Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Arizona was posted on February 21, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Switzer Canyon FUTS Trail

Closed
2024-83State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between $80,000,000 and $100,000,000, with a solicitation expected around March 15, 2027. Construction is scheduled to begin in September 2027 and last approximately two years, spanning two dredging seasons from September 1, 2027, to August 31, 2029. The work is divided into two primary sequences: the construction of a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, including an access channel, and the subsequent maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth. The total scope involves mechanically dredging approximately 5,500,000 cubic yards of material using closed clamshell buckets. Specifically, 3,200,000 cubic yards will be removed to create the CAD cell, with material placed at Port Edgewood Basin, Fox Point Reach CAD cells, Prudence Island, and the Rhode Island Sound Disposal Site. The remaining 2,300,000 cubic yards of maintenance material will be placed within the newly constructed Edgewood Shoals North CAD cell. To meet strict environmental windows and project timelines, the contractor must maintain a production rate of at least 300,000 cubic yards every 30 calendar days, operating 24 hours a day, 7 days a week. Interested firms must submit a capabilities package by November 26, 2026, demonstrating experience with these production rates and open water placement in New England during winter months.
W2SD Endist New England

POSTED

about 3 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The City of Flagstaff is soliciting bids for the construction of the Switzer Canyon FUTS trail, a non-vehicular multi-use path approximately three-quarters of a mile in length. The trail will primarily feature an aggregate surface, with concrete utilized in steeper sections, and will extend from the eastern terminus of Terrace Avenue to the intersection of Switzer Canyon Drive. This project aims to establish a vital connector for pedestrians and bicyclists traveling between downtown Flagstaff and various recreational destinations, including McMillan Mesa, Buffalo Park, and the Arizona Trail. Beyond improving accessibility and utilizing a FUTS easement through private land, the project is designed to mitigate environmental issues by concentrating social trails and assisting in the cleanup of areas prone to illegal dumping, littering, and transient camping. The contract will be awarded to the lowest responsive and responsible bidder. Interested parties should note that the solicitation was posted on February 21, 2024, with a response deadline of March 12, 2024.

General Info

City of Flagstaff seeks bids for Switzer Canyon multi-use trail construction project.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Mar 15, 2024 to Mar 12, 2024.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyArizona → City of Flagstaff
Contacts1 person available
OfficeN/A
Organization / AgencyArizona → City of Flagstaff
Office AddressN/A

Full Description

Show more
This project will construct the Switzer Canyon FUTS trail. The trail will be approximately ¾ mile inlength and will be an aggregate-surfaced, non-vehicular, multi-use trail. Some sections of trail will be concrete due to steeper grades. The trail will start on the west end at the eastern terminus of Terrace Avenue to the intersection of Switzer Canyon Drive on the eastern end. This trail will provide a key connector route to and from downtown Flagstaff for pedestrians and bicyclists traveling to McMillan Mesa, Buffalo Park, USFS Trails, and the Arizona Trail on the north side of Flagstaff. It will create access to City of Flagstaff Open Space along the south side of the mesa and utilize a FUTS easement through private land on the eastern slope of the mesa. The trail will help to concentrate social trails in the area and aid in cleanup efforts in an area which sees sizable littering, transient camping, and illegal dumping.The Contract will be awarded to the lowest responsible Bidder whose bid is responsive to this Invitation for Bids and will be most advantageous to the Owner.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS