Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on June 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Tank 3 Recoat Project

Closed
20260612025State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont, North Carolina, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Additional deliverables include the installation of new gravity sewers and manholes, a generator, odor control equipment, stormwater facilities, and site fencing. The project has an estimated value of $16,690,000 and is set aside for small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts forms. The agreement is governed by EJCDC standard forms, requiring performance and payment bonds and proof of insurance. Performance begins upon a Notice to Proceed, and payment is processed monthly via applications for payment submitted to the Engineer, with payments due 30 days after presentation to the owner. Final acceptance is contingent upon a joint inspection by the Owner, Contractor, and Engineer, the completion of a punch list, and the Engineer's written recommendation for final payment.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 12 days

General Info

Documents

3

Project No. 12512 Tank 3 Recoat Project - Addendum 1

PDF, High priority: read this firstamendment
High

Project No. 12512 - Tank 3 Recoat Project - Addendum No. 2

PDF, High priority: read this firstamendment
High

RCSD Project 12512 - Tank 3 Recoat Project IFB

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Rosamond Community Services District
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Kim B. Domingo (General Manager

Full Description

Show more
Bid #12512: This project involves the refurbishment of Tank 3, a 2 million gallon (MG) welded carbon steel potable water tank, including interior and exterior coatings. The scope of work includes the removal of existing interior coatings, abrasive blasting, and recoating of interior components (shell, rafters, floor, ladder, overflow, roof plates, inlet, drain piping, and other miscellaneous steel surfaces) with an NSF/UL-certified lining system designed for potable water service. The exterior roof and shell, along with their appurtenances, will be abrasive blasted and overcoated, including a new three-coat system of high-performance epoxy and polysiloxane finish. Additionally, the project entails tank recoating, repair or replacement of corroded equipment, and modifications to the inlet piping and suction manifold piping at the Tank 3 site. New screens for tank vents and new gaskets for manways and hatches will be provided and installed. All work must comply with NSF/UL 61-600 standard for potable water contact.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS