This Solicitation opportunity from Utah was posted on March 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Tanner Reservoir Valve Replacement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves the Tanner Reservoir Valve Replacement project in Utah with an estimated construction cost of around $2.5 million. The scope of work includes significant upgrades and replacements within the existing Tanner Turnout Vault, such as the installation of two new 18-inch high-performance butterfly valves, a new flow meter, enhanced vault ventilation, and updated electrical and telemetry systems. Additionally, a new BCC Isolation Vault will be constructed, featuring a 72-inch high-performance butterfly valve, two new access manways, two air-vacuum valves, and an 8-inch ductile iron drainpipe complete with a discharge structure. The project also entails the replacement of approximately 100 feet of a 72-inch PCCP pipeline with ¾-inch thick welded steel pipe along Wasatch Boulevard. The solicitation for this project was posted on March 13, 2026, with responses due by April 10, 2026. The contracting agency is based in Utah, and the primary point of contact is Moriah Ayon. The work is focused on enhancing the infrastructure to improve valve performance, flow monitoring, and overall system reliability within the Tanner Reservoir system.
General Info
Agency
Place of Performance
UT, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Interested Companies (4)
See All 4 Interested Companies
Start a free trial to view all interested companies, their contact details, and full contractor profiles.
Full Description
• Improvements in the existing Tanner Turnout Vault including two new 18-inch high-performance butterfly valves, a new flow meter, vault ventilation, electrical and telemetry. • Installation of new BCC Isolation Vault to include a 72-inch high-performance butterfly valve, two new access manways, two air-vacuum valves, and an 8-inch ductile iron drainpipe with a discharge structure. • Replacement of approximately 100 feet of 72-inch PCCP pipeline with ¾-inch thick welded steel pipe along Wasatch Blvd.
More opportunities from Utah
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
