Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Tahoe Cedars Water System Replacement Phase 2

Open
tahoe-cedars-water-system-replacement-phase-2

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Tahoe Cedars Water System Replacement Phase 2 is a Progressive Design Build project managed by Granite Construction Company, located within El Dorado County, California. The scope of work involves the replacement and modernization of the water distribution system in the Tahoe Cedars community, including the installation of approximately 23,500 linear feet of 8-inch and 12-inch water mains and roughly 400 new water services. Additional requirements include the installation of meter assemblies, valves, and fire hydrants, as well as system tie-ins, roadway restoration, tree removal, traffic control, trucking, environmental protection, and site restoration. This solicitation is set aside for Small Business (SB), including SBA certified Veteran Owned Small Business (VOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Women-Owned Small Business (WOSB), and HUBZone Small Business (HUBZone SB). All subcontractors at every tier must utilize a skilled and trained workforce for any work falling within an apprenticeable occupation in accordance with CA PCC 2600. Construction is anticipated to run from late April 2027 through October 2027. Proposals are due by January 12, 2027, at 2:00pm PST, and must be submitted via BuildingConnected.

General Info

Granite Construction will replace the Tahoe Cedars water system in El Dorado County.

Documents

1
PDF, High priority: read this firstrfp
High

Read the document

Due in 54 days

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 54 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 1 solicitation documentRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGranite Construction Company
Contacts1 person available
OfficeN/A

Full Description

Show more
REQUEST FOR PROPOSALS FROM CERTIFIED SBE/DBE/MBE/WBE FIRMS: Tahoe Cedars Water System Replacement PDB Phase 2. Scope includes approximately 23,500 LF of 8" and 12" water main, 400 water services, meters, valves, hydrants, tie-ins, roadway restoration, tree removal, traffic control, trucking, environmental protection, and site restoration.

Similar Contracts

Same NAICS industry code

More opportunities from Granite Construction Company

Same awarding agency

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS