Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity was posted on June 19, 2017. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Surveillance Camera Installation

Closed
FA8201-17-Q-CP05Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 561621
New
Centennial Fire Alarm & CO Detection Upgrade and Maintenance Services
Solicitation # centennial-fire-alarm-co-detection-upgrade-maintenance-services
Management & Training Corporation is soliciting bids for a fixed-price, single lump sum contract to provide fire alarm and carbon monoxide detection upgrade and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The primary objective is to restore the central Simplex 4020 Fire Alarm Control Center Panel and connected systems across nine campus facilities to full operational status. The scope of work includes diagnosing and clearing system faults, upgrading motherboard firmware if necessary, and integrating intelligent multi-criteria CO detectors and sounder bases into the men's and women's dormitories. All work must adhere to NFPA 101 (2024), NFPA 72 (2025), IFC (2024), and local building and fire codes. Bids are due by December 1, 2026, and must be submitted via email with a detailed cost breakout, proof of insurance, and a signed bid form. A physical site visit is mandatory prior to submission. For bids equal to or exceeding $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from an A-rated surety. This project is subject to the Davis-Bacon Act, requiring compliance with prevailing wage determinations and the submission of weekly certified payroll reports for payment processing. The solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. Award will be based on overall best value.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 8 hours ago

DEADLINE

in about 1 month
NAICS: 561621
New
SLED
C26950006 - Inland Empire District - Alarm Monitoring Service Contract
Solicitation # C26950006
The California Department of Parks and Recreation is soliciting bids for an alarm monitoring service contract for the Inland Empire District. The selected contractor will provide 24-hour, seven-day-a-week monitoring and maintenance for 31 locations across the Perris, Chino, Mt. San Jacinto, and Silverwood Lake SRA sectors. The scope of work includes the installation, programming, and maintenance of security components such as motion sensors, door contacts, and panic alarms, utilizing Digital Monitoring Products XR150 Network Control Panels with cellular backup and the Virtual Keypad management system. The contract term is for three years, with an anticipated performance period starting February 2, 2027, and ending February 1, 2030. To be eligible, bidders must be a UL Certified Monitoring Center owned and operated by the security installation company and hold a valid California contractor's license as a C-7, C-10, or B contractor. Award selection is based on the Low Price Method, with evaluation incentives available for certified Small Businesses and Disabled Veteran Business Enterprises, as well as preferences under the Target Area Contract Preference Act for bids exceeding 100,000 dollars. Bidders must provide comprehensive insurance coverage, including general liability of 2 million dollars and motor vehicle liability of 1 million dollars. Sealed bids are due by November 6, 2026, at 2:00 PM.
California Department of Parks & Recreation

POSTED

about 18 hours ago

DEADLINE

in 17 days

General Info

Agency

N/A

NAICS

561621 - Security Systems Services (except Locksmiths)

Place of Performance

729 Air Control Squadron (729 ACS) 6475 Warrior Way | Bldg 1938, HILL AFB, UT, 84056, USA

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Christian PealContracting Specialist
Tyler DavidsonContracting Officer

Full Description

Show more
I. Summary Contractor shall perform work necessary to supply and install parts for a surveillance camera system installation in and around buildings, 1926, 1927, 1930, and 1938 at the 729th Air Control Squadron, Hill Air Force Base, Utah. For buildings 1926 and 1930, the security system shall be exterior installations only. Fiber lines are available between buildings 1926, 1930, and 1938. All fiber leads back to building 1938. The contractor shall use line 11 or 12 depending if one or the other works correctly. (a) Contractor shall provide all labor, materials, equipment, transportation, and services required to accomplish all work related to installing equipment to manufacturer specifications. (b) Contractor shall provide all necessary training to be able to utilize the camera system efficiently. II. Project Description Contractor shall provide and install in total: (i) One (1) 5 Terabyte Hard Disk Drive Servers (ii) One (1) 16 Terabyte Network Attached Storage Server (iii) One (1) 24-Port Switch w/ mount (iv) One (1) 16-Port Switch w/ mount (v) One (1) 8-Port Switch w/ mount (vi) Thirty-two (32) each Single Internet Protocol (IP) camera Licenses (vii) Seventeen (17) each 1 Megapixel IP66 IR PTZ Bullet Network Camera (viii) Five (5) each 1 Megapixel IP66 Static IR Bullet Network Camera (ix) Ten (10) each 3 Megapixel IP66 IR Dome Network Camera (x) Four (4) 28" LCD Monitor w/ Wall Mounts (xi) One (1) Enclosed Server Rack (xii) Wires, Power Connections/Switches, Extenders, Conduit, and all miscellaneous parts, etc. required to install and make operational the security camera system. The abovementioned equipment shall be installed in the following locations: (a) Building 1938 Installation (Remote HUB | Security Office); - One (1) 5 Terabyte Hard Disk Drive Server - One (1) 16 Terabyte Network Attached Storage Server - One (1) 24-Port Switch w/ mount in communications room | Room 150 - Four (4) 28" LCD Monitor w/ Wall Mounts in security office | Room 156 - Two (2) exterior Static IR Bullet Network Cameras - Six (6) exterior IR PTZ Bullet Network Cameras - Ten (10) interior IR Dome Network Cameras ***The Two (2) exterior Static IR Bullet Network Cameras will be placed to view the gate entry points of the compound (see "Building 1938 Camera Position Map" & comments in PDF). ***Two (2) of the IR Dome Network Cameras will need to be installed in different points from the current in place system to allow for better viewing angles of the hallways and entrance (see "Building 1938 Camera Position Map" & comments in PDF). (b) Building 1926 Installation (Fiber leads back to 1938); - One (1) 16-Port Switch w/ mount in communications closet - One (1) exterior Static IR Bullet Network Camera will face building 1927 to allow well enough viewing angles and zoom to see the South entrance and bay of the building and the vindicator portal entry. - One (1) exterior Static IR Bullet Network Camera will face the South compound vehicle and vindicator gate. - Eight (8) exterior IR PTZ Bullet Network Cameras will be installed at the best possible locations to view the vehicle and K-Span parking areas surrounding building 1926. (c) Building 1930 Installation (Fiber leads back to 1938); - One (1) 8-Port Switch w/ mount in communications area - One (1) exterior Static IR Bullet Network Camera will face building 1927 to allow well enough viewing angles and zoom to see the North entrance and bay and the vindicator portal entry. - Three (3) exterior IR PTZ Bullet Network Cameras near each entrance of building 1930 (d) Final Outlook; All installed cameras shall be remotely viewable by the Four (4) 28" LCD Monitors at the main HUB located in the security office in Room 156 of building 1938. The system will be able to pan, tilt, and zoom applicable cameras by authorized account holders remotely. We would like for there to be clear visibility (not granular) on live and playback video recording. III. Work Schedule (a) Base Access requirements are in paragraph VIII. (b) Contractor shall perform work during 0800-1530hrs, Mon - Fri. (with the exception of observed U.S. holidays) (c) Contractor shall schedule work with Facility Management prior to start of equipment installation. POC's: SSgt Tansley (W#801-586-2830 | Email: robert.tansley@us.af.mil), SSgt Grose (W#801-777-0624 | Email: kenneth.grose@us.af.mil) and 729th Air Control Squadron Maintenance Operations Center (MOC) (W#801-777-0666 | Email: 29ACS.SCNC.AllPersonnel@us.af.mil) for scheduling. (d) Contractor shall check in and out with 729th Air Control Squadron Maintenance Operations Center (MOC) at the beginning and end of each work day. (e) All cleanup of grounds and building areas shall be completed by 1530 hours each work day. (f) Contractor shall provide a weekly written email report by close of business each Friday to the Facility Manager, SSgt Robert Tansley (robert.tansley@us.af.mil) of work progress. (g) Contractor shall use all precautions in installing equipment in facility as to not damage door jambs, walls, flooring, electrical panels/outlets or any other equipment due to installation. If damage occurs, include in weekly written email report, as well as verbal notification to SSgt Robert Tansley, or Communication Focal Point (CFP) member at the end of the work hours. (h) Contractor shall remove all packing material from equipment including boxes, packaging, taping and dispose of all materials into the garbage container on site. (i) Contractor shall make sure all equipment is set up, formatted, and operational while ensuring each camera and server meets specifications provided/listed in Quantities, paragraph V. (j) Contractor shall only use the restrooms located in buildings 1926 and 1938. (k) Contractor shall ensure work area is clean of any obstructions or debris which may interfere with normal operations. (l) Contractor shall be prohibited from using gym/kitchen equipment of building 1938. IV. Quantities The contractor shall prepare their proposal based on the following quantities described in paragraph V. V. Standard Equipment Descriptions (a) The below items are not brand specific, and are the minimum requirements that we will accept. Some example brand research completed for this project were Dell, ASUS, ACER, Samsung, Hikvision, Rotary, and CTVMAN. a. Interior viewing angles; The interior of building 1938 is for the majority, 6-ft wide hallways with heavy personnel traffic. Therefore, we will leave it up to your best judgement to determine the correct width viewing lenses. We would like the interior camera FPS to at a minimum be 1-15 FPS based on movement in the area viewed to save on digital storage of the NAS. Example: After duty hours there will be no movement for hours at a time. When someone passes by a camera that is operating correctly, it will jump from 1 FPS to 15 FPS to maintain a good image of the area of movement. b. Exterior viewing angles; The area is a large concrete lot with both pedestrian and vehicle traffic. We would like the exterior cameras FPS to at a minimum be 1-10 FPS based on movement in the area viewed to save on digital storage of the NAS. Example: After duty hours there will be no movement for hours at a time. When someone passes by a camera that is operating correctly, it will jump from 1 FPS to 10 FPS to maintain a good image of the area of movement. Item Description Quantity Unit 5 Terabyte Hard Disk Drive Server 1 each 16 Terabyte Network Attached Storage Server 1 each 24-Port Switch w/ mount 1 each 16-Port Switch w/ mount 1 each 8-Port Switch w/ mount 1 each Single Internet Protocol Camera License 32 each 1 Megapixel IP66 IR PTZ Bullet Network Camera 17 each 1 Megapixel IP66 Static IR Bullet Network Camera 5 each 3 Megapixel IP66 IR Dome Network Camera 10 each Enclosed Server Rack 1 each 28" LCD Monitor w/ Wall Mounts 4 each Wires, Power Connections/Switches, Extenders, As needed Conduit, and all miscellaneous parts, etc. required to install and make operational the security camera system VI. Period of Performance The contractor shall perform the installation of equipment within SIXTY (60) calendar days after contract award. In addition to the equipment warranty, the contractor shall provide a service warranty as described in Warranty, paragraph VII. Contractor shall be responsible to store equipment not subject to outside elements/in secured containment at contractor expense during work performance if necessary. Contractor may store containment at long-term parking at the South 729 Air Control Squadron compound entrance. All work shall be coordinated with Hill Air Force Base POC: SSgt Robert Tansley 801-586-2830 and 729th Air Control Squadron Communication Focal Point (CFP) 801-777-0666, before actual work begins or deliveries are made to the site. VII. Warranty The contractor shall provide a consecutive 6-Month service warranty in addition to any standard manufacturer warranty for parts & service on each product furnished. Service warranty shall cover manufacturer defect and hardware failure. A hardware failure is defined to include, but are not limited to: failure due to weather, manufacturing defect, electrical malfunction (not related to the commercial power), wildlife, and any other circumstance that would disassociate the cameras from working properly with the installed system. VIII. Security Forces Base Access Requirements (a) All visitors are required to have a valid state issued ID card (b) Drivers shall need a valid Driver License, current vehicle registration and proof of insurance to obtain a pass. (c) All visitors are subject to a criminal background check and may be denied access based on present criminal history. (d) During the scheduling process please email the above contacts the following information; Required Base Access Information (i) Visitors Name - (Last , First) (ii) Driver's License State/Number (iii) Supervisor's Title/Name/Email/Phone Number (e) Guests that are sponsored must arrive during Vehicle Control Center operating hours; Hill Air Force Base, Roy, UT - North Gate Visitor Center Phone Commercial: (801) 586-7413 / (801) 586-7414 Hours: 0630 - 1530 Mon - Fri (f) Visitors with short term passes (1-60 days) must pick up their pass on the start date or the request becomes invalid (g) Visitors may be disapproved or already approved visitors may be denied access in certain situations, such as real-world FPCON of BRAVO or higher

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS