Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Department Of Defense was posted on August 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Supply of MRG Thrust Bearing (Long Lead Time Material)

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This subcontract involves the procurement and delivery of a naval-grade Main Reduction Gear thrust bearing, categorized as long lead time material. The equipment is intended for installation on the USS MAKIN ISLAND (LHD-8) during its Dry Docking Selected Restricted Availability. The contract is managed by the Southwest Regional Maintenance Center under the Department of Defense, with the place of performance located in National City, California. The solicitation was posted on August 24, 2026, with a response deadline of August 31, 2026, falling under NAICS code 333613.

General Info

Procurement of naval-grade thrust bearing for USS MAKIN ISLAND in National City, California.

NAICS

333613 - Mechanical Power Transmission Equipment Manufacturing

Place of Performance

National City, CA, 91950, USA

Set-Aside

NONE

Documents

This scope was carved out of N5523626Q0105.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

SOLICITATION _ MAIN REDUCTION GEAR (MRG) THRUST BEARING - INTENT TO SOLE SOURCE

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Southwest Regional Maintenance Center
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Procurement and delivery of a naval-grade Main Reduction Gear (MRG) Thrust Bearing for installation aboard USS MAKIN ISLAND (LHD-8) during DSRA.

More opportunities from Department Of Defense → Southwest Regional Maintenance Center

Same awarding agency

NAICS: 336611
New
Federal
USS OKANE (DDG-77); 7MRB0604 Standalone
Solicitation # N5523627R0007
The Southwest Regional Maintenance Center intends to award a competitive Firm-Fixed Price supply contract for the preservation, hull, mechanical, and electrical/electronic repairs of a Willard 7-meter Rigid Inflatable Boat (RIB), hull 7MRB0604, and its associated trailers for the USS OKANE (DDG-77). This total small business set-aside, categorized under NAICS code 336611, is anticipated to be solicited on November 18, 2026. The period of performance is approximately eleven months, beginning January 25, 2027, and concluding with craft delivery by October 22, 2027. Work must be performed at a contractor facility within a 50-mile radius of Naval Base San Diego. The scope of work includes comprehensive labor, supervision, and quality assurance to return the craft to mission-ready status. Key technical requirements involve the installation of a new 230 horsepower Framework 2.2 engine with associated electrical components, extensive surface preparation achieving 95 percent abrasion, and a like-new paint finish on all gel coated surfaces. The contractor is also responsible for procuring new boat trailers and installing a boat alteration placard. Compliance with NAVSEA Standard Items and NSTM Chapters 583 and 631 is required. Acceptance is contingent upon successful completion of contractor bay trials and a final two-hour government waterborne trial to verify all repairs.
Ship Building and Repairing

POSTED

5 days ago

DEADLINE

in 11 days
View Details
NAICS: 336611
Federal
SOUTHWEST REGIONAL MAINTENANCE CENTER (SWRMC) SUBMARINE REPAIR FOLLOW-ON MULTIPLE AWARD CONTRACT (MAC) INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ)
Solicitation # N5523627R0008
The Southwest Regional Maintenance Center (SWRMC) is conducting market research via a sources sought notice for a future follow-on multiple award contract (MAC) indefinite delivery, indefinite-quantity (IDIQ) for submarine repair. The primary objective is to perform depot-level maintenance and repair availabilities, including Continuance Maintenance Availability (CMAV) and Docking Continuance Maintenance Availability (DCMAV), for U.S. Navy submarines home ported in or visiting San Diego, California. The scope of work is strictly limited to non-nuclear and non-SUBSAFE requirements, specifically targeting the forward compartment forward of frame 50 for 688 CL submarines and areas forward of containment for Virginia and Trident class submarines. The anticipated contract will be firm fixed price under NAICS code 336611, with a projected RFP release date around December 4, 2026. The contractor must provide all labor, equipment, materials, and facilities, and is required to maintain a SWRMC-approved Quality Management System in accordance with NAVSEA Standard Item 009-04 and ISO standards. Strict security requirements apply, including a facility clearance at the SECRET level and personnel clearances at a minimum of CONFIDENTIAL for U.S. citizens. Performance will be monitored through various Contract Data Requirements List (CDRL) reports and schedules based on the duration of the availabilities. Interested parties, with a particular emphasis on small businesses, must submit a letter of interest by November 13, 2026, detailing their capabilities, past performance, and security clearances to be considered for the future solicitation.
Ship Building and Repairing

POSTED

11 days ago

DEADLINE

in 6 days
View Details
NAICS: 333414
Federal
Marine HVAC System Overhaul and RepairThe contract calls for a complete Class B overhaul of the ship’s Number 4 Air Conditioning Plant, encompassing full disassembly, detailed inspection, repair or replacement of any failed components, and precise reassembly to restore full operational capability. The work is specifically focused on ensuring the system regains its intended cooling capacity to support aft electronic systems and maintain crew habitability, with rigorous testing and operational verification required to confirm performance meets all operational standards. The overhaul must be executed to meet naval maintenance specifications, ensuring reliability and durability under marine operating conditions. This subcontract is managed by the Southwest Regional Maintenance Center under the Department of Defense, with performance designated to occur in San Diego, California, at the 92136 ZIP code location. The work falls under NAICS code 333414, which pertains to HVAC equipment manufacturing and repair services, indicating the technical scope requires specialized knowledge in marine environmental control systems. The solicitation was posted on May 12, 2026, and while no set-aside designation or point of contact is provided, the contract is structured as a subcontract and is tied to the broader defense maintenance infrastructure supporting ship readiness and fleet sustainment.
Heating Equipment (except Warm Air Furnaces) Manufacturing

POSTED

6 months ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS