Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Washington was posted on April 30, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Supply of CALVE SET (Calibration Kit)

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 332996
New
DIBBS
NUT, TUBE COUPLING
Solicitation # SPE7M3-27-T-1303
This contract, issued by the DLA Weapons Support Fluid Handling Division, is a small business set-aside solicitation for the procurement of 1,559 tube coupling nuts (NSN 4730-01-543-0356). The items must be manufactured from cadmium-plated 15-5PH stainless steel with .4375-20 UNJF-3B threads. Due to previous customer issues, the DCMA is required to perform a mandatory inspection to verify the presence of threads. The product is classified as a critical application commercial item and must be supplied by a manufacturer or distributor accredited and listed on the Performance Review Institute (PRI) Qualified Manufacturer List (QML) or Qualified Products List (QPL). Technical compliance is governed by standards SAE AS21921D and SAE AS18280H. The procurement is split into two delivery locations: 1,237 units to DLA Distribution Warner Robins and 322 units to DLA Distribution San Diego. The required delivery date is September 29, 2028, with a delivery window of 424 days after order. Shipping is designated as FOB Origin, and packaging must adhere to MIL-STD-2073-1E and MIL-STD-129. Environmental restrictions prohibit the use of Class I ozone-depleting chemicals and the intentional addition of mercury. Administrative requirements include the use of the Wide Area WorkFlow (WAWF) system for invoicing and adherence to various FAR and DFARS clauses regarding cybersecurity, hazardous material labeling, and the Buy American program.
DLA WEAPONS SUPPORT FLUID HANDLING DIVISION

POSTED

about 22 hours ago

DEADLINE

in 10 days
NAICS: 332996
New
DIBBS
BUSHING, PIPE
Solicitation # SPE7M3-27-T-1307
Solicitation SPE7M3-27-T-1307, issued by the DLA Weapons Support Fluid Handling Division, is a small business set-aside for the procurement of pipe bushings under NSN 4730-00-580-7417. The requirement is for 276 packages (PG), with each package containing 5 units, totaling 1,380 individual bushings. The items must comply with the SAE J514-3 standard (Revision 12/01/2023) and are designated as critical application items. Delivery is required within 41 days after the order, with a need ship date of January 8, 2027, and a final required delivery date of April 26, 2027. The shipping terms are FOB Origin, with inspection and acceptance occurring at the destination, specifically the DLA Distribution Depot at Hill AFB, Utah. The contract mandates strict adherence to environmental and safety standards, prohibiting the use of Class I ozone-depleting chemicals and the intentional addition of mercury or mercury-containing compounds. Packaging must follow MIL-STD-2073-1E and RP001 requirements, while marking must comply with MIL-STD-129. Administrative processing for payments and receiving reports must be handled electronically via the Wide Area WorkFlow (WAWF) system. Key regulatory clauses include the Buy American Act, DFARS cybersecurity requirements for safeguarding covered defense information, and specific prohibitions against covered defense telecommunications equipment.
DLA WEAPONS SUPPORT FLUID HANDLING DIVISION

POSTED

about 22 hours ago

DEADLINE

in 10 days
NAICS: 332996
New
DIBBS
TEE, TUBE TO BOSS
Solicitation # SPE7M4-27-T-3274
Solicitation SPE7M4-27-T-3274, issued by the DLA Weapons Support Fluid Handling Division, is for the procurement of 21 steel Tee Tube to Boss components with a 3/8 inch OD tube size. This is designated as a critical application item and a commercial item that requires manufacture by an accredited manufacturer and/or assembly by an accredited distributor as listed in the Performance Review Institute Qualified Manufacturer List (QML) or Qualified Products List (QPL). The manufacturing process must utilize forging, and the items must adhere to Class 3 thread standards and technical specifications SAE AS1032H (Revision H) and SAE AS4875/1A (Revision A). The use of Class I ozone depleting chemicals is strictly prohibited. The contract specifies a delivery lead time of 165 days after order, with a need ship date of May 12, 2027, and an original required delivery date of June 18, 2028. Delivery is FOB Origin, with inspection and acceptance occurring at the destination, the DLA Distribution Depot Oklahoma at Tinker AFB. Packaging must comply with ASTM D3951 and MIL-STD-129, with DLA Master List of Technical and Quality Requirements taking precedence. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and compliance with various FAR and DFARS clauses, including the Buy American and Balance of Payments Program and NIST SP 800-171 cybersecurity standards.
DLA WEAPONS SUPPORT FLUID HANDLING DIVISION

POSTED

about 22 hours ago

DEADLINE

in 10 days

AI Contract Overview

Show more

The City of Spokane in Washington is seeking a subcontract for the supply of a complete Calibration Valve Set, also referred to as a Calibration Kit. This equipment is required for the routine maintenance of an opacity monitor and must include all necessary components and supporting documentation. The solicitation was posted on April 30, 2024, with a response deadline of July 15, 2024. The procurement falls under NAICS code 332996, focusing on the delivery of specialized hardware to ensure the continued operational accuracy of monitoring systems.

General Info

City of Spokane seeks a subcontract for a complete Calibration Valve Set.

Documents

This scope was carved out of 6124-24.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Opacity Monitor Replacement Parts As Needed, For Land-Ametek MkIII Opacity Monitors In Use At COS WTEF

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Metallic Bent Pipe Fabrication and SupplyOpen now, due in 8 days
  • Metal Tube Assembly Fabrication and SupplyOpen now, due in 11 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → City of Spokane
ContactsNo contacts available
OfficeN/A
Organization / AgencyWashington → City of Spokane
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Provide a complete CALVE SET (likely Calibration Valve Set) for routine maintenance of the opacity monitor, including all components and documentation.

More opportunities from Washington → City of Spokane

Same awarding agency

NAICS: 541512
New
SLED
CSO 24, 26 Storage and Springfield Lift Station SCADA Upgrade
Solicitation # 6645-26
The City of Spokane is soliciting proposals for SCADA upgrade services for the CSO 24, 26 Storage and Springfield Lift Station. This project is the second phase of a SCADA monitoring and control Master Plan, focusing on data acquisition, historization, alarming, and security. The scope of work includes the installation, configuration, and networking of a SCADA system using PlantPAx and Allen Bradley/Rockwell Automation products. Key deliverables include a turnkey, fully operational SCADA system, exhaustive project documentation, and the completion of a Final Site Acceptance Test. The project requires adherence to Converged Plant Wide Ethernet standards and must receive a Rockwell Automation System ID upon completion. The contract is expected to begin in March or April 2027 with a primary duration of one year, renewable for an additional six months upon mutual agreement. Proposals must be submitted electronically via the ProcureWare portal by December 29, 2026, at 11:00 AM. Qualified firms and system integrators must possess at least three years of experience and are preferred to hold Rockwell Silver Level System Integrator ranking and PlantPAx badged integrator certification. Awarding will be based on the proposal most favorable to the City, with evaluation focusing on technical management and completeness. Required insurance includes General Liability, Professional Liability, and Workers Compensation, with a 90-day proposal acceptance period.
Computer Systems Design Services

POSTED

6 days ago

DEADLINE

in about 1 month
View Details
NAICS: 541310
New
SLED
Spokane Central Service Center Office Space Design Services
Solicitation # 6644-26
The City of Spokane is soliciting proposals through RFQu 6644-26 for architectural and engineering design services to develop six new office spaces within the Central Service Center Building located at 915 N Nelson St, Spokane, WA. The scope of work includes conducting site visits, developing architectural and engineering concepts, managing the building permitting process, and providing construction submittal reviews and site inspections. Key deliverables include a final engineer's cost estimate and a 100% permit and bid-ready drawing and specification package. The project involves moderate modifications to HVAC, lighting, electrical, fire suppression, and glazing. The resulting contract will have an initial term of 18 months, with an option to renew for one additional year upon mutual agreement. Qualified firms must possess at least five years of experience in A&E design services, be licensed to do business in Washington State, and obtain a City of Spokane endorsement for their business license. The selection process is based on a weighted evaluation of the Technical Proposal (50%) and Management Proposal (50%), with the City reserving the right to invite top-scoring firms for oral presentations. All project management must be conducted through the ProCore environment. Contractors are required to maintain specific insurance coverages, including General Liability of $1 million per occurrence and $2 million aggregate, and Automobile Liability of $1 million. Legal terms specify that the work is considered work made for hire under the U.S. Copyright Act, and all disputes must be litigated in Spokane County, Washington. Proposals must be submitted electronically via the ProcureWare portal by the December 8, 2026, deadline.
Architectural Services

POSTED

6 days ago

DEADLINE

in 21 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS