Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Swinerton Invitation for Prequalification of Qualified Subcontractors and Suppliers: Terrazzo

Active
0000039984State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Swinerton is inviting qualified subcontractors and suppliers to prequalify for participation in the design-build construction of the new Energy and Innovation Building at California State University, Bakersfield, located at 9001 Stockdale Highway. The project involves constructing a approximately 56,500 gross square foot multi-story science building featuring offices, research and teaching laboratories, a capstone design lab, and a flexible event space, along with outdoor collaborative areas. This is a public works project subject to Prevailing Wage requirements and will be executed under a collaborative design-build delivery model. Subcontractors must submit completed Swinerton Prequalification forms and the Swinerton Master Service Agreement by the deadline of August 29, 2026, with prequalification packages due by August 28, 2026. The project has a targeted 6% Disadvantaged Business Enterprise requirement, and the anticipated construction start date is January 1, 2026, with completion expected by June 16, 2027. Interested parties must access and complete submissions through Swinerton’s designated prequalification portal and direct all inquiries to subcontractorprequal@swinerton.com.

General Info

Swinerton seeks qualified subcontractors for CSU Bakersfield’s 56,500 SF design-build energy building with Prevailing Wage, 6% DBE, start Jan 2026.

Agency

California → CSU, BakersfieldView Agency

NAICS

238340 - Tile and Terrazzo ContractorsView NAICS

Place of Performance

Kern, CA, USA

Set-Aside

NONE

Documents

(1)

EIB NTC Terrazzo Subcontractor Prequalification Invitation

PDFsources-sought

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → CSU, Bakersfield
Contacts1 person available
OfficeN/A
Organization / Agency
California → CSU, Bakersfield
View Agency Profile
Office AddressN/A
Contacts
Swinerton Prequalification

Full Description

Show more
SWINERTON INVITATION FOR PREQUALIFICATION Qualified Subcontractors & Suppliers Requested Collaborative Design-Build Agreement for the Energy and Innovation Building CSU Bakersfield Campus 9001 Stockdale Hwy, Bakersfield CA 93311 DUE DATE FOR PREQUALIFIACTIONS: Requesting completed prequalification forms from subcontractors by August 28, 2026 OUTREACH GOALS: 6% DVBE Requirement PROJECT INFORMATION AND DESCRIPTION: The project consists of the design and construction of a new multi-story Science Building of approximately 56,500 GSF. The new Energy Innovation Building will include a combination of offices, research laboratories, teaching labs, a capstone design laboratory, and a versatile flex-design event space. Additionally, the scope encompasses the creation of flexible outdoor spaces that provide dynamic areas for engagement and interaction. This project is a collaborative design-build and falls under Public Works and Prevailing Wage regulations. Deadline for Pre-Qualification packages: 8/28/26 Anticipated Trade Bid Packages Posted date: 8/7/26 Estimated Construction Start Date: 01/01/26 Estimated Construction Completion Date: 06/16/27 DOCUMENTS: https://swinerton.com/subcontractor-prequalification/ TRADES: Terrazzo REQUIRED SUBMITALS: Swinerton Builders Prequalification Swinerton Master Service Agreement (MSA) Interested in prequalifying, please contact the Swinerton Prequalification Team at: subcontractorprequal@swinerton.com

Similar Contracts

Same NAICS industry code

NAICS: 238340
New
SLED
Swimming Stone Brick Paver Replacement
Solicitation # 26-076
The City of Aurora is soliciting bids for the replacement of 1,000 square feet of brick pavers at the Swimming Stones water feature located at 1 W Benton Street, with the work required to be performed exclusively by a Unilock-approved contractor. Bidders must submit proof of Unilock certification with their proposal and adhere strictly to the specified materials, including Unilock IL Campo Black pavers measuring 4 x 8 x 2-3/8 inches for both the outer ring and inner circle. The scope includes removal of existing pavers and barrier curb, installation of a new 6-inch-wide flush barrier curb, application of up to a 3/4-inch layer of leveling sand, and joint filling with engineer-approved nitro joint sand. Bidders must purchase a minimum of 3,000 square feet of pavers to secure reduced unit pricing, with the excess material delivered to the City’s storage facility at 339 Middle Avenue. All work must comply with the City of Aurora General Specifications, Illinois Department of Transportation standards, and Standard Specifications for Water and Sewer Main Construction in Illinois, Seventh Edition. Bidders must demonstrate responsibility by providing evidence of facilities, experience, equipment, personnel, and financial capability to perform the work, with failure to do so resulting in automatic disqualification. The award will be made to the lowest responsive and responsible bidder, with price being a key but not sole evaluation factor; technical adherence, qualifications, performance schedule, quality of workmanship, warranty, and maintenance costs are also considered. The contractor must furnish a 100% Performance and Payment Bond, with coverage extended for a second year via automatic renewal certification, and carries comprehensive insurance including worker’s compensation, general liability ($1M per occurrence/$2M aggregate), auto liability ($1M), and umbrella excess liability ($2M per occurrence/$2M aggregate). Insurance policies must be issued by carriers licensed in Illinois with an A:VII or higher AM Best rating and include 30-day cancellation notice provisions. The project must begin no later than ten calendar days after contract execution, but not before October 15, 2026, with the adjacent waterfront walkway required to be open to pedestrians by October 30, 2026 after 3 PM and fully operational by November 20, 2026. All work is subject to inspection by the City’s Engineer, and materials must conform to ASTM standards if no specific specification is provided. Contractors
Downtown Services

POSTED

about 22 hours ago

DEADLINE

in 19 days
View Details

More opportunities from California → CSU, Bakersfield

Same awarding agency

NAICS: 238990
New
SLED
Outdoor Flexible Engagement Spaces ConstructionThe contract titled Outdoor Flexible Engagement Spaces Construction is a subcontract aimed at developing outdoor hardscaped areas designed to enhance campus engagement through functional and inviting outdoor environments. Work will include the installation of seating areas, shade structures, ambient lighting, and integrated landscaping to create versatile public spaces that encourage social interaction, relaxation, and academic collaboration. The project emphasizes seamless design integration between hardscape elements and natural surroundings, ensuring both aesthetic appeal and long-term durability in Kern County, California. All work must meet specified standards for safety, accessibility, and environmental sustainability. The solicitation was posted on August 6, 2026, with responses due by August 29, 2026, and is governed under NAICS code 238990, which covers other specialty trade contractors. The contract is managed by California State University, Bakersfield, and performance is expected to occur within Kern County. No set-aside type has been designated, indicating the opportunity is open to all qualified subcontractors without restriction based on business size or ownership characteristics. Interested parties should access the official solicitation through the provided CalEProcure link to review detailed specifications, requirements, and submission guidelines.
All Other Specialty Trade Contractors

POSTED

about 18 hours ago

DEADLINE

in 22 days
View Details
NAICS: 238210
SLED
Electrical Installation and Medium-Voltage WorkThe contract involves the installation of solar photovoltaic arrays, battery energy storage systems, switchgear, and medium-voltage systems operating at 12 kV or higher, all requiring full compliance with Pacific Gas and Electric Company interconnection standards. The work is scoped for a subcontract under California State University, Bakersfield, with performance required in Kern County, California. The project demands specialized expertise in medium-voltage electrical systems and grid integration procedures to ensure safe, reliable, and code-compliant operations. All components must be designed, installed, and commissioned in alignment with utility requirements and industry best practices for renewable energy systems. Bidders must respond by September 16, 2026, and the solicitation is classified under NAICS code 238210 for electrical contractors. The work will involve coordination with local infrastructure, utility interfaces, and regulatory compliance frameworks specific to PG&E’s grid connection protocols. No set-aside specifications or organizational type restrictions are listed, indicating open competition among qualified electrical subcontractors with demonstrated experience in renewable energy infrastructure and medium-voltage installations. The contract does not specify a point of contact, and the posting is available through the California eProcurement portal for further details.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

23 days ago

DEADLINE

in about 1 month
View Details
NAICS: 541330
SLED
Solar Photovoltaic (PV) System Design and EngineeringThe contract entails the comprehensive engineering design of a solar photovoltaic (PV) system, covering structural, electrical, and layout planning to ensure full compliance with PG&E interconnection standards and the National Electrical Code (NEC). The scope requires detailed technical planning to integrate the PV array safely and efficiently into the existing infrastructure, with all designs meeting regulatory and utility requirements for grid compatibility, load management, and safety protocols. The work must be executed with precision to support the successful permitting, installation, and operational readiness of the solar system at the designated location in Kern County, California. This subcontract is issued by California State University, Bakersfield, under NAICS code 541330 for engineering services, with a response deadline of September 16, 2026. The solicitation was posted on July 16, 2026, and is open for proposals through the CalEProcure platform. Although no set-aside classification or specific point of contact is provided, the project is positioned as a specialized engineering effort requiring expertise in renewable energy systems and utility interconnection practices. All deliverables must align with the technical and regulatory frameworks mandated by PG&E and NEC standards to ensure seamless deployment and long-term system reliability.
Engineering Services

POSTED

23 days ago

DEADLINE

in about 1 month
View Details
NAICS: 221114
SLED
CSUB Solar & Battery Advanced Shovel-Ready SLPPA
Solicitation # 0000039798
The California State University, Bakersfield is soliciting proposals for a 20-year Site License Power Purchase Agreement (SLPPA) to finance, construct, own, operate, maintain, and ultimately remove or transfer a solar photovoltaic system with an integrated battery energy storage system (BESS) on its campus. The project is designated as advanced shovel-ready, with a Notice to Proceed scheduled for late November 2026 and a firm deadline for commercial operation and Permission to Operate set for December 1, 2027. Proposals must be submitted in sealed packages to the campus procurement office by September 16, 2026, and are evaluated using a best-value trade-off approach prioritizing both technical merit and lifecycle cost, with the 20-year Levelized Cost of Energy (LCOE) carrying the single largest weight at 320 out of 1,000 total evaluation points. The SLPPA provider must demonstrate proven experience in medium-voltage electrical work at 12 kV or above, intentional islanding capability, and successful integration of BESS with microgrid controls and non-export protection systems. Licensing is strictly enforced: the primary contractor must hold active, current Class A and C-10 California contractor licenses—no substitutions permitted—and must be registered with the California Department of Industrial Relations, maintain prevailing wage compliance, and carry workers’ compensation insurance. The system must deliver a minimum of 7,675,565 kWh in Year 1 with no more than 0.50% annual degradation, achieve system availability of at least 98%, and pass comprehensive commissioning and acceptance testing verified by PG&E and local authorities. All deliverables—including as-built drawings, O&M manuals, warranties, training documentation, and lien releases—are required upon project closeout. Offerors must also submit certifications for Small Business Enterprise and Disabled Veteran Business Enterprise status if applicable, along with non-collusion and conflict-of-interest affidavits, and comply with California’s CEQA and public contract codes. The project’s bundled advancement and procurement cost is capped at $5,745,215.92, though the long-term PPA rate per kWh remains unspecified. Failure to meet any mandatory qualification, submit required documentation, or adhere to formatting and submission rules will result in automatic disqualification. The proposal must be organized into 15 carefully defined tabs with strict page limits to ensure equitable evaluation.
Solar Electric Power Generation

POSTED

23 days ago

DEADLINE

in about 1 month
View Details