This Solicitation opportunity from Department Of Defense was posted on May 19, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The contract pertains to the System Engineering and Integration Contract II and involves an Industry Day event accompanied by a Request for Information. Updated draft versions of Sections L and M, along with the Contract Data Requirements List (CDRLs) package, have been released to solicit feedback from industry participants. Comments on these drafts are requested by close of business on May 26, 2016, and can be submitted directly to the Contracting Officer, Ms. Lisa Barone, with questions and comments welcomed at any time.
The contract is managed by the Department of Defense through the FA8102 Aflcmc Wi office located at Tinker Air Force Base in Oklahoma. The solicitation is associated with NAICS code 541511. Key contacts for the contract include Contracting Officer Lisa M. Barone and Contract Specialist Shawn Walles, both available via provided email and phone channels for further engagement. The notice emphasizes the importance of industry feedback to refine contract documents and requirements ahead of the procurement process.
General Info
System Engineering contract draft sections seek industry feedback by May 26, managed by DoD at Tinker AFB.
DOCX, High priority: read this firstspecifications
HighAI Summary for FA8730-16-C-XXXX SEIC II Contract Data Requirements List (CDRL): Draft Contract Data Requirements List (CDRL) dated 20 April 2016 for the System Engineering Integration Contract (SEIC II), contract number FA8730-16-C-XXXX. The document specifies the required deliverables, including software products, status reports, and technical documentation, and provides detailed submission instructions and technical requirements for the Build-on-Demand Toolset (BOD).
PPTX
PPTX, High priority: read this firstsow
HighAI Summary for Product-Based SEIC WBS: A draft Work Breakdown Structure (WBS) for a Product-Based SEIC, detailing technical tasks across several functional areas including Transition Planning, Enterprise Architecture, IVV&E Integrated Product Lines (MPE/JIBE and JMPS Tools), Build on Demand Toolkit, Developer Support, Cybersecurity, Program Management, and FMS Engineering & Integration.
DOCX
DOCX, High priority: read this firstsow
HighAI Summary for SEIC II Draft Statement of Work (20150930): Draft Statement of Work (SOW) dated September 30, 2015, for the U.S. Air Force System Engineering Integration Contract II (SEIC II). The document outlines the technical and management tasks required to deliver integrated Mission Planning Environments (MPEs), specifically focusing on the Joint Mission Planning System (JMPS) and the transition from legacy systems. Key areas include software architecture, cybersecurity, IVV&E, and contract program management.
PDF
PDF, High priority: read this first2 pages · industry-day
HighAI Summary for SEIC II Industry Day #2 Announcement and Draft SOW Cover Letter: Memorandum dated September 30, 2015, from AFLCMC/HBMK announcing the second Industry Day for the System Engineering Integration Contract (SEIC) II. The document provides a draft Statement of Work (SOW) for industry feedback, instructions for accessing the Mission Planning Knowledge System Integration Lab (SIL), and details for scheduling one-on-one sessions with the Government. It explicitly states that this notice does not constitute an IFB or RFP.
PDF
PDF, High priority: read this first8 pages · q-and-a
HighAI Summary for SEIC II Industry Day Q&A: This document contains a series of questions and answers from an Industry Day event regarding the SEIC II contract. Key topics include requirements for DOORS compatibility, the vision and timeline for the Build-on-Demand (BOD) tool set, Enterprise Configuration Management, alternatives to the Mission Planning Central (MPC) information sharing system, travel cost handling, and the application of Agile software development methodologies across the Mission Planning Enterprise.
DOCX
DOCX, High priority: read this firstrfp
HighAI Summary for SEIC II - Section L: Instructions, Conditions, and Notices to Offerors: This document is Section L of a solicitation for the SEIC II program. It provides comprehensive instructions to offerors for proposal preparation, including requirements for five volumes: Executive Summary, Technical Mission Capability, Past Performance, Small Business Plan, and Cost/Price. It details submission formats, page limitations, and specific cost/pricing data requirements for delivery orders.
DOCX
DOCX, High priority: read this firstrfp
HighAI Summary for SEIC II Section L - Instructions, Conditions, and Notices to Offerors: This document is Section L of a solicitation for SEIC II, providing detailed instructions, conditions, and notices to offerors. It outlines the proposal preparation requirements across five volumes: Executive Summary, Technical 'Mission Capability', Past Performance, Cost/Price, and Contract Documentation. It includes specific guidance on page limitations, evaluation subfactors for systems engineering and integrated processes, and comprehensive cost/price reporting requirements including Basis of Estimates (BOEs) and CLIN summaries.
DOCX
DOCX, High priority: read this firstrfp
HighAI Summary for SEIC II Section L - Instructions, Conditions, and Notices to Offerors: This document is Section L of a solicitation for SEIC II, providing detailed instructions, conditions, and notices to offerors. It outlines the proposal preparation requirements across five volumes: Executive Summary, Technical Mission Capability, Past Performance, Small Business Plan, and Cost/Price. It includes specific guidance on page limitations, technical subfactors, and detailed cost format instructions for Delivery Orders 0001 and 0002.
DOCX
DOCX, High priority: read this firstspecifications
HighAI Summary for SEIC II - Section M: Evaluation Factors for Award: This document is Section M of the System Engineering and Integration Contract (SEIC II) solicitation. It outlines the evaluation factors for award, specifying a best-value source selection process. Key evaluation factors include Mission Capability (with five subfactors), Past Performance, Cost/Price, and Small Business. It details the relative importance of these factors and the technical rating system used by the Government to assess proposals.
DOCX
DOCX, High priority: read this firstrfp
HighAI Summary for SEIC II Section M - Evaluation Factors for Award: Section M of the System Engineering and Integration Contract (SEIC II) solicitation. It outlines the best-value source selection process, the number of awards (one intended), and the specific evaluation factors: Mission Capability (Systems Engineering, Integrated Processes and Management, and Small Business), Past Performance, and Cost/Price. It defines the relative importance of these factors and the technical rating system used for evaluation.
DOCX
DOCX, High priority: read this firstrfp
HighAI Summary for SEIC II Section M - Evaluation Factors for Award: This document is Section M of the System Engineering and Integration Contract (SEIC II) solicitation. It outlines the best-value source selection process, the basis for contract award, and the specific evaluation factors and subfactors used to judge proposals. Key factors include Mission Capability (Domain Knowledge, Cybersecurity, Transition Plan, Build-on-Demand Toolset, and Enterprise Activities), Past Performance, Cost/Price, and Small Business, with Mission Capability being the most significant factor.
DOCX
DOCX, High priority: read this firstsow
HighAI Summary for SEIC II SOW Appendix Descriptions: This document provides detailed descriptions of the products, technical tasks, and management activities for the System Engineering and Integration Contract II (SEIC II). It outlines the Mission Planning production approach, the 'software factory' process, and the integration of Framework (FW), Common Components (CCs), and Unique Planning Components (UPCs) for the Joint Mission Planning System (JMPS). Key areas covered include external interface evaluation, security patches, deficiency tracking, FMS training, and product evaluation processes.
DOCX
DOCX, High priority: read this firstsow
HighAI Summary for SOW Appendix - Definitions (Mission Planning System): This document serves as a definitions appendix to a Statement of Work (SOW) for the Air Force Mission Planning Program. It defines key technical terms and operational concepts, including the Mission Planning System, Integrated Baseline Configuration (IBC), Joint Mission Planning System (JMPS) Integrated Build Environment (JIBE), and the Build on Demand (BOD) tool set. It outlines the roles of the SEIC contractor in architecture design and the management of the Mission Planning Environment (MPE) product list.
DOCX
DOCX, High priority: read this firstsow
HighAI Summary for SOW Appendix - Government Facilities: This document is an appendix to a Statement of Work detailing the government-furnished facilities and base installation support provided to the contractor. It specifies office space, cubicles, and TS/SAP station access at Hanscom AFB, MA, and Eglin AFB, FL, including operational hours, available equipment, and security requirements such as CAC cards and DoD regulations.
DOCX
DOCX, High priority: read this firstsow
HighAI Summary for SOW Appendix: Mission Planning Component Definitions: This document is an appendix to a Statement of Work (SOW) providing a detailed technical glossary and definitions for Mission Planning Components. It includes a matrix of tools (such as AANT, ACFP, and Bird Dog) and their compatibility across various systems including JMPS, PFPS, and Unix, detailing their specific functional capabilities for flight planning and airspace management.
DOCX
DOCX, High priority: read this firstsow
HighAI Summary for SOW Appendix X - Applicable Documents (Mar 2016): This document is an appendix to a Statement of Work (SOW) dated March 2016. It provides a comprehensive list of applicable directive documents, technical rules, and regulatory standards required for the contract, including JMPS business rules, DoD directives on IT interoperability and cybersecurity, and NIST security publications.
DOCX
DOCX, High priority: read this firstspecifications
HighAI Summary for SOW Appendix X - Guidance Documents: This document serves as an appendix to a Statement of Work, providing a comprehensive list of required guidance documents, software requirements specifications, and operational requirements documents (ORDs). It includes references for the Joint Mission Planning System (JMPS), Capability Maturity Model (CMM), and various service-specific (Air Force, Navy, Army, USSOCOM) technical standards and information support plans.
DOCX
DOCX, High priority: read this firstsow
HighAI Summary for SOW Appendix X: Meetings, WG, ITP, and Boards: This document is an appendix to a Statement of Work (SOW) detailing the required contractor participation in various Mission Planning Enterprise Working Groups (WGs), Integrated Product Teams (IPTs), and Boards. It defines the roles and purposes of specific forums such as the JAWG, ICWG, and E-ERB to ensure architectural alignment, interface control, and configuration management across the mission planning enterprise.
DOCX
DOCX, High priority: read this firstsow
HighAI Summary for System Engineering Integration Contract II (SEIC II) SOW: Draft Statement of Work (dated 20160407) for the U.S. Air Force System Engineering Integration Contract II. The document outlines the scope for Joint Mission Planning System (JMPS) architecture design, security patches, and utilities to support Mission Program Elements (MPEs). It details goals for cost reduction, cybersecurity, and operational readiness, and specifies requirements for enterprise architecture, developer support, and program management.
PDF
PDF, Low priorityspecial-notice
LowAI Summary for MP Knowledge SIL Access Instructions: This document provides registration and access instructions for potential offerors to utilize the Mission Planning Knowledge System Integration Lab (SIL) via Hanscom milCloud. It outlines the purpose of the SIL for improving knowledge of Mission Planning products and processes, lists required security documentation (CAGE code, DD Form 441, DD 2345), and provides guidance on obtaining DoD ECA Certificates for system access.
PDF
PDF, Low priority1 page · other
LowAI Summary for MP Knowledge SIL Access Request Form: An access request form for Prime Offerors associated with SEIC II to gain entry to the Mission Planning Knowledge System Integration Lab (SIL). The document outlines security requirements, including CAGE codes, facility security clearances, and mandatory milCloud training, and provides instructions for submission to the Contract Specialist.
DOC
DOC, Low prioritypresolicitation
LowAI Summary for SEIC II Draft Section L & M Release Notice: A draft release notice dated December 28, 2015, from the Airspace Mission Planning Division (AFLCMC/HBM) requesting industry feedback on draft Section L (Instructions to Offerors) and Section M (Evaluation Factors) for the System Engineering Integration Contract (SEIC) II. This is a request for comments and does not constitute a formal solicitation.
PDF
PDF, Low priority2 pages · industry-day
LowAI Summary for SEIC II Industry Day #2 Announcement & RFI: Dated 30 September 2015, this announcement invites industry representatives to the second Industry Day for the System Engineering Integration Contract (SEIC) II on 21 October 2015 at Hanscom AFB. The event aims to provide insight into Airspace Mission Planning and the Statement of Work (SOW). The document outlines registration procedures for the event and one-on-one sessions, as well as requests for industry feedback on the draft SOW and the Mission Planning Knowledge System Integration Lab (SIL) by 14 October 2015.
PDF
PDF, Low priority1 page · industry-day
LowAI Summary for SEIC II Industry Day Tentative Schedule: A tentative schedule for the SEIC II Industry Day event, featuring introductions, briefings from PM/Contracting/Legal regarding OCI, an SEIC overview, technical presentations on MP Knowledge SIL and milCLOUD training, SOW feedback, and a series of one-on-one sessions.
Updated DRAFT versions of Sections L and M, and CDRLs Package are provided for Industry feedback. Comments would be appreciated no later than COB, 26 MAY 2016 and may be submitted to the Contracting Officer, Ms. Lisa Barone (•••••@•••••.•••Sign up to see this detail). Questions/comments will be accepted at any time.
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.