Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Missouri was posted on September 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

3-AXIS CNC Mill - RESUBMITTED

Closed
1011-27State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 339113
New
Federal
6515--Air-Powered Chiropractic Tables
Solicitation # 36C25927Q0025
Solicitation 36C25927Q0025 is a firm-fixed-price, total small business set-aside contract issued by the Department of Veterans Affairs for the procurement of two air-powered or pneumatic chiropractic tables, brand name or equal to the Hill Laboratories Air Flex II. The equipment will be delivered to the George E. Wahlen VA Medical Center in Salt Lake City and the Ogden VA Community Based Outpatient Clinic in Utah. Key technical requirements include a minimum one-year parts warranty, specific electrical compatibility, and a base table weight not exceeding 300 lbs. The tables must feature air-powered systems and specifically exclude hydraulic power. Offerors must submit a five-volume quote package including technical specifications, pricing, delivery lead time in days after receipt of order, a Buy American Certificate, and an authorized distributor letter from the manufacturer if the offeror is not the OEM. Delivery is F.O.B. Destination, and while tables are expected to be pre-assembled, any necessary installation or assembly fees and freight costs should be included in the delivery line item. Award will be based on a comparative analysis of price, technical compliance, and delivery lead time, with the government reserving the right to select the most advantageous offer rather than the lowest price. Quotes are due by 12:00 PM MT on October 30, 2026.
Network Contract Office 19 (36C259)

POSTED

2 days ago

DEADLINE

in 5 days

AI Contract Overview

Show more

Metropolitan Community College is soliciting bids for the purchase and installation of one new, unused 3-axis CNC mill for the Penn Valley Advanced Technical Skills Institute. The procurement aims to standardize machinery within the CIMM department to improve instructional efficiency and support the teaching of lights-out manufacturing and machine tending. The selected machine must be fully enclosed, safety interlocked, and include automation packages for future robotics integration. Key technical requirements include a minimum work envelope of 30.0 by 17.5 by 17.5 inches, a 32-tool changer, a CAT 40 Big+ dual contact spindle at 15,000 RPM, and a minimum 25 horsepower spindle motor with rapid traversal speeds of at least 1250 IPM. The machine must also feature Renishaw Set and Inspect software and come with a two-year warranty and a 15,000 dollar Kennametal manufacturer tooling certificate. The contract will be awarded to the lowest compliant bidder on an all-or-nothing basis, with evaluation factors including prior experience, financial status, and proposed subcontractors. The vendor is responsible for all freight, rigging, installation by qualified technicians, and on-site training, with a final delivery and installation deadline of March 15, 2027. Required submission documents include company information, M/WBE participation forms, E-Verify affidavits, and non-collusion statements. All goods must be shipped FOB Destination to the Penn Valley Campus in Kansas City, Missouri. Payment is subject to the receipt and acceptance of the equipment, and the contract is subject to annual appropriations by the college.

General Info

Metropolitan Community College seeks bids for one 3-axis CNC mill installation by March 2027.

Documents

4

3-Axis CNC Mill Bid Specification Sheet

DOCX, High priority: read this firstspecifications
High

IFB 1011-27 3-Axis CNC Mill

DOCX, High priority: read this firstifb
High

Public Purchase Vendor Response Instructions

DOCX, High priority: read this first5 pages · special-notice
High

1013-27 Synthetic Human Cadaver

DOCX, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Sep 25, 2026 to Sep 29, 2026. The notice title changed. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMissouri → Metropolitan Community College
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The CIMM department has been moving towards more advanced and industry aligned machinery as per the want and need of its committee and business partners. Our current mixture of Haas and Okuma machinery has been an ongoing classroom struggle to teach on, as they differ from one another in ways that can make teaching both at the same time difficult. These difficulties can and do result in time being taken away from learning the fundamentals of machining and manufacturing. Although class time will always have a certain amount of problem solving, with varied machining brands during labs, this problem solving is not as a result of students asking questions but is a result of different machinery handling and doing things in different ways. This machine will include several automation packages allowing it to be retrofitted for use with standalone robotics. The automation packages on this machine, as well as a previously purchased mill, allow MCC to more closely work with its business partners on teaching the fundamentals of lights out manufacturing with machine tending. Although CIMM works to train and place its students with local area manufacturers with great success, we are often not training as many potential employees as those who have already left the industry or will be leaving. This is creating a large gap in manpower that something like a collaborative robot can be used to great success in supplement the workforce. Vendor will need to provide Freight, Rigging and installation of machine!

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS