Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from North Carolina was posted on August 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Subsurface Utility Exploration (SUE)

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
Federal
SR Power Supplies Rack Detailed Design for ALS-U
Solicitation # AA-2027-01
The University of California, acting on behalf of the Lawrence Berkeley National Laboratory (LBNL), has issued Request for Proposal No. AA-2027-01 for the detailed design of ALS-U Storage Ring Power Supplies rack assemblies. This engineering services solicitation, classified under NAICS 541330, requires a subcontractor to complete the detailed design of 76 power supply racks across 16 distinct layouts, categorized into Standard, Hard Bend, and ATS/STA sectors. The scope includes developing 3D models using Autodesk Inventor Professional 2025, production drawings, electrical diagrams, and cable-harness documentation. The project follows a phased approach with six mandatory design review milestones, including Preliminary Design Reviews (PDR) and Final Design Reviews (FDR), with a target completion date for the full Technical Data Package of January 31, 2027. The period of performance for the resulting subcontract is expected to extend through January 31, 2029. Proposals must be submitted via email or secure electronic transmission to the University Procurement Representative no later than midnight PST on October 2, 2026. Submissions must include a Technical Volume addressing methodology, schedule, personnel, past performance, and quality assurance, as well as a Business Volume containing the price proposal and mandatory enclosures. The price proposal must feature a firm fixed price for the design package and a separate rate for on-call hourly support. LBNL will award the contract based on the best overall value, evaluating both technical expertise and non-technical factors such as the acceptance of subcontract terms. Mandatory submission requirements include a completed ALS-U Quality Evaluation Survey and a Standard Form Representation and Certification form. The work is primarily to be performed at the subcontractor's facility with remote coordination and occasional on-site visits to Berkeley, California.
Berkeley National Labor - DOE Contractor

POSTED

about 9 hours ago

DEADLINE

in 18 days
NAICS: 541330
New
SLED
Keller Community Center Roof Replacement Engineering & Design
Solicitation # RFP-KCC-Roof-Design.pdf
The Confederated Tribes of the Colville Reservation is seeking a Washington State Certified and Licensed Engineering Firm to provide stamped engineered drawings and specifications for the replacement of approximately 10,000 square feet of roofing at the Keller Community Center in Nespelem, Washington. The scope of work includes providing construction-ready documents, RFI responses, submittal reviews, professional guidance on asbestos, and assistance with the Construction RFP Scope of Work. The contractor is responsible for providing cost estimates for the entire project and individual sections, including the gymnasium, metal roof, and walkway roof, while ensuring HVAC curbs are sealed and engineering a ladder for roof access. Engineering services are scheduled for completion between October 2026 and March 2027, with continued support through the construction phase. Proposals must be submitted by 3:00 p.m. PST on October 29, 2026, and must not exceed 30 pages. Evaluation is based on a 100-point scale considering technical responsiveness, qualifications, experience, cost, and TERO preferences, with a specific price preference for responsible Indian Offerors within 10 percent of the lowest bid. Awarded contractors must consent to the jurisdiction of the Colville Tribal Court and maintain comprehensive insurance, including Commercial General Liability of 1 million dollars per occurrence. Additionally, contracts exceeding 100,000 dollars require a performance bond, otherwise, a 25 percent retainage applies. All payments are contingent upon the availability of funds within the tribal treasury and follow a fiscal year from October 1 to September 30.
Confederated Tribes of the Colville Reservation

POSTED

about 14 hours ago

DEADLINE

in 28 days

AI Contract Overview

Show more

This subcontract for the City of Raleigh involves providing subsurface utility exploration services for water and sewer main projects. The selected provider will work with prime contractors to identify and map underground utilities using electromagnetic locators, GPR scanning, and vacuum excavation potholing. All work must be performed according to ASCE 38-02 standards to prevent installation conflicts, with the final deliverables consisting of utility conflict reports and SUE maps. The opportunity is categorized under NAICS code 541330 and was posted on August 14, 2026. Interested parties must submit their responses by the deadline of September 18, 2026.

General Info

Subcontract for City of Raleigh subsurface utility exploration services; deadline September 18, 2026.

Place of Performance

NC, USA

Set-Aside

NONE

Documents

This scope was carved out of 274-GAL2.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Galvanized Main Replacement Phase 2

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNorth Carolina → City of Raleigh
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs subsurface utility exploration for prime contractors on City of Raleigh (Raleigh Water) water and sewer main projects. Identifies and maps underground utilities using vacuum excavation (potholing), GPR scanning, and electromagnetic locators per ASCE 38-02 standards to prevent installation conflicts. Delivers SUE maps and utility conflict reports.

More opportunities from North Carolina → City of Raleigh

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS