This Solicitation opportunity from Kentucky was posted on April 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The Kenton County Airport Board is soliciting bids for comprehensive tank inspection and repair services for a fleet of above-ground and in-ground prestressed concrete storage tanks used to hold spent aircraft deicing fluid and sludge from glycol treatment processes. The tanks, ranging in capacity from 125,000 to 3,000,000 gallons and constructed primarily of prestressed concrete, were built between 1992 and 2008, with signs of internal degradation due to age and chemical exposure requiring ongoing maintenance. Inspections are mandated every three years, with recent Level 2 inspections conducted by the manufacturer Crom in 2024 for the two 3-million-gallon tanks and the 2-million-gallon tank, while other tanks were last inspected by the existing on-call contractor in 2023 or 2018. The scope of work encompasses both internal and external inspections of tank walls, floors, roofs, and prestressing elements; identification of distress such as cracking, spalling, delamination, and leakage; and execution of repairs using glycol-compatible, freeze/thaw-resistant, and hydrocarbon-resistant materials that adhere to industry best practices. All work must be performed under the supervision of a NACE/AMPP Certified Coating Inspector at Level 2 or higher, and must comply with OSHA standards for confined space entry, fall protection, and lockout/tagout procedures. Deliverables include photographic documentation of deficiencies, detailed repair methodologies, product data sheets, safety plans, and comprehensive work documentation, all of which become the exclusive property of the airport board. The contract will be awarded via best value evaluation, considering both technical merit and cost, with no formal weightings disclosed. Proposals must be submitted electronically through the OpenGov portal by May 21, 2026, and include a Certificate of Insurance, an Exceptions Statement, and resident/non-resident status forms. The contract is expected to be a fixed-price arrangement with a potential two-year base period and up to three one-year renewal options, though specific pricing line items and contract value remain undefined until bidder submissions are received. Performance will occur exclusively at the Cincinnati/Northern Kentucky International Airport in Kenton County, Kentucky, with all work subject to government inspection and final acceptance on-site. Contractors must comply with federal nondiscrimination laws, allow audit access to records, and adhere to all safety and environmental compliance requirements without exception.
General Info
Maintenance, inspection, and repair of large aircraft deicing fluid tanks, with scheduled 3-year inspections.
PDF, High priority: read this firstinspection-report
HighAI Summary for 2024R032 Level 2 Inspection Report for 3.0MG Spent Deicing Fluid Storage Tank No. 2 Erlanger KY: This Level 2 Inspection Report, electronically signed by Michael L. Miller, PE on September 30, 2024, documents the condition assessment of the 3.0 million gallon Spent Deicing Fluid Storage Tank No. 2 at CVG Airport in Erlanger, Kentucky. The inspection was performed on June 27, 2024 by CROM, LLC in accordance with AWWA D110 and ACI 350 standards. It includes a comprehensive visual survey of the tank's interior, exterior, dome, floor, and accessories, with selective demolition cores taken for further analysis. The report evaluates structural integrity, identifies areas rated from Excellent to Poor, and provides recommendations for remedial actions to extend the tank's useful life and modernize safety features. Key findings include fair to poor conditions in some components such as the dome access hatch and exterior dome coating, with specific repair recommendations.
PDF
PDF, High priority: read this firstinspection-report
HighAI Summary for 2024R032 Level 2 Inspection Report for 3.0MG Spent Deicing Fluid Tank No. 1, Erlanger KY: This Level 2 Inspection Report, electronically signed by Michael L. Miller, PE on September 30, 2024, documents the condition assessment of the 3.0 million gallon Spent Deicing Fluid Storage Tank No. 1 at CVG Airport in Erlanger, Kentucky. Conducted on June 20, 2024, by CROM, LLC, the inspection followed AWWA D110 and ACI 350 standards, including visual surveys and selective demolition cores. The report evaluates structural integrity, coating conditions, and tank accessories, rating elements from Excellent to Poor. Key findings include no immediate structural concerns but recommendations for addressing fair and poor condition items such as concrete paste loss, cracked dome probe, and defective hardware to extend tank life and ensure safety.
PDF
PDF, High priority: read this firstitb
HighAI Summary for 26-031 ITB Tank Inspection & Repair Services: This Invitation to Bid (ITB) from the Kenton County Airport Board (KCAB) solicits bids for Tank Inspections, Repairs, and On-Call Services at Cincinnati/Northern Kentucky International Airport (CVG). Bids must be submitted by May 21, 2026, at 2:00 pm. KCAB reserves rights to waive irregularities, reject proposals, and negotiate with qualified bidders. Preference is given to Kentucky resident bidders per state law. The notice affirms compliance with Title VI of the Civil Rights Act, ensuring non-discrimination in contract awards. Further details and the ITB document are available on KCAB's e-Procurement Portal.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for 26-031-ITB Tank Inspection & Repair Services Sample Agreement Attachment C: This contract document between Kenton County Airport Board (KCAB) and a Contractor outlines the terms for tank inspection and repair services at Cincinnati/Northern Kentucky International Airport. Effective from 2026 to 2028 with possible renewals, it details scope of services, payment terms based on time and materials, invoice requirements, and price adjustments tied to the Consumer Price Index. The contract includes provisions on governing laws, assignment restrictions, termination rights, and liability indemnity. It references the Invitation to Bid #26-031-ITB and incorporates related exhibits, establishing the contractual framework for service delivery and compliance.
PDF
PDF, High priority: read this firstinspection-report
HighAI Summary for 2-Mil Above-ground Concrete Tank Interior Lining Inspection Report and Exterior Coating Proposal: This document is an inspection report dated July 17, 2020, for a 2-million gallon above-ground concrete storage tank at Cincinnati/Northern Kentucky International Airport. It assesses the condition of the tank's interior synthetic rubber spray-in-place liner, noting blisters and bubbles, and provides recommendations for repairs to extend the tank's service life by up to 10 years. The report includes a scope of work for surface preparation and coating application. Additionally, it contains a proposal dated August 25, 2021, for exterior surface cleaning and coating using Rust-Oleum products, including high-pressure water cleaning, crack sealing, and application of flexible primer and finish, with a cost estimate of $36,000. The document is prepared by a certified coating inspector and intended for the Kenton County Airport Board.
PDF
PDF, High priority: read this firstinspection-report
HighAI Summary for 2-Mil Gallon Tank Interior Lining Inspection Report and Exterior Coating Proposal: This document is an inspection report dated July 17, 2020, for a 2-million gallon above-ground concrete tank at Cincinnati/Northern Kentucky International Airport. It details the condition of the tank's interior lining, including blistering and deterioration due to de-icing liquid exposure, and provides recommendations for repair to extend the tank's service life. The report includes a scope of work for repairs and maintenance. Additionally, it contains a proposal dated August 25, 2021, for exterior surface preparation and coating application using Rust-Oleum products, including high-pressure cleaning, crack sealing, and primer/finish application, with a cost estimate of $36,000. The document is prepared by a certified coating inspector and addresses safety and workmanship standards.
PDF
PDF, High priority: read this firstitb
HighAI Summary for Invitation to Bid 26-031-ITB Tank Inspections & Repairs & On-Call Services: This Invitation to Bid (ITB) 26-031-ITB, issued by the Kenton County Airport Board (KCAB) on April 30, 2026, solicits bids for tank inspections, repairs, and on-call services at Cincinnati/Northern Kentucky International Airport. The document includes detailed instructions for bidders, a schedule of events with a proposal due date of May 21, 2026, and background information on the tanks requiring service. It outlines the scope of services, minimum qualifications, and submission requirements. Attachments include previous inspection reports and a sample agreement. The ITB emphasizes compliance with civil rights laws and Kentucky resident bidder preferences.
PDF
PDF, High priority: read this firstitb
HighAI Summary for Invitation to Bid 26-031-ITB Tank Inspections & Repairs & On-Call Services: This Invitation to Bid (ITB) 26-031-ITB, issued by the Kenton County Airport Board (KCAB) on April 30, 2026, solicits bids for tank inspections, repairs, and on-call services at Cincinnati/Northern Kentucky International Airport. The document includes detailed instructions for bidders, a schedule of events with key dates such as a non-mandatory pre-proposal meeting on May 19, 2026, and a bid submission deadline of June 4, 2026. It outlines the scope of services, background on the tanks to be inspected and repaired, minimum qualifications, and submission procedures. Attachments include previous inspection reports and sample agreements. The ITB emphasizes compliance with civil rights laws and Kentucky resident bidder preferences.
PDF
PDF, High priority: read this firstpolicy
HighAI Summary for KCAB Policy #5102 Confined Space Entry Plan Revision 6: This document is the Confined Space Entry Plan Policy #5102, Revision 6, effective 09/01/23, for CVG Airport Authority (CVGAA). It establishes safety compliance procedures to protect employees and contractors from hazards associated with confined space entry and operations. The policy applies to both General Industry and Construction Industry confined space operations on CVGAA property. It includes roles and responsibilities, permit systems, atmospheric monitoring, hazard assessments, emergency response, training requirements, and program review. The plan references OSHA standards and national consensus standards and mandates strict adherence to ensure employee safety during confined space activities.
PDF
PDF, High priority: read this firstinspection-report
HighAI Summary for Level 2 Tank Inspection Report - CVG Airport Tank No. 3 - 2024R032: This Level 2 Tank Inspection Report documents the inspection of the 2.0 million gallon Spent Deicing Fluid Storage Tank No. 3 at CVG Airport in Erlanger, Kentucky, performed on July 1, 2024 by CROM, LLC. The report, digitally signed by Michael L. Miller, PE, evaluates the tank's structural integrity per AWWA D110 and ACI 350 standards. It includes visual inspections of the tank interior, exterior, dome, floor, and accessories, with selective demolition coupons taken for analysis. The report rates various tank components from Excellent to Poor condition and provides recommendations for remedial actions to extend tank life and improve safety. Key findings include fair to poor conditions in some areas such as exterior wall cracks, dome access hatch corrosion, and dome deterioration requiring further engineering analysis.
PDF
PDF, Low priorityinspection-report
LowAI Summary for 2-Million Gallon Above-ground Concrete Digester Interior Inspection and Repair Reports: This document contains multiple inspection and repair reports for the 2-Million gallon Above-ground Concrete Digesters #1 and #2 at Cincinnati / Northern Kentucky International Airport (CVG). The reports, dated August 4, 2023, September 8 & 10, 2025, and June 25, 2024, were commissioned by Scott Thacker and prepared by Gregory Charles Hardig, a Sr. NACE Certified Coating Inspector Level-3. They detail interior inspections, crack repairs, coating applications, and waterproofing activities on the digesters, including safety procedures, materials used, and work completed to specification. The reports include observations on structural conditions, repair methods, and material batch records, with disclaimers about field conditions and liability.
PDF
PDF, Low priorityinspection-report
LowAI Summary for 2-Million Gallon Sludge Holding Tank Repair Inspection Report: This document contains a series of inspection reports dated September 21, 26, and 27, 2022, for the 2-million gallon partial below-ground open-top concrete sludge holding tank at Cincinnati / Northern Kentucky International Airport (CVG). The reports, prepared by Gregory Charles Hardig Sr., a NACE Certified Coating Inspector Level-3, detail the inspection and repair activities on the tank wall cap, wall gunnite repair, and floor liner repair. The reports include observations on air quality, safety measures, repair methods for cracks and concrete damage, surface preparation, and application of coatings. The reports emphasize the use of CIM-EMT primer, acrylic bonding agents, and CIM Premix 1000 coatings. The document notes that the reports are based on best available means and field conditions, with no liability assumed for outcomes.
PDF
PDF, Low priorityinspection-report
LowAI Summary for 3-Million Gallon Tank Interior Lining Inspection Report - North Tank 1: This document is an interior lining inspection report for the 3-million gallon below-ground concrete tank (North Tank 1) at Cincinnati/Northern Kentucky International Airport. Prepared by Gregory Charles Hardig, Sr. NACE Certified Coating Inspector Level-3, the report dated August 29, 2022, and a follow-up on September 7, 2022, details the condition of the tank liner, noting repairs needed around the tank's perimeter and signs of early rebar corrosion in the ceiling. The report includes observations on the tank's air quality, liner damage, and recommendations for cleaning and repair scope changes to prevent cargo leakage. It emphasizes the importance of future inspections and documents the inspection methodology and findings.
PDF
PDF, Low priorityinspection-report
LowAI Summary for 3-Million Gallon Tank Interior Lining Inspection Report - South Tank 2 - August 2022: This document is an interior lining inspection report for the 3-million gallon below-ground concrete tank at Cincinnati/Northern Kentucky International Airport, South Tank 2, dated August 20, 2022. Prepared by Gregory Charles Hardig, a NACE Certified Coating Inspector Level-3, the report details the condition of the tank's interior lining, including repairs completed on blistered areas, environmental conditions, material batching, and surface preparation observations. The report notes that the floor lining was generally well adhered, while the walls showed significant blistering and deterioration, suggesting the need for future inspections and more extensive repairs. The report includes safety protocols, inspection procedures, and photographic documentation of the tank's condition.
PDF
PDF, Low priorityinspection-report
LowAI Summary for Cincinnati/Northern Kentucky International Airport Digester #1 Interior Inspection and Repair Reports: This document contains two inspection reports for the 2-million gallon above-ground concrete digester #1 at Cincinnati/Northern Kentucky International Airport. The first report dated August 4, 2023, details the interior inspection focusing on the general condition and coating application. The second report dated September 8 & 10, 2025, covers the interior wall crack repair inspection, describing the identification, assessment, and repair process of a vertical wall crack including steel corrosion and coating application. Both reports were prepared by Gregory Charles Hardig, Sr. NACE Certified Coating Inspector Level-3, and commissioned by Scott Thacker, Sr. Manager Environmental Operations at CVG Airport. The reports include safety measures, technical observations, repair methods, and disclaimers about field conditions and liability.
PDF
PDF, Low priorityinspection-report
LowAI Summary for Kenton County Airport Board Digester #2 Wall Cap Crack Repair Inspection Report: This document is an inspection report for the 2-Million gallon Above-ground Concrete Digester #2 at Cincinnati / Northern Kentucky International Airport (CVG). Prepared by Gregory Charles Hardig, Sr. NACE Certified Coating Inspector Level-3, the report details the crack repair, waterproofing, and coating inspection activities conducted in June 2024 and a prior temporary repair in October 2023. It includes descriptions of cleaning, blasting, sealing, coating application, and safety measures taken during the repair process. The report serves as a record of the condition and repair work on the digester's wall cap and cracks, with disclaimers about field conditions and liability.
PDF
PDF, Low prioritycontract-document
LowAI Summary for Petrographic Examination Report P-2020-2 for Cincinnati Airport Storage Tanks: This report, dated September 18, 2024, presents the petrographic examination of three concrete cores taken from storage tanks at Cincinnati/Northern Kentucky International Airport. Prepared for S&ME, the report details the condition and composition of the concrete cores, including descriptions of coatings, aggregates, and reinforcement. The examination aimed to identify causes of surface deterioration, with specific concern for microbially induced corrosion and sulfuric acid attack. Methods included stereomicroscopic examination, chemical analysis via SEM/EDS, and adherence to ASTM standards. Findings describe the quality and characteristics of the mortar, coatings, and aggregates in the concrete cores.
PDF
PDF, Low prioritycontract-document
LowAI Summary for Petrographic Examination Report P-2020-2 for Cincinnati Airport Storage Tanks: This document is a petrographic examination report (No. P-2020-2) dated September 18, 2024, prepared for S&ME Cincinnati, Ohio. It details the analysis of three concrete cores taken from storage tanks at Cincinnati/Northern Kentucky International Airport. The report includes descriptions of the cores, examination and test methods following ASTM standards, and results on coating materials and aggregates. The purpose is to determine the cause of surface deterioration inside the tanks, with concerns about microbially induced corrosion and sulfuric acid attack.
PDF
PDF, Low priorityinspection-report
LowAI Summary for Sludge Holding Tank Wall Cap Repair Lining Inspection Reports CVG: This document contains a series of inspection reports dated September 21, 26, and 27, 2022, for the 2-million gallon partial below-ground open-top concrete sludge holding tank at Cincinnati/Northern Kentucky International Airport (CVG). The reports, prepared by Gregory Charles Hardig Sr., a NACE Certified Coating Inspector Level-3, detail the inspection and repair progress of the tank wall cap, wall gunnite repair, and floor liner repair. Key activities include abrasive blasting, crack repair, surface preparation, application of primers and coatings, and removal of water from the tank floor. The reports emphasize safety measures, environmental conditions, and repair methods used. The document serves as a record of the repair process and inspection findings but does not constitute a solicitation or contract document.
DOCX
DOCX, Low priorityinspection-report
LowAI Summary for South Glycol Pump Station II East & West 125 Tank Interior Inspection Report - 8-2-2023: This document is an interior inspection report dated August 2, 2023, for the South Glycol Pump Station II East 125 Tank and West 125 Tank at Cincinnati / Northern Kentucky International Airport (CVG), prepared by Gregory Charles Hardig Sr., a NACE CIP Level-3 Certified Coating Inspector. The report details the general condition of the tanks, noting two repair spots in the West 125 tank and no repairs needed for the East 125 tank. It includes inspection methods, findings, and recommended repair procedures for the West tank. The report is commissioned by Scott Thacker, Sr. Manager Environmental Operations at CVG, and includes disclaimers about the use and liability of the findings.
PDF
PDF, Low priorityinspection-report
LowAI Summary for South Glycol Pump Station II East & West Inspection Reports: This document contains inspection reports for the South Glycol Pump Station II East and West 125,000-gallon glycol holding tanks. The reports, dated July 2018 and August 2023, detail internal visual inspections conducted by certified inspectors following safety protocols. The West tank showed minor cracking and two repair spots needing patching, while the East tank was found in good condition with no repairs needed. The reports include structural evaluations, seam inspections, and recommendations for maintenance to ensure tank integrity.
DOCX
DOCX, Low priorityinspection-report
LowAI Summary for South Glycol Pump Station II West 125 Interior Inspection Report 8-7-2023: This document is an Interior Inspection Report dated August 7, 2023, for the South Glycol Pump Station II West 125 tank at Cincinnati / Northern Kentucky International Airport (CVG), prepared by Gregory Charles Hardig Sr., a NACE CIP Level-3 Certified Coating Inspector. The report details the inspection and repair of two spots inside the tank, including surface preparation and application of coating materials. The repairs were completed and the tank is ready to return to service. The report includes safety measures taken during inspection and a disclaimer about the use of the report's findings.
PDF
PDF, Low priorityinspection-report
LowAI Summary for Structural Integrity Inspection Report for 125,000 Gallon Glycol Holding Tanks: This document is a structural integrity inspection report dated 30 July 2018 for two 125,000-gallon underground glycol holding tanks at Kenton County Airport Board. The inspection was conducted by Genesis Environmental Solutions, Inc., led by certified inspector Robert McChan. The report details visual inspections of tank seams, concrete structure, sump pits, and ladder rungs for both West Tank (2B) and East Tank (2A). Minor issues such as slight floor cracking and a small area of concrete damage in Tank 2B are noted, with recommendations for patching. Tank 2A had water covering about 50% of the floor, limiting some inspections. Overall, both tanks are in good structural condition with no major integrity issues found. The report includes safety procedures followed and a disclaimer about the scope and responsibility of the inspection.
The Environmental Operations Department maintains in-ground and above ground storage tanks. These tanks vary in shape, size, use, and constructed material. The storage tanks hold various liquid products related to deicing. The product contained in these tanks include spent aircraft deicing fluid and mixed liquid suspended solids (sludge) from the glycol treatment process. Tank sizes range from 125,000 gallons to 3 million gallons and are taken out of service on a scheduled basis. Due to the age and the nature of the products that are being placed into the tanks, degradation of interior concrete surfaces has occurred. Repairs and inspections have been made on these tanks since 2009. There is an on-going need to do internal and external inspections at the frequencies listed below. Based on the inspection results, repairs of the tanks may be required. The last inspections were performed by the tank manufacturer, Crom, in 2024. These inspections were a Level 2 Tank inspection for the 2 million gallon tank and both 3 million gallon tanks. The Level 2 inspection included an internal and external inspection of the tanks. Inspection reports are attached for review as Attachments A1, A2, A3, and A4. There were several items noted with recommended actions. These recommended actions will be the focus of the scope of work when the tanks are taken out of service as shown below. Prior to the aforementioned inspection performed by the manufacturer, the balance of tanks on the table below were inspected and repaired by the current on-call tank inspection and repair company and their inspector. These reports are also attached for review as Attachments B1, B2, and B3. Tank Name Capacity (gal) Type Constructed Material Build Date Frequency Next Inspection Date Notes 2 Million Gallon Tank 2,000,000 Above Ground Prestressed Concrete 2001 3 Years 2026 Inspected by Manufacturer in 2024. See Attachment A1 & A4. 3 Million Gallon North Tank 1 3,000,000 Inground Prestressed Concrete 2008 3 Years 2027 Inspected by Manufacturer in 2024. See Attachment A2 & A4. 3 Million Gallon South Tank 2 3,000,000 Inground Prestressed Concrete 2008 3 Years 2027 Inspected by Manufacturer in 2024. See Attachment A3 & A4. Twin 125,000 Tanks 125,000/tank Inground Concrete Vaults 1992 3 Years 2028 Inspected by 3rd Party in 2018 & On-Call Contractor in 2023. See Attachment B1. Digester Tank # 1 1,500,000 Above Ground Prestressed Concrete 2004 3 Years 2026 Inspected by On-Call Contractor. See Attachment B2. Digester Tank # 2 1,500,000 Above Ground Prestressed Concrete 2004 3 Years 2026 Inspected by On-Call Contractor. See Attachment B2. Sludge Holding Tank 1,500,000 Above Ground Prestressed Concrete 2004 3 Years 2027 Inspected by On-Call Contractor. See Attachment B3.