Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Texas was posted on July 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Tamper-Evident Seals & Security Supplies

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract requires the supply of uniquely numbered, tamper-evident seals designed specifically for bulk tank trailers to ensure the security and integrity of transported materials. These seals must meet the ANSI/AWWA B408-25 standard, guaranteeing compliance with industry requirements for tamper detection and resistance to unauthorized access during transit. Each seal must be individually numbered to enable traceability and accountability throughout the supply chain, supporting rigorous oversight and audit readiness. The solicitation is structured as a subcontract under the North Texas Municipal Water District, with a response deadline of July 29, 2026, and a posting date of July 2, 2026. The NAICS code 339999 indicates the scope falls under miscellaneous manufacturing not elsewhere classified, suggesting the seals are specialized products not covered by standard classifications. Performance is expected to support operations in Texas, though specific location details are not provided. All submitted seals must be verified for compliance with the referenced standard prior to delivery, and the supplier is responsible for ensuring consistent quality, traceability, and reliability of every unit supplied.

General Info

Supply uniquely numbered, ANSI/AWWA B408-25 compliant tamper-evident seals for bulk tank trailers by July 29, 2026.

Agency

North Texas Municipal Water DistrictView Agency

NAICS

339999 - All Other Miscellaneous ManufacturingView NAICS

Place of Performance

TX, USA

Set-Aside

NONE

Documents

This scope was carved out of 26-159-B.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Aluminum Chlorohydrate

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNorth Texas Municipal Water District
ContactsNo contacts available
OfficeN/A
Organization / Agency
North Texas Municipal Water District
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply uniquely numbered, tamper-evident seals for bulk tank trailers that comply with ANSI/AWWA B408-25 to prevent unauthorized access during transport.

More opportunities from North Texas Municipal Water District

Same awarding agency

NAICS: 237110
SLED
WYLIE WTP COMPLEX VALVE IMPROVEMENTS
Solicitation # 26-184-CSP
The North Texas Municipal Water District is soliciting bids for the Wylie WTP Complex Valve Improvements project, which focuses on the repair and replacement of existing valves and associated infrastructure at the Wylie Water Treatment Plant. This construction project, identified by solicitation number 26-184-CSP, has an estimated opinion of probable construction cost between 10 and 15 million dollars. Bids were posted on August 13, 2026, with a response deadline of September 24, 2026. The scope of work includes extensive site operations, traffic management in compliance with TXDOT standards, and the installation of new valves as detailed in the project's proposed plans and sections. The contractor is responsible for all site restoration, including topsoil replacement, grading to prevent storm water ponding, and the reseeding of disturbed areas within easements and rights-of-way. Technical requirements mandate adherence to various ASTM, ACI, and AISC standards for materials such as Portland cement, structural steel, and stainless steel bolts. Special requirements include the mandatory verification of underground utilities prior to excavation, the submission of laying plans 14 days in advance of utility activities, and the coordination and funding of overhead power pole relocations. Inspection and acceptance will occur at the project site, with the contractor bearing full responsibility for ensuring all work matches pre-construction lines and grades.
Water and Sewer Line and Related Structures Construction

POSTED

17 days ago

DEADLINE

in 25 days
View Details