This Solicitation opportunity from Department Of Defense was posted on June 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
TAFB MACC-BOA | Formal RFP for WWYK050751 - Repair/Replace Main Distribution & Branch Panel Boards, Bldg. 6002
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract is a formal Request for Proposal (RFP) for the repair and replacement of main distribution and branch panel boards in Building 6002 at Tinker Air Force Base, Oklahoma, under Project No. WWYK050751. Only current MACC-BOA holders are eligible to submit proposals, and the solicitation is structured as a Total Small Business Set-Aside under NAICS code 238210 with a size standard of $19 million in annual receipts. The work is strictly construction-only and requires the contractor to furnish all materials, labor, tools, equipment, transportation, testing, quality control, and incidentals needed to complete the project. Contractors must conduct a thorough site investigation to verify all existing conditions, as all government-provided information—including floor plans, structural, mechanical, and electrical data, and utility locations—is approximate and must be independently validated in the field. Any assemblies, frameworks, fixtures, or apparatus not explicitly shown in the drawings or specifications must be identified and provided by the contractor to ensure a fully functional, operational system. Mandatory attendance at a site visit on June 3rd, 2026, is required for proposal eligibility, and contractors must submit an Entry Authorization List with complete, accurate information for all visitors by May 22nd, 2026, with a maximum of seven attendees per contractor. The response deadline for proposals is July 3rd, 2026, at 5:00 PM CST, with potential extensions contingent on RFI responses, which are due by June 8th, 2026. The government anticipates awarding a Firm Fixed Price contract, with award going to the lowest evaluated priced proposal that meets all technical acceptability, responsibility, and conformity requirements. The contract incorporates specific FAR clauses including 52.225-9 for Buy American-Construction Materials, 52.222-5 for Construction Wage Rate Requirements, and 52.236-3 for Site Investigation and Conditions Affecting the Work, all under Deviation 2026-O0038. Contractors must provide performance and payment bonds, comply with Tinker AFB’s General Requirements Specifications, and ensure all personnel complete FOD awareness training. All submissions must be in specified Microsoft and Adobe formats, without password protection or compression, and must include a fully supported price proposal broken down by CSI Master Format Level IV for construction and labor categories for design,
General Info
Agency
NAICS
Place of Performance
S Coffeyville, OK, 73145, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
This order proposal request is only available to current MACC-BOA holders.
The work to be performed under the terms of this Order consists of furnishing all materials, labor, plant, tools, transportation, equipment, testing services, quality control, and incidentals required to accomplish the repair/replacement of the main distribution & branch panel boards in building 6002 at Tinker Air Force Base (AFB), Oklahoma (reference the project drawings for additional location information). This is a construction-only order.
The Contractor shall perform a site investigation to verify existing conditions. If necessary, additional as-built drawings are available from 72 ABW/CE - Engineering Support, located in B400 on Tinker AFB.
The Contractor shall be responsible for identifying the necessary logistical, architectural, and structural work elements required to perform the work as described herein. Assemblies, framework, fixtures, or apparatus not readily identified on the project drawings, specifications, or the Statement of Work (SOW) shall be provided by the Contractor as required for a complete, fully operating, and functioning system or systems ready for use by the Government.
Information such as floor plan layouts and dimensions; structural, mechanical, and electrical data; and location of underground utilities provided by the Government for existing and new construction are based on available as-built documentation, field observation, and equipment selected as design basis by the Government. This information is to be considered approximate and shall be field verified by the Contractor.
This project will not require contractor personnel to perform work and/or operate vehicles on flight lines, runways, taxiways, parking ramps, or in aircraft hangers or maintenance areas. However, all contractor personnel are still required to receive FOD awareness training in accordance with Tinker Air Force Base Instruction (Tinker AFBI) 21-100.
IAW National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, the requirement does not include CUI residing on or transiting through contractor and/or subcontractor systems.
Site visit attendance is mandatory to be considered eligible for submission of proposal. RSVP email confirmation of intent to attend the site visit to the primary and secondary points of contact with Entry Authorization List (EAL) information by 11:59 PM CST, Friday, May 22nd, 2026. If a Contractor/Subcontractor fails to meet this deadline, the site visit information will not be released to your organization. Order documents not able to be uploaded to SAM.gov will be provided to contractors who RSVP'd their intent to attend the initial site visit.
Attachments include an EAL spreadsheet. Please fill-in all information for individuals who will need/do not currently have Base access. Please ensure all information requested in the EAL is filled out accurately and full names matching state-issued IDs are utilized to assure Security Forces can process the requests for Base Access in a timely manner. If an individual has Base access, their name is all the information needed. Please try to limit your parties to seven attendees per Contractor.
The site visit is scheduled for June 3rd, 2026 at 10:00 A.M at the project performance site. More specific meeting details will be shared with contractors who have sent an RSVP.
The due date for the RFIs arising from the site visit is currently set for June 8th, 2026 at 5:00 PM CST. RFIs will be answered in a timely manner, and RFI responses will be shared with all site visit attendees.
This notice signifies the release of the formal RFP for Project No. WWYK050751 - Repair/Replace Main Distribution & Branch Panel Boards, Bldg. 6002. The due date for proposals is currently July 3rd, 2026 at 5:00 PM CST but is subject to be extended dependent upon RFI responses. Any extensions granted to the proposal due date will be updated to this posting. Please see the attachments for the formal RFP as well as the attachments referenced in the body of the formal RFP. Responses to received RFIs may warrant revisions to associated RFP documents so be sure to monitor this SAM posting for updates.
In lieu of the physical CD, some additional documents have been added to the attachments section including the Project Docs, Facility Standards, and some additional large files. Please contact the primary and secondary points of contact if you experience any difficulty downloading or accessing the documents.
All RFI responses have been received and compiled. Please see the attachments for the RFI responses. Utilize these in continuing to formulate your proposals. If RFI responses prompt a need for an extension to the proposal due date, please communicate that to the primary and secondary points of contact, and any extensions granted will be updated to this posting.
More opportunities from Department Of Defense → FA8137 Afsc Pzioc
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
