Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Sutter Pointe Regional Wastewater Conveyance Project

Forecast
Permit No. 19804State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sutter Pointe Regional Wastewater Conveyance Project, identified as Permit No. 19804, involves the installation of a 24-inch sanitary sewer force main in Sutter County, California. Located approximately 100 feet north of Riego Road within Reclamation District 1000, the project requires crossing the Natomas East Canal levee and the Natomas East Main Drainage Canal. The infrastructure consists of a 24-inch welded steel pipe for the levee crossing and a 24-inch fusion-welded high-density polyethylene pipe installed within a 42-inch welded steel pipe casing beneath the canal bed, utilizing open-trench excavation methods. The project is governed by several regulatory frameworks, including Fish and Game Code Section 1602 via Streambed Alteration Agreement SUT-58803-R2 executed by the California Department of Fish and Wildlife, and California Code of Regulations Title 23, Article 3, Section 6. Environmental compliance has been established through an Environmental Impact Report and subsequent Notices of Determination issued by the California Department of Fish and Wildlife and the Central Valley Flood Protection Board in September 2025. These determinations confirm that the project will not significantly affect the environment within the jurisdiction of the CDFW, provided that adopted mitigation measures and monitoring plans are implemented.

General Info

Sutter Pointe project installs 24-inch sewer mains crossing Natomas East Canal in California.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Streambed Alteration Agreement EPIMS Notification Number SUT-58803-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Lennar Homes of California, Inc. The project is limited to the installation of a pressured 24-inch diameter force main sewer pipeline within the upper portion of the Natomas East Levee and the Natomas East Mian Drainage Canal (NEMDC). The force main sewer pipeline segment will be installed below the existing bed of the NEMDC channel by using open trench methods using standard excavators and heavy equipment.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 16 days
View Details

More opportunities from California → Sutter County

Same awarding agency

NAICS: 237210
SLED
Project U25-0012 (Smith)
Solicitation # U25-0012
Project U25-0012 (Smith) involves a Tentative Parcel Map to subdivide a 5.18± acre parcel located at 8388 Marshall Street, Sutter, CA 95982, into two separate lots. The division creates a 1.0± acre parcel, designated as Parcel 1, and a 4.18± acre remainder parcel, designated as Parcel 2. Both parcels front Marshall Street and are situated within the R-1-A Single-Family Residential-Agricultural Combining District. While the existing residence and structures will remain on Parcel 2, Parcel 1 is intended for the future development of a single-family residence utilizing septic and community water connections. The project has undergone a comprehensive environmental review process, including an Initial Study and a Mitigated Negative Declaration, which concluded that the subdivision would not have significant adverse environmental effects provided specific mitigation measures are implemented. Key requirements include the construction of private on-site drainage basins or ditches and a drainage swale at the northeast corner of Parcel 1 to manage stormwater runoff at pre-project levels, with drainage studies prepared by a licensed engineer and approved by the county. The Sutter County Planning Commission officially approved the project on January 21, 2026, and a Notice of Determination was filed on January 22, 2026, certifying compliance with CEQA. Administration of the project is managed by LuisEnrique Hernandez of the Sutter County Development Services Department, with engineering support provided by George Musallam of North Valley Engineering and Surveying.
Land Subdivision

POSTED

10 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS