Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Homeland Security was posted on February 21, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Synopsis Solicitation Sewage and Grey water clean and inspect for the USCGC Margaret Norvell

Awarded
52050PR230000021Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562998
New
SLED
C5613678-D, Concrete and Asphalt Crushing Services
Solicitation # C5613678-D
Solicitation C5613678-D is an Invitation for Bid for the California Department of Corrections and Rehabilitation to obtain concrete and asphalt crushing services for the Correctional Construction Mentorship Program at the Richard J. Donovan Correctional Facility in San Diego. The contractor is responsible for providing all labor, materials, equipment, and transportation necessary to perform concrete crushing, including options for rebar, and asphalt grinding on an as-needed basis. The contract is estimated at 250,000 dollars, with a performance period starting January 1, 2027, and ending December 31, 2029. Award is based on the lowest price, determined by the sum of item totals on the rate sheet, with specific incentives available for certified Disabled Veteran Business Enterprises and Small/Micro businesses. The contractor must adhere to strict compliance standards, including Cal/OSHA regulations for bloodborne pathogens and aerosol transmissible diseases, the Americans with Disabilities Act, and nondiscrimination program requirements. Payment is governed by Government Code Chapter 4.5, and invoices must be accompanied by required service reports to avoid disputes. Bidders are required to submit a comprehensive package in PDF format, including a GenAI disclosure and specific certifications. The agreement is contingent upon the state's acceptance of required insurance, bonds, and licenses, and the contractor must provide a remittance address via form STD 205 if it differs from their mailing address.
California Department of Corrections & Rehabilitation

POSTED

about 21 hours ago

DEADLINE

in about 1 month
NAICS: 562998
New
Federal
Spill Response Services
Solicitation # N4008426Q1014
Solicitation N4008426Q1014 is a request for quotes for a performance-based Indefinite-Delivery/Indefinite-Quantity (IDIQ) contract to provide rapid spill response and prevention services across various U.S. Navy, Marine Corps, Army, and Air Force bases and facilities throughout mainland Japan and Okinawa. The scope of work includes the containment, cleanup, and mitigation of oil and hazardous substance spills on land and in surrounding waters up to 12 nautical miles, subdivided into seven primary support zones. The contract structure consists of a 12-month base period followed by seven 12-month option periods, utilizing fixed-price task orders for both recurring and non-recurring work. The contractor is responsible for providing all necessary labor, management, equipment, and Government of Japan approved dispersants. The government will evaluate proposals based on a best-value determination, considering price and other factors. Key evaluation criteria include demonstrated experience in oil and hazardous substance spill response, containment, cleanup, disposal, and environmental sampling, as well as past performance verified through CPARS or Past Performance Questionnaires. Pricing may be submitted in U.S. Dollars or Japanese Yen, with a specific conversion rate applied for evaluation consistency. Administrative requirements include registration in the System for Award Management, submission of quotes via the PIEE Solicitation Module by November 4, 2026, and invoicing through the Wide Area Workflow system. Compliance with host nation laws, cybersecurity standards, and environmental protections for endangered species is mandatory.
Navfacsyscom Far East

POSTED

1 day ago

DEADLINE

in 14 days
NAICS: 562998
New
Federal
JBMHH Stormwater Management Facility Maintenance and Repair Services
Solicitation # W91QV127PA997
The Mission and Installation Contracting Command Fort Belvoir is seeking a contractor to provide non-personal annual Best Management Practice maintenance for 58 Stormwater Management Facilities located at Joint Base Myer-Henderson Hall in Arlington, Virginia, and Fort McNair in Washington, D.C. This effort, classified under NAICS 562998 and set aside for the SBA 8(a) Business Development program, involves a one-time annual maintenance event scheduled for early spring or early summer. The scope includes routine and corrective maintenance for various aboveground and underground facilities, such as bioretention areas, permeable pavements, rain gardens, and underground vaults, requiring the use of specialized equipment like vacuum trucks. The contract follows a performance period consisting of a base year from June 30, 2027, to June 29, 2028, with four subsequent option years and a final partial period ending December 29, 2032. Key requirements include the submission of a Quality Control Plan, a proposed activity schedule, and a 48-hour advance notification to the Activity POC before starting work on any facility. The contractor must provide weekly oversight and ensure 100 percent compliance with manufacturer or designer specifications. Final acceptance of work is contingent upon Government review and approval, with invoicing processed via WAWF accompanied by a Detailed Monthly Status Report.
W6QM Micc-Ft Belvoir

POSTED

5 days ago

DEADLINE

in 17 days
NAICS: 562998
Federal
Maintenance and Repairs of Aboveground Storage Tanks (AST) and Underground Storage Tanks (UST) at the Naval Station Newport; Naval Undersea Warfare Center, Newport Rhode Island and Other Areas of Responsibility (AOR)
Solicitation # N4008527R0002
This is a Competitive Full and Open/Unrestricted procurement for a performance-based Facility Support contract to provide maintenance and repairs for Aboveground Storage Tanks (AST) and Underground Storage Tanks (UST) at the Naval Station Newport and Naval Undersea Warfare Center in Newport, Rhode Island. The contract is structured as a Firm Fixed Price (FFP) and Indefinite Delivery/Indefinite Quantity (IDIQ) vehicle encompassing both recurring and non-recurring services. The scope of work includes the maintenance of leak detection systems, execution of emergency, urgent, and routine work, implementation of the Integrated Maintenance Program and AST/UST Inspection and Maintenance Program, and hazardous waste disposal. The period of performance consists of a base period with four twelve-month option periods, not to exceed a cumulative total of sixty months. Award will be determined using a Tradeoff analysis in accordance with FAR Part 15, evaluating price against four non-price factors: Technical/Approach Management, Corporate Experience, Safety, and Past Performance. Technical factors and past performance combined are approximately equal in importance to price. To qualify for corporate experience and past performance, offerors must demonstrate a history of managing similar projects with a yearly value of at least $200,000.00 and the ability to handle simultaneous requirements for multiple customers. The procurement falls under NAICS code 562998 with a size standard of $16.5 million. Administrative requirements include active SAM registration, the use of FedMall for non-recurring ordering, and the acceptance of Government Purchase Credit Cards.
Navfacsyscom Mid-Atlantic

POSTED

7 days ago

DEADLINE

in 9 days
NAICS: 562998
Federal
J045--FY 27 Grease Trap and Lift Station Maintenance
Solicitation # 36C24827Q0043
The Department of Veterans Affairs, Network Contracting Office 8, is soliciting quotes for a firm fixed price contract to provide grease trap and lift station maintenance at the C.W. Bill Young VA Medical Center in Bay Pines, Florida. The scope of work requires the contractor to provide all personnel and equipment to remove grease, garbage, and sewage from seven grease traps and six sewage lift stations. Services include a recurring schedule of monthly, quarterly, and semi-annual maintenance, as well as on-call emergency removals across the entire campus. Contractor vehicles must be capable of pumping from distances between 10 and 100 feet. The period of performance consists of a base year ending September 30, 2027, with four subsequent one-year option periods extending through September 30, 2031. This procurement is a total small business set-aside, specifically designated for HUBZone small businesses, under NAICS code 562998. Interested vendors must be registered in the System for Award Management and the SBA Small Business Search. Quotes are due by October 23, 2026, and must include the Unique Entity Identifier, SDVOSB certification via the Dynamic Small Business Search, and a past performance record. Award will be based on the most advantageous offer considering price and other factors. The contract includes strict requirements for protecting sensitive VA information, compliance with federal safety standards, and prohibitions on specific foreign telecommunications equipment. Performance will be monitored by a Contracting Officer's Representative through a Quality Assurance Surveillance Plan.
248-NETWORK Contract Office 8 (36C248)

POSTED

7 days ago

DEADLINE

in 3 days

AI Contract Overview

Show more

Solicitation 52050PR230000021 is a fixed-price, small business set-aside contract for the cleaning and inspection of the sewage and grey water systems aboard the USCGC Margaret Norvell (WPC-154) at Coast Guard Base Miami Beach. The scope of work requires the contractor to remove all obstructions, clogs, and waste build-up from tanks, piping, and related components using a combination of biodegradable chemical descalers and mechanical methods such as waterjetting or pressure washing. Key deliverables include a detailed cleaning plan, the submission of Condition Inspection Reports, and the replacement of worn zinc anodes using government-furnished property. The contract will be awarded based on best value, evaluating cost and past performance. The selected vendor must provide a full price breakdown of labor, materials, and equipment. Following the cleaning process, the contractor is required to perform rigorous operational tests, including borescope inspections and vacuum leak tests, to ensure system integrity. All work must be performed in accordance with Federal Acquisition Regulation (FAR) and Homeland Security Acquisition Regulations (HSAR), with strict adherence to base security protocols, including citizenship requirements and environmental regulations for waste disposal.

General Info

Contract Value

$29,492

NAICS

562998 - All Other Miscellaneous Waste Management Services

Place of Performance

45025, FL, 33139, USA

Set-Aside

SBA

Award Issued Date

Documents

4

Grey Water System Diagram

PDF, High priority: read this firstspecifications
High

Solicitation 52050PR230000021 - USCGC Margaret Norvell Sewage and Grey Water System Cleaning

PDF, High priority: read this firstrfq
High

USCGC MARGARET NORVELL (WPC-154) Work Item 7: Sewage and Grey Water System Cleaning

PDF, High priority: read this firstsow
High

USCG Sewage System Diagram

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice title changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Base MIAMI(00028)
Contacts2 people available
OfficeMIAMI, FL, 33132, USA
Office AddressMIAMI, FL, 33132, USA

Full Description

Show more
This combined synopsis/solicitation for construction services prepared in accordance with the format in subpart 12.6 of the Federal Acquisition Regulation (FAR) as supplemented with additional information included in this notice. This synopsis/solicitation is being advertised as Small Business Set-Aside only. This announcement constitutes the only solicitation; no separate written solicitation will be issued. The solicitation number is 52050PR230000021 Applicable North American Industry Classification Standard (NAICS) codes are: 562998 562998 All other miscellaneous waste management services, Size standard in Millions ($7.0) This requirement is for a fixed price contract. The contract will be awarded using simplified acquisition procedures in accordance with FAR part 13 and part 15 The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, Best Value. When submitting your proposals, request a price breakdown of the following: a. Cost of materials and equipment b. Cost of labor Contract will be awarded to the vendor who can provide Best value which includes all labor, material, cost and equipment required within the SOW. Cost and Past Performance factors will also be considered when selecting the award. Anticipated award date: 5 business days after close of solicitation, OOA 03 Feb 2023 Quotes are to be received no later than close of business (3 p.m.) on Friday 27 Jan 2023 and are to be sent via e-mail to Mehdi.Bouayad@uscg.mil Quotations sent via the US Postal Service or hand delivered should be sent to: Commanding Officer USCG Base Miami Beach (P&C) Attn: Mehdi Bouayad 909 SE 1st Ave, Room 512 Miami, FL 33131. Telephone requests of quotes, will NOT be accepted, a formal notice of changes (if applicable) will be issued in SAM.GOV (SAM.gov | Home). Wage determinations: FL2015-4543 REV 23 dated 12/27/2022 . SCOPE 1.1 Intent. This work item describes the requirements for the Contractor to clean the sewage and grey water system (e.g. tanks, piping, etc.). TABLE 1 USE OF COAST GUARD SEWAGE AND GREY WATER DISPOSAL FACILITIES (PARA 3.3.5.2) YES 1.2 Government-furnished property. MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED COST ($/UNIT) N **Sewage Tank Zinc Anode NIIN: 014474686 2 142.19 *Government-loaned property, which must be returned to the vessel upon completion of the availability. **New or refurbished equipment that the Government may provide for installation in place of existing equipment. ***Government-furnished property, which is to be supplied by either the vessel or the C4IT Service Center. 2. REFERENCES COAST GUARD DRAWINGS Coast Guard Drawing 154 WPC 127-302, Rev C, Potable Water & Sewage Tank Fabrication Details Coast Guard Drawing 154 WPC 506-201, Rev A, Fills Vents, Sounds, and Overflows Coast Guard Drawing 154 WPC 506-301, Rev -, Fills, Vents, Sounds, Overflows Diagram Coast Guard Drawing 154 WPC 528-301, Rev B, Grey Water System Diagram Coast Guard Drawing 154 WPC 593-201, Rev F, Sewage System Arrangement Coast Guard Drawing 154 WPC 593-301, Rev C, Sewage System Diagram Coast Guard Drawing 154 WPC 593-303, Rev A, Sewage Control System Coast Guard Drawing 154 WPC 601-302, Rev D, General Arrangement Coast Guard Drawing 154 WPC 633-301, Rev C, Cathodic Protection System COAST GUARD PUBLICATIONS Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements USCGC MARGARET NORVELL (WPC-154) DOCKSIDE AVAILABILITY FY2023 43 (REV-0) Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures OTHER REFERENCES ASTM International (ASTM) D1330, 2010, Standard Specification for Rubber Sheet Gaskets 3. REQUIREMENTS 3.1 General. 3.1.1 CIR. The Contractor must submit a CIR for the inspections listed in the following paragraph(s): ? 3.2.1 Inspection of Grey Water Tank. 3.1.2 Tech Rep. None. 3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection). 3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). 3.1.5 Temporary Sanitary and Sewage Facilities. Whenever sewage or grey water collection service is disrupted due to Contractor repairs, the Contractor must provide temporary facilities in accordance with SFLC Standard Spec 0000 par 3.2.11. 3.1.6 Temporary HVAC. If the Contractor�s proposed cleaning plan will degrade continuous operation of the ship�s HVAC system then the Contractor must provide temporary ventilation to all impacted areas equivalent to the normal zonal ventilation rating for those spaces (i.e. maintain existing climate control) for the duration of work as described in SFLC Std Spec 0000. 3.1.7 Refer to all references beneath section 2 above, as applicable. NOTE Be aware that the grey water system has few isolation valves and many openings that must be plugged or blanked to contain cleaning media. Be aware that AC condensate drains into the Grey Water Tank at 8 separate locations. Any temporary disruption or degradation of climate control must be fully addressed by the cleaning plan. For these reasons, based on lessons learned, it is suggested that chemical cleaning be used on sewage piping and grey water system piping be cleaned mechanically (e.g. waterjetting, etc.) 3.1.8 Cleaning Plan. No later than 7 days after the arrival conference, and prior to the start of cleaning work, the Contractor must submit a cleaning plan CFR that contains the following: USCGC MARGARET NORVELL (WPC-154) DOCKSIDE AVAILABILITY FY2023 44 (REV-0) ? A list of qualified personnel who will disassemble machinery or handle chemicals. ? An SDS for every chemical proposed for use. ? A step by step description of the procedures and methods that will be used to clean the systems ? A list of locations in the sewage and grey water piping system where piping lines will be opened and components will be removed. At a minimum the piping must be opened at 3 separate sewage system clean-out locations and 3 separate grey water system clean-out locations for �before and after� inspections to determine the extent of cleaning required and to verify cleaning was adequately performed. These locations must be pre-approve by the COR and included in the cleaning plan CFR. NOTE Coast Guard personnel will operate all shipboard machinery and equipment. 3.2 Operational test and inspection - initial. Prior to commencement of cleaning work, the Contractor must witness Coast Guard personnel perform an operational pre-test of all items and shipboard devices to be disturbed, used, repaired, or altered, (e.g. TLIs, pumps, etc.) to demonstrate existing operational condition and to determine a more precise scope of cleaning required. Submit a CFR detailing any required growth work or repairs identified during the operational test based on the observed condition of the systems. Use the most economical methods for accomplishing the work. 3.2.1 Inspection of Grey Water Tank. Open and inspect the grey water tank to determine the condition of the grey water tank coating system to the greatest extent practicable, pre-cleaning. Submit a CIR detailing the condition of the grey water tank coating system and any noted discrepancies, include an estimated square footage of failed coating in the CIR. 3.3 Cleaning and Inspection Requirements. After the COR approves the �Cleaning Plan� the Contractor must clean the piping and tanks and in accordance with the approved �Cleaning Plan�, and as described below. Clean, in their entirety, all sewage and grey water system interior surfaces (e.g. sewage and grey water ppg interiors, pump interiors, valve interiors, all sewage and grey water tank vent lines interiors, sewage vacuum switch manifold interiors, fire main sprinkler pipe interiors and spray hole interiors in main sewage tank used to flush sewage tank, overboard/to shore connection discharge pump and all related valve and pipe interiors, etc.) that may come in contact with sewage or grey-water, by removing all obstructions, clogs, uric scale, and waste build-up on piping and component interiors, ensuring subsequent free unobstructed flow of waste solids and fluids. NOTE Depending on the condition of the system at the contract start date, chemical cleaning may not adequately remove all obstructions, scale, and build-up present. More intrusive cleaning methods, such as pressure washing, flexible auger cleaning, or other mechanical means of cleaning, may be required to remove all obstructions, scale, etc. These more intrusive methods are in scope of this work item and the Contractor may be required to use one or more them, in the appropriate quantities, to achieve minimum cleaning requirements. USCGC MARGARET NORVELL (WPC-154) DOCKSIDE AVAILABILITY FY2023 45 (REV-0) NOTE Before filling a system with descaler ensure all openings below the fill point are blanked off or plugged. 3.3.1 Chemical Cleaning of Piping. When chemically cleaning piping and component interiors use a commercially available biodegradable sewage/grey-water system descaler (e.g. SEW CLEAN, etc.) safe for use on stainless steel. Fill the systems with descaler and hold for a long enough period to clean the systems as described above. After cleaning is complete drain and dispose of all sewage and grey water system contents. 3.3.2 Tank Cleaning. Interior surfaces of the Grey Water Tank 3-17-0-W, Sewage Holding Tank 2-4-0- W, and sewage vacuum accumulation tank must be cleaned until free of all foreign materials, sediment, and sludge. Remove all persistent residues, residual wash media, and moisture with clean lint-free cloths. Remove, clean, and re-install all tank interior components (e.g. TLIs, limit switches, eductors, etc.). Renew all sewage tank and grey water tank zinc anodes that have lost more than 50% of their material using Government-furnished property, otherwise reuse the existing zinc anodes. Remove and dispose of all sewage system contents and collect, contain, and dispose of all wash media and cleaning materials in accordance with all applicable Federal, state, and local regulations. Remove all unused chemicals from USCG property immediately upon completion of work item. 3.3.4 Inspections. After cleaning, inspect the piping interior at the locations specified in the �Cleaning Plan� using a borescope in the presence of the COR, verify that all solid deposits, visible to the unmagnified eye, have been removed. Visually inspect all system components (e.g. TLIs, limit switches, pressure switches, tank interior surfaces, fasteners, gasket seating surfaces, manhole cover surfaces, etc.) for excessive wear, damage, and all other notable discrepancies. Open and vacuum-clean the control panel assembly and inspect for any indications of overheating or loose wiring or connections. Submit a CFR. 3.3.5 Miscellaneous. Do not drain any fluids (e.g. sewage, grey water, fresh water, etc.) into any space, bilge, or exterior location. Take all precautions required to prevent contamination of personnel and spaces in accordance with all applicable Federal, state, and local regulations. Renew all disturbed soft components (e.g. seals, gaskets, o-rings, etc.). Do not use the sewage pump installed in the system to offload sewage system contents. 3.3.5.1 Plug log. Plug all unattended openings in the system. Plugs must be fitted with a lanyard, ring or other device to prevent loss of the plug inside the system. Create and maintain a written log of each plug that specifies the location of each. Remove and dispose of all plugs upon completion of work. Furnish the plug log to the Coast Guard Inspector during the performance of close-out inspections. 3.3.5.2 Use of Coast Guard Sewage and Grey Water Disposal Facilities. If �YES� is denoted in Table 1 � (Use of Coast Guard Sewage and Grey Water Disposal Facilities), beneath paragraph 1.1 (Intent), the Contractor may offload and dispose sewage and grey water system contents into the Coast Guard pier facility tanks in lieu of a Contractor furnished tank truck, otherwise the Contractor must dispose of all waste using the Contractor�s disposal facilities. 3.4 Closing tanks. The Contractor must notify the COR at least 24 hours prior to closing the tank. After completion of all authorized repairs and after the COR inspects all work performed, close the tanks. USCGC MARGARET NORVELL (WPC-154) DOCKSIDE AVAILABILITY FY2023 46 (REV-0) NOTE Coast Guard personnel will operate all shipboard machinery and equipment. 3.5 Operational test � post repairs. After completion of work, the Contractor must thoroughly test all disturbed components and systems and accomplish the following tasks in conjunction with each other as appropriate, in the presence of the Coast Guard Inspector, and submit a CFR: 3.5.1 Adjust the set point on each of the vacuum pressure switches (as applicable) to the set points noted previously. 3.5.2 Verify operation of the low and high level switches/alarms and that the pumps cycle from lead to lag status during operation. Demonstrate proper operation of tank TLIs to prove satisfactory operating condition. 3.5.3 Leak test. After all system components are reinstalled, the Contractor must test all disturbed piping for leaks, as follows: ? Run water down all disturbed grey water system piping runs for 5 minutes. ? Ensure the system holds vacuum without cycling for at least 20 mins. ? Place both vacuumarator selection switches in the "RUN" position. Allow vacuumarator pump to run until system operating pressure of -0.40 to -0.55 bar is reached. Observe vacuum tank pressure gauge. Place both vacuumarator selection switches in the "OFF" position. (NOTE: A vacuum loss of more than 0.14 bar indicates an air leak exists in the system.) Verify vacuum system pressure remains between -0.40 to -0.55 bar for 20 minutes. Record pressure value and include in the CFR. ? Perform smoke leak test on vacuum portions of the sewage system where the Contractor has disturbed a mechanical joint. ? Closely monitor the systems for leaks. Repair all leaks detected. Repeat test and inspection tasks until no leaks are detected. 3.5.4 Upon completion of testing and, in the presence of the Coast Guard Inspector, pump tanks to the limit of the ship�s installed pumps. Per provided SOW. X: Regulations while onboard Coast Guard Base Miami Beach: 1. Daily colors and the raising/lowering of the American flag will take place every morning at 0800 and every evening at sunset. All personnel on Base will face the main flag pole & maintain silence and all vehicles & equipment will halt during these brief events. 2. The construction site shall be maintained in a clean condition at all times. This included daily clean-ups of the construction and storage areas (FAR 52.236-12). The site shall be well lit and well barricaded/cordoned off as appropriate. 3. Contractors are welcome to eat breakfast & lunch on Base in the base galley at cost. Breakfast is served from 0600-0730 daily & lunch will be served from 1200-1300 daily in the galley. All personnel desiring meal service shall be in clean, non-soiled clothing. The Coast guard reserves the right to refuse service to anyone it deems dirty. 4. There are two smoking areas on base, one in the central northern parking lot covered by the tiki hut & one in the NW corner of the southern larger parking lot. No smoking is permitted anywhere else on base. 5. Contractors are welcome to utilize the Base�s Exchange store; however, contracted personnel are prohibited from purchasing any uniform, alcohol or tobacco products in it. 6. Traffic Regulations: a) 10 mph speed limit b) No use of cell phones is permitted while driving vehicles or operating heavy machinery c) All personnel shall obey all marked traffic signals including stop signs & stop lights. 7. Absolutely no firearms or weapons of any kind are allowed onboard Base Miami Beach. 8. Only American citizens and permanent resident aliens are allowed onboard Base Miami Beach Facilities. Absolutely no foreign nationals are permitted on the premises. 9. Notice shall be given to the Coast Guard�s representative 1 week in advance of any planned power, water, sewage or lighting outages. 10. The contractor shall provide a consolidated list of all contracted personnel including their driver�s license numbers (or other valid gov�t issued ID number) who will be working on Base Miami Beach Facilities either the day of or prior to the notice to proceed date. 11. Contractors are welcome to utilize the restrooms on the 1st decks of Buildings 3, 4, and 7 providing they are clean and do not track mud, dirt or any other debris into the restrooms. 12. Should warnings of gale force or stronger winds, or other inbound natural disasters be issued, the contractor shall take every practicable precaution to minimize the danger to persons, to the work, and the adjacent property. These precautions shall include closing all openings, removing all loose materials, tools and equipment from exposed locations, and removing or securing scaffolding, securing field trailers, and other appropriate equipment and other temporary work. 13. No personnel other than the contracting officer has the authority to alter the terms of any contract or to issue any change orders. 14. All contractor vehicles, equipment and gear onboard Coast Guard properties are subject to search at all times. Additionally at all times due to security and operational needs, the contractors is subject to orders to evacuate the property at any time. 15. Due to the compact & dense nature of operations & support functions ongoing on board Base Miami Beach all efforts within reason to minimize the size and footprint of the contractor�s lay down area shall be taken. Contractors shall carpool as much as possible to minimize the number of vehicles needing parking on Base. At a minimum, the ratio of contractors to contractor vehicles shall be no less than 2:1. 16. All piers on base Miami Beach are load restricted in some form. If contractors need to bring heavy equipment (cranes, forklifts, 18 wheelers, man-lifts, construction equipment, backhoes, excavators or other equipment heavier than standard sedans) closer than 40� to any pier on base to complete their project the contractor shall submit a request for information (RFI) to the Contractor�s representative. Location of Work: U.S. Coast Guard Base Miami Beach USCGC Margaret Norvell 100 MacArthur Causeway Miami Beach, FL 33139 Performance Period: Performance of work is expected to commence NLT 10 days after award is made. Extension period must be approved by the Contracting Officer for any unforeseen delays. SITE VISIT: It is highly recommended and encouraged that interested party�s contact Mr. Bryan Goltz for a site visit which will be held on Wednesday Jan 18, 2023 at 10:00AM EST. For scheduling contact Mr. Bryan Goltz via email Bryan.W.Goltz@uscg.mil Or via phone at (305) 535-4337. **All Questions and Answers will not be accepted after 23 Jan 2023 at 10:00AM EST. APPLICABLE FAR CLAUSES FAR 52.213-4: 52.213-4 Terms and Conditions-Simplified Acquisitions (Other Than Commercial Items). ATTACHED BY REFERENCE 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS 52.236-2 DIFFERING SITE CONDITIONS (APRIL 1984) 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APRIL 1984) 52.236-27 SITE VISIT (CONSTRUCTION) {FEB 1995) Work hours: Monday through Friday, 0730 � 1800 (7:30 am � 6 pm) No weekends or Holidays authorized. See attached applicable FAR Clauses by reference. Offerors may obtain full text version of these clauses electronically at: www.arnet.gov/far The following Homeland Security Acquisition Regulations (HSAR) are incorporated as addenda to this solicitation: HSAR 3052.209-70 Prohibition on Contracts with Corporate Expatriates (Jun 2006); Contracting Officers Technical Representative (Dec 2003) (COTR) HSAR 3052.237-72. Copies of HSAR clauses may be obtained electronically at http://www.dhs.gov. Request Company�s Tax ID information and UEI number. Vendors providing an offer must be registered in SAM (System for Award Management) prior to close of this solicitation. https://www.sam.gov/portal/public/SAM/. The vendors SAM registration must be in an �ACTIVE� status prior to award. Vendors must ensure that the above listed NAICS codes are listed on their SAM registration to perform this type of service.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS