Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Sutter Pointe Regional Wastewater Conveyance Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sutter Pointe Regional Wastewater Conveyance Project, identified as Permit No. 19804, involves the installation of a 24-inch sanitary sewer force main in Sutter County, California. Located approximately 100 feet north of Riego Road within Reclamation District 1000, the project requires crossing the Natomas East Canal levee and the Natomas East Main Drainage Canal. The infrastructure consists of a 24-inch welded steel pipe for the levee crossing and a 24-inch fusion-welded high-density polyethylene pipe installed within a 42-inch welded steel pipe casing beneath the canal bed, utilizing open-trench excavation methods. The project is governed by several regulatory frameworks, including Fish and Game Code Section 1602 via Streambed Alteration Agreement SUT-58803-R2 executed by the California Department of Fish and Wildlife, and California Code of Regulations Title 23, Article 3, Section 6. Environmental compliance has been established through an Environmental Impact Report and subsequent Notices of Determination issued by the California Department of Fish and Wildlife and the Central Valley Flood Protection Board in September 2025. These determinations confirm that the project will not significantly affect the environment within the jurisdiction of the CDFW, provided that adopted mitigation measures and monitoring plans are implemented.

General Info

Sutter Pointe project installs 24-inch sewer mains crossing Natomas East Canal in California.

Agency

California → Sutter County

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(2)

SUT-58803-R2 Notice of Determination for Lakeside Sewer Pipeline Project

PDFdetermination-and-findings

Notice of Determination for Sutter Pointe Regional Wastewater Conveyance Project Permit No. 19804

PDFdetermination-and-findings

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Sutter County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Sutter County
Office AddressN/A
Contacts
Alexander FunkEnvironmental Scientist

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Streambed Alteration Agreement EPIMS Notification Number SUT-58803-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Lennar Homes of California, Inc. The project is limited to the installation of a pressured 24-inch diameter force main sewer pipeline within the upper portion of the Natomas East Levee and the Natomas East Mian Drainage Canal (NEMDC). The force main sewer pipeline segment will be installed below the existing bed of the NEMDC channel by using open trench methods using standard excavators and heavy equipment.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 7 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as valves, welding, cathodic protection, jack and bore, and precast vaults, as well as civil works including paving, striping, flatwork, fencing, and potholing. Technical services required include videography, testing and inspections, settlement monitoring, survey, and E&IC, alongside compliance tasks such as SWPPP, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, and Veteran-owned businesses, with a strong emphasis on the participation of SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, credit lines, and equipment to encourage diverse subcontracting. Bids for the various project scopes are due by September 23, 2026. Interested parties can obtain plans and specifications through the primary point of contact, Julia Masaitis.
Filanc

POSTED

about 7 hours ago

DEADLINE

in 1 day
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, is a solicitation issued by James W. Fowler Co. on behalf of the Metropolitan Water District of Southern California. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of various contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as tie-ins measuring 54 and 145.5 inches. Additional infrastructure requirements include the construction of four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and piping systems. The project requires specialized civil works, including the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This opportunity is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and women business enterprises. James W. Fowler Co. is actively encouraging M/W/DBE participation and offers assistance with bonding, insurance, and lines of credit to eligible subcontractors. Bids and subcontractor pricing must be submitted by September 29, 2026, with all negotiations finalized 24 hours prior to the bid opening.
James W. Fowler Co.

POSTED

about 7 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS