Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on August 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Tanner Backwash Drying Beds Project

Closed
20260806036State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the installation of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the construction of a new wet well and valve vault, the demolition of existing pumps and piping, and the delivery of a fully operational station equipped with mechanical and electrical systems, a generator, odor control equipment, stormwater facilities, and fencing. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bidders must provide a bid bond and, upon award, furnish performance and payment bonds along with proof of insurance. The project is governed by EJCDC standard general and supplementary conditions. Payment is processed via monthly applications for payment submitted to the Engineer, with payments becoming due thirty days after presentation to the owner. Performance begins upon the issuance of a Notice to Proceed, and the work must adhere to strict technical standards, including NEMA, ASTM, and AMCA specifications.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 14 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work includes the rehabilitation of open and covered concrete structures, relining or replacement of steel and ductile iron piping and supports, and the installation of valves and piping appurtenances. Additional technical requirements involve the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, motor control center component replacement, and modifications to sluice and slide gates. The project also encompasses the installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. A critical requirement for all subcontractors is the mandatory use of union labor. Additionally, potential subcontractors must be capable of providing a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid for reimbursement. Quotes for services and supplies, including lead abatement, metals fabrication, and concrete restoration, are due by November 17, 2026, with the final bid date set for November 18, 2026.
Garney Pacific, Inc.

POSTED

about 6 hours ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The Tanner Backwash Drying Beds Project, solicited under number 20260806036 by the Amador Water Agency in California, is a public works construction initiative located in Sutter Creek with a bid submission deadline of September 1, 2026, at 2:00 P.M. local time. Proposals must be submitted as sealed physical copies to the agency’s office at 12800 Ridge Road, Sutter Creek, CA 95685, with contract documents accessible via the agency’s website or through a requested FTP account. The project involves construction activities subject to federal labor compliance standards, including adherence to the Davis-Bacon Act and Copeland Act, requiring payment of locally prevailing wages and fringe benefits as determined by the Department of Labor. Contractors must submit certified payrolls using Optional Form WH-347, maintain accurate employment and wage records for three years post-completion, and ensure all subcontractors comply with the same labor regulations. Affirmative action obligations under Executive Order 11246 apply, mandating equal employment opportunity practices and reporting of workforce demographics. The contract imposes strict anti-retaliation provisions, requires certification of eligibility to avoid debarment, and authorizes government representatives to conduct inspections and interviews on-site to enforce compliance. No formal contract value, pricing structure, or delivery schedule has been disclosed, nor are there specifications for packaging, marking, inspection locations, or acceptance criteria beyond labor standards. There are no identified special requirements for key personnel, security clearances, option periods, or organizational conflict of interest provisions. While the solicitation references NAICS code 237110 for water and wastewater construction and classifies labor roles such as Sewer Cleaner and Material Cleaner, it does not include details on evaluation factors for award, unique entity ID or CAGE code certification, socioeconomic status, or electronic submission portals for bids, emphasizing instead physical delivery and regulatory compliance as core requirements.

General Info

Construct backwash drying beds for wastewater treatment in Sutter Creek, CA, bids due September 1, 2026.

Place of Performance

Sutter Creek, CA, 95685, USA

Set-Aside

NONE

Documents

1

Tanner Backwash Drying Beds Project IFB

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Amador Water Agency
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
Bid #WO# 7324106: The project involves the construction of the Tanner Backwash Drying Beds for the Amador Water Agency. This is a public works construction project.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS