an initial two-year term starting in December 2026, with options to renew for up to three additional twelve-month periods. Proposals are evaluated based on a 50-point scale focusing on the ability to deliver department-provided curriculum, professional instructor experience, experience with incarcerated populations, consistent work performance, and familiarity with manualized curriculum. Preference is given to Vermont resident bidders and those promoting clean energy and climate change initiatives. Selected contractors must complete mandatory training in ADA, FERPA, PREA, HIPAA, and Criminal Justice Information Systems within 90 days of starting services. Bids must be submitted as a single searchable PDF to the designated point of contact by the November 2, 2026 deadline and must include a cover letter, price schedule, and a signed Certificate of Compliance.

POSTED

about 16 hours ago

DEADLINE

in 6 days
View Details
NAICS: 541330
New
SLED
Windham Bank Stabilization #CA0901
Solicitation # CA0901
The Town of Windham, Vermont, is soliciting proposals under solicitation number CA0901 for professional engineering services to design and implement bank stabilization upgrades along West Windham Road where it abuts Cobb Brook. The project covers approximately 10,000 square feet, measuring 225 feet in length and 45 feet in height, to address severe erosion and roadway undermining. The selected consultant will be responsible for the full project lifecycle, from the development of conceptual plans and topographic surveys to the creation of final contract plans, specifications, and estimates. All work must adhere to the VTrans Municipal Assistance Section process, including the MAS Guidebook for Municipally Managed Projects and the VTrans 2024 Standard Specifications for Construction. Proposals must be submitted electronically to Mike McConnell by November 30, 2026, and must be divided into two separate files: a technical proposal and a cost proposal. The technical proposal is limited to 15 pages for the primary sections and must include a detailed scope of work, a list of committed personnel, a proposed project schedule, and evidence of success on similar projects. Award recommendations will be made by a five-member selection committee to the Town Selectboard and the MAS Project Supervisor. Key requirements for the awarded firm include obtaining insurance per VTrans specifications, providing a written work zone safety assessment, and securing utility and railroad clearances. While a specific period of performance is not mandated, the RFP notes that Federal Aid projects typically require at least four years from grant award to construction completion.
Engineering Services

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS