Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on May 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SWITCH, AIR 12 KV LOAD BRK HRZ, HOOKSTICK CONTROL #02371

Closed
MS 05-26-05State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 335313
New
SLED
JD Cope / DC UPS System
Solicitation # PE-75553-NONST-2027-000000066
Dalton Utilities is soliciting bids for the engineering, manufacture, testing, documentation, delivery, and field services of a complete DC/UPS system for the J.D. Cope Energy Facility in Georgia. The scope of work includes the design and fabrication of a 125 VDC station battery with racks and spill containment, a NERC PRC-005-06 compliant battery monitoring system, redundant paralleling battery chargers, an inverter with a static transfer switch, a manual bypass switch, and an isolation transformer/voltage regulator. Additionally, the project requires a 125 VDC nominal switchboard and various 120VAC and 125 VDC panelboards. The system must adhere to IEEE 450, OSHA, and International Building Code standards. The contract is a Delivered Duty Paid (DDP) agreement with the point of delivery located at 1232 V.D. Parrot Jr Pkwy, Dalton, GA. Bids must be submitted to David Keaton by the deadline of November 11, 2026. Selected suppliers will be responsible for providing a detailed manufacturing and delivery schedule, as well as comprehensive equipment data books and submittals via the Hexagon SDx system. Quality assurance involves a mandatory Inspection and Test Plan, with the possibility of source inspection shop visits by the Engineer. Final acceptance is contingent upon successful post-installation acceptance testing. All submittals must be provided in native Adobe PDF format, and scanned documents are not acceptable.
Dalton Utilities

POSTED

about 6 hours ago

DEADLINE

in 14 days
NAICS: 335313
New
SLED
JD Cope / 480V Low Voltage Motor Control Centers
Solicitation # 5.5330
Dalton Utilities is soliciting firm bids for the engineering, manufacture, testing, documentation, delivery, and field services for seven indoor 480V motor control centers to be installed at the J.D. Cope Energy Facility in Georgia. The project is part of a new electrical power generation plant utilizing three 18.522MW reciprocating engines. The selected supplier must design, fabricate, and deliver the equipment DDP to the point of delivery in Chatsworth, Georgia. All equipment must comply with UL 845, NEMA ICS 1, ICS 2, and NEMA 1 standards, as well as the National Electric Code, OSHA, and International Building Code. Additionally, materials cannot be procured from China or India, and designs must have a proven domestic service history of at least three years. The contract requires comprehensive documentation, including submittals via the Hexagon SDx project website and the provision of spare parts, tools, and consumables for the first two years of operation. Quality assurance involves potential source inspections at the supplier's facility, with a five-day notice required for hold or witness points. Delivery schedules must be agreed upon within 30 days of the effective date, with specific notification timelines for shipping plans and material lists. Bids must be submitted electronically to David Keaton by the deadline of November 11, 2026.
Dalton Utilities

POSTED

about 6 hours ago

DEADLINE

in 14 days
NAICS: 335313
New
DIBBS
FUSE BOX
Solicitation # SPE7M2-27-T-0421
Solicitation SPE7M2-27-T-0421 is a small business set-aside issued by the DLA Weapons Support Nuclear Reactor Program for the procurement of fuse boxes, identified as critical application items. The requirement consists of multiple line items, including 6 units of NSN 5920001781606 and 22 units of the same material, with a total quantity of 28 units. The items must be manufactured in accordance with TDP Rev A Gen 1 and specifications MIL-DTL-24646/1C(1) and MIL-DTL-24646C(1) SUP 1. A First Article Test (FAT) requirement is mandatory for one unit, and the contractor must provide written notice to the Contracting Officer and Quality Assurance Representative at least 14 calendar days prior to shipment for this testing. Delivery is set for 272 days after award, with required ship dates in April 2027 and final delivery dates in July 2027. Shipments are directed to DLA Distribution centers in Bremerton, Washington, and Tracy, California, with FOB and inspection/acceptance points set at the origin. Packaging and marking must strictly adhere to MIL-STD-2073-1E, MIL-STD-129, and RP001, with a strict prohibition on the use of mercury or mercury compounds in preservation and packaging. The contract incorporates various FAR and DFARS clauses, including the Buy American Act, NIST SP 800-171 assessment requirements, and a price evaluation preference for HUBZone small business concerns.
DLA WEAPONS SUPPORT NUCLEAR REACTOR PROGRAM

POSTED

about 10 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The contract solicitation titled "SWITCH, AIR 12 KV LOAD BRK HRZ, HOOKSTICK CONTROL #02371" requires bidders to submit their responses exclusively through the OpenGov system by the deadline of June 17, 2026, at 7:00 PM, with no email submissions accepted. Bidders are responsible for regularly checking the bid portal for any addenda even after submission, as failure to acknowledge all addenda could result in disqualification. Quotes must be based on a net delivered price with terms FOB Alameda, CA, including all handling, transportation, and applicable taxes except sales tax. Bidders must also specify their after receipt of order (ARO) lead time in weeks, which may influence the evaluation alongside price. Any procurement exceeding $25,000 requires approval by the City of Alameda’s Public Utilities Board at a monthly meeting. The contract is managed by the Support Services agency in California, with the point of contact being Ikue Suto-McNiff, the Procurement Analyst. The solicitation was posted on May 29, 2026, and pertains to a specific switching equipment for air 12 kV load break horizontal hookstick control. The procurement process emphasizes compliance with submission protocols and adherence to pricing, delivery, and administrative approval requirements.

General Info

Bids for 12 kV switch due June 17, 2026, via OpenGov; FOB Alameda, price and lead time required.

Documents

3

Drawing 1-L-497A Air Switch Load Break 900A 25KV

PDF, High priority: read this firstspecifications
High

Notice of Request for Quotations MS 05-26-05 for 12 KV Load Break Switch

DOC, High priority: read this firstrfq
High

RFQ MS 05-26-05 for SWITCH, AIR 12 KV LOAD BRK HRZ, HOOKSTICK CONTROL #02371

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Support Services
Contacts1 person available
OfficeAlameda, CA, 94501, USA
Organization / AgencyCalifornia → Support Services
Office AddressAlameda, CA, 94501, USA
Contacts
Ikue Suto-McNiffProcurement Analyst

Interested Companies (9)

One Source Supply SolutionsSan Diego, CA
Mader SupplyNorth Highlands, CA

See All 9 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
It is the bidder's responsibility to have their responses entered into the OpenGov system before the appointed due date and time. Email submittals shall not be accepted. It is also the responsibility of the bidder to visit the bid portal to see if there is any addendum even after they submitted their quotes. Failure to review and acknowledge all addenda might lead to disqualification to the bid. Line 1 - Quote based on the net delivered price (Free on board or FOB Alameda CA) with all handling & transportation charges prepaid and include all local, state, and federal taxes but do not include sales tax. ARO (After receipt of order) lead time in weeks to be filled by a bidder located in the pricing table. Lead time may be considered in evaluation in addition to quoted pricing. Purchases of materials in excess of $25,000 must receive the City of Alameda's Public Utilities Board (PUB) approval at a PUB monthly meeting.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS