This Sources Sought opportunity from Department Of Defense was posted on May 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Switchboard and Motor Control Center (MCC) Panel Replacement Service

Closed
W91QF526QA004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Department of Defense is conducting a Sources Sought Notice to identify qualified contractors capable of providing removal, installation, and integration services for switchboards and Motor Control Center (MCC) panels at the ALTESS Data Center located within the Radford Army Ammunition Plant in Radford, Virginia. This notice is for market research purposes only and not a solicitation for bids or proposals. The project involves replacing existing Westinghouse and GE fused switchboards and MCC panels in two separate rooms (RM 119 and RM 241) with customized Eaton (or equivalent) equipment. The contractor is responsible for carefully removing the old equipment, maintaining the operation of critical systems such as hot water pumps, sewer ejection compressors, and lighting feeds, and reinstalling all control wiring and monitoring system components that support the Trane Building Automation System (BAS) and Schneider Electric StruxureWare. All work affecting power feeds to lighting panels will be required to occur after hours or on weekends to prevent downtime during facility operations. The contractor must also conduct comprehensive arc flash, short circuit, and coordination studies for the entire facility, including the new equipment, and handle proper disposal of all removed components at approved locations. The anticipated contract performance period runs from July 2026 through June 2027. Interested firms, including small and socio-economically qualified businesses, are invited to submit capability statements that demonstrate their ability to meet technical requirements, provide certified Trane Authorized Controls technicians for BAS integration and functional testing, comply with security requirements at the facility, and conduct after-hours work as needed. Responses should be concise, submitted in PDF or Word format, and not exceed ten pages. The submission deadline is May 21, 2026, with communications directed to designated contracting personnel at the Fort Lee office. The Government will use received information solely for acquisition planning and strategy development.

General Info

DoD seeks contractors for switchboard/MCC removal, installation, studies, after-hours work, July 2026–June 2027.

Agency

Department Of Defense → W6QM Micc Ft Lee

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

Radford, VA, 24141, USA

Set-Aside

NONE

Documents

(2)

SOW Rev3 - Switchboard and MCC Panel Replacement Service

DOCXsow

Sources Sought Notice for Switchboard and MCC Panel Replacement Service at ALTESS Data Center

DOCXsources-sought

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QM Micc Ft Lee
Contacts2 people available
OfficeFORT LEE, VA, 23801, USA
Organization / Agency
Department Of Defense → W6QM Micc Ft Lee
Office AddressFORT LEE, VA, 23801, USA
Contacts
Ryan Lancaster
Heather B. Jarratt

Full Description

Show more

SOURCES SOUGHT NOTICE


Notice Type: Sources Sought / Request for Information (RFI)
Title: Switchboard and Motor Control Center (MCC) Panel Replacement Service
Location: ALTESS Data Center, Radford Army Ammunition Plant, Radford, VA


1.0 Introduction and Purpose


This is a Sources Sought Notice issued for market research and planning purposes only. This is NOT a solicitation, Request for Proposal (RFP), Request for Quotation (RFQ), or Invitation for Bid (IFB). It does not constitute a commitment by the Government to issue a contract, nor will the Government pay for any information submitted in response to this notice.


The purpose of this Sources Sought is to identify qualified and capable sources (including Small Businesses, 8(a), Service-Disabled Veteran-Owned, HUBZone, and Women-Owned Small Businesses) that can provide the required removal, installation, and integration services for switchboards and Motor Control Center (MCC) panels at the ALTESS data center.


2.0 Background and Scope Summary


The Contractor shall provide removal of one (1) Westinghouse switchboard and Motor Control Center (MCC) panel located in RM 241, and one (1) GE switchboard to include associated Motor Control Center (MCC) panel located in RM 119, and provide customized installation of one (1) Eaton (or equal) switchboard and Motor Control Center (MCC) panel located in RM 241, and one (1) Eaton (or equal) switchboard and Motor Control Center (MCC) panel located in RM 119 located within the ALTESS data center located on site in Radford, VA 24141-1061.


Specific Tasks:
 


  • GE Fused Switchboard and Motor Control Center (MCC): GE fused switchboard and motor control center (MCC) panel replacement service shall include:            

Room 119 Equipment Removal & Installation Services:


  • Removal of existing GE Fused Switchboard and MCC panel and all associated components.
  • Disconnect two (2) hot water pumps from GE MCC during removal.
  • Hot water pumps must be temporally powered via alternate source until new MCC panel is operational. Hot water pumps will be reconnected to new MCC and functionally tested.
  • Enclosed starters must be provided (if applicable)
  • Removal of all feeder circuits from GE switchboard to GE MCC.
  • Through circuits identified during demolition shall be rerouted to maintain operation of assigned equipment.
  • One (1) circuit passes through to feed the Air Handler Unit (AHU) -1, and its associated CTs and Trane controls integration components shall be moved.
  • All old unused control circuits within MCC shall be removed back to their origination points.
  • Identified control circuits will be going to the existing Powers Controls hand-off-auto (HOA) board in RM 119.
  • All controls wiring, current transformers (CTs), and components supporting Trane Building Automation System (BAS) and/or Schneider Electric StruxureWare monitoring systems shall be kept intact and reinstalled into new MCC panel.
    • All work tied to the BAS system shall only be verified and recommissioned by a certified Trane Authorized Controls technician to include full functional testing.
    • All Schneider Electric StruxureWare monitoring systems metering components shall be verified and functional tested prior to project completed and installation of new MCC.
  • Removal of all HOAs from the Powers Controls HOA board in RM 119.
  • Installation of a one (1) new customized Eaton (or equal) Switchboard and MCC Panels
  • Install new HOAs into new MCC doors of associated buckets.
  • Installation of a new MCC panel.
    • Panel to include sufficient amount of motor starter buckets (approximately 11 current active).
      • Panel to supply all current loads, and additional feeder buckets to refeed six (6) existing lighting panel feeds from the GE Switchboard (five (5) existing 200A feeds and one (1) existing 100A feed), and provisional spots for future equipment.
  • Refeed new MCC overhead from 800A breaker to existing 208v Square-D panel in RM 119.
  • Disconnect and reroute six (6) existing lighting panel feeds using the GE switchboard as a junction box to reconnect to new MCC panel.
    • Upon reconnection, old GE switchboard shall be covered by sheet metal.
      • All work and repowering the six (6) existing panels from the new MCC shall be done after hours, on weekends when the facility is not occupied.

Westinghouse Fused Switchboard and Motor Control Center (MCC): Westinghouse fused switchboard and motor control center (MCC) panel replacement service shall include:       


Room 241 Equipment Removal & Installation Services:


  • Removal of existing Westinghouse Fused Switchboard and MCC panel and all associated components.
  • Disconnect two (2) hot water pumps and two (2) existing sewer ejection compressors from existing Westinghouse fused switchboard MCC panel during removal.
    • Hot water pumps and sewer ejection compressors must be temporally powered via alternate source until new MCC panel is operational. Hot water pumps will be reconnected to new MCC and functionally tested.
      • Enclosed starters must be provided (if applicable)
  • Removal of all feeder circuits between the Westinghouse switchboard and MCC.
  • Through circuits identified during demolition shall be rerouted to maintain operation of assigned equipment.
  • All controls wiring, CTs, and components supporting Trane Building Automation System (BAS) and/or Schneider Electric StruxureWare monitoring systems shall be kept intact and reinstalled into new MCC panel.
    • All work tied to the BAS system shall only be verified and recommissioned by a certified Trane Authorized Controls technician to include full functional testing.
    • All Schneider Electric StruxureWare monitoring systems metering components shall be verified and functional tested prior to project completed and installation of new MCC.
      • Most HOAs controlling equipment within the MCC tie back to Johnson Control HOAs in RM 241.
  • Installation of one (1) new customized Eaton (or equal) Switchboard and MCC Panels
  • Installation of a new MCC panel.
    • Panel to include sufficient amount of motor starter buckets (approximately fourteen (14) current active).
      • Panel to supply all current loads, and additional feeder buckets to refeed four (4) existing lighting panel feeds and Johnson Control Panel feed from Westinghouse Switchboard (four (4) existing 200A feeds and one (1) existing 50A feed), and two (2) provisional spots for future equipment.
  • All HOAs shall remain in Johnson Controls HOA panel in RM 241 and wired back to the associated equipment MCC buckets that currently exist.
    • All controls and wiring associated with the Trane Building Automation System (BAS) shall be kept intact and reinstalled into the new MCC panel.  All related work shall only be verified and recommissioned by a certified Trane Authorized Controls technician to include full functional testing upon completion of service.
  • Refeed new MCC overhead from 800A breaker to existing 208v Square-D panel in RM 119.
  • Disconnect and reroute four (4) existing lighting panel feeds from the Westinghouse Switchboard (four (4) existing 200A feeds) with the feeder buckets into the new MCC. 
    • Upon reconnection, old Westinghouse switchboard shall be removed and properly disposed of.
      • All work and repowering the four (4) existing panels from the new MCC shall be done afterhours, on weekends when the facility is not occupied.
  • Contractor shall provide arc flash, short circuit, and coordination study for the entire ALTESS facility including new equipment provided within this service.
  • Disposal: All GE and Westinghouse fused switchboards, panels, wiring, and harnesses to include any associated debris and parts shall be removed and disposed of at an and approved offsite federal, state, and local disposal site by contractor.
  • Anticipated Period of Performance: July 1, 2026 – June 30, 2027.

3.0 Requested Capability Statement


Interested parties are requested to submit a Capability Statement demonstrating their ability to perform the services described in the SOW. Please provide the following information structured in your response:


Requirement Category


Specific Information Requested


Company Profile


Company Name, Address, CAGE Code, and Unique Entity ID (UEI).


Point of Contact


Name, Title, Phone Number, and Email Address of the primary representative.


Business Size & Socio-Economic Status


Specify your business size under the applicable NAICS code (238210 - Electrical Contractors) and any applicable socio-economic categories (e.g., 8(a), SDVOSB, WOSB, HUBZone).


Technical Capability


Detailed narrative demonstrating the capability to provide, install, and customize Eaton (or equal) switchboards/MCCs. Must explicitly address the ability to provide a certified Trane Authorized Controls technician and integrate with Schneider Electric StruxureWare.


Logistics & Security


Statement of ability to conduct required after-hours/weekend repowering work and comply with Radford Army Ammunition Plant (RFAAP) security and background check requirements.


Past Performance


Briefly describe up to three (3) similar projects completed within the last five (5) years involving data center power infrastructure replacement, BAS integration, and secure facility operations.


4.0 Submission Instructions


Responses should be concise and focused on the capability to meet the Government's requirements.


Submission Detail


Instruction


Page Limit


Maximum of ten (10) pages.


Document Format


PDF or Microsoft Word format.


Submission Email


KO heather.b.jarratt.civ@army.mil, CS kenneth.r.lancaster11.civ@army.mil, and CC: sharon.e.bane.civ@army.mil (COR)


Response Deadline


Thursday, May 21, 2026 at 12:00 PM EST


Subject Line


Sources Sought Response: ALTESS Switchboard & MCC Replacement



Disclaimer: Information received in response to this notice will be used solely for market research and acquisition strategy planning. Proprietary information, if any, should be minimized and MUST BE CLEARLY MARKED. To aid the Government, please segregate proprietary information