Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Energy was posted on April 8, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Superconducting Undulator Core Potting Mold Assembly

Closed
1-B139-Q-00443-00Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

NAICS

332710 - Machine Shops

Place of Performance

Lemont, IL, 60439, USA

Set-Aside

NONE

Documents

7

1.9m+potting+mold+Updated+4MAR2021.pdf

PDF

ANL-70+Request+for+Quotation.doc

DOC

Appendix+A-71COM-04-JAN-2021.pdf

PDF

Appendix+D8C-02-JUL-2020.pdf

PDF

Potting+Mold+APS-U+ANL-407+Procurement+QA+Form.pdf

PDF

Reps+and+Certs+PD-158.doc

DOC

SOW+SCU+Core+Potting+Mold+Assembly+DJC+Edit.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Argonne National Labor - DOE Contractor
Contacts1 person available
OfficeLemont, IL, 60439, USA
Office AddressLemont, IL, 60439, USA
Contacts

Full Description

Show more
The scope of work to be performed by the vendor consists of producing the core potting mold assembly according the attached drawing package. All dimensional, material, surface finish, parallel call-outs and notational specifications on the individual drawings must be followed. Note: The magnet winding core shown on the overall assembly drawing is not part of this scope. Please see the attached Statement of Work (SOW) for key technical requirements, material requirement, delivery schedule, and quality assurance documentation requirements for the superconducting undulator core potting mold assembly.

More opportunities from Department Of Energy → Argonne National Labor - DOE Contractor

Same awarding agency

NAICS: 333994
New
Federal
Custom R&D Industrial Furnace
Solicitation # 7-S176-Q-00012-00
Argonne National Laboratory (ANL) is soliciting a firm fixed price contract under solicitation 7-S176-Q-00012-00 for the design, fabrication, delivery, installation, and commissioning of a custom industrial R&D furnace. The furnace is intended for testing fuel-flexible burners using natural gas and hydrogen blends from 0 to 100 percent H2, supporting both direct and indirect-fired configurations. Key technical specifications include a maximum continuous firing rate of 5 MMBtu/hr, a maximum bulk temperature of 2400 degrees Fahrenheit, and the inclusion of 70 threaded instrumentation ports and high-temperature optical windows. The project is expected to take approximately six months, with a target completion date of June 2027 and a planned award date in January 2027. Award will be made based on the Lowest Price Technically Acceptable (LPTA) basis, with technical acceptability evaluated on a pass/fail basis. Offerors must provide a completed ANL-70 Request for Quotation, technical compliance responses, country of origin information per FAR 52.225-1, and signed ANL-70B representations and certifications. Performance involves fabrication at the supplier's facility and installation at ANL Building 362 in Lemont, Illinois. Acceptance is contingent upon successful commissioning with a natural gas fired burner for at least two hours, ensuring the exterior shell temperature does not exceed 176 degrees Fahrenheit. The contract includes various FAR and DEAR clauses regarding labor standards, small business utilization, and safety, and requires specific insurance certifications and a High Risk Job Safety Analysis Form ESH-209 before a Notice to Proceed is issued.
Industrial Process Furnace and Oven Manufacturing

POSTED

about 16 hours ago

DEADLINE

in 14 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS