This Solicitation opportunity from California was posted on September 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Tara Hills Force Main Assessment Project

Closed
20260915023State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
SLED
2025 CDBG- No. 25p-y-095-1-6798
Solicitation # 25P-Y-095-1-6798
Solicitation 25P-Y-095-1-6798 is a request for sealed bids from the McIntosh County Board of Commissioners for water system improvements in Georgia. The scope of work includes the construction of approximately 8,956 linear feet of 6-inch C900 Class 150 PVC water main, the installation of seven 6-inch mechanical joint ductile iron gate valves, twelve 3-way fire hydrant assemblies, and two connections to existing water mains. Additionally, the project requires the installation of a new 5,000-gallon hydropneumatic tank, 40 square yards of Class A pavement removal and replacement, and all necessary erosion control and appurtenances. All work must be completed within 60 consecutive calendar days from the date of the notice to proceed. This is a Section 3 Covered Contract under the HUD Act of 1968, and bidders must provide Section 3 documentation prior to the notice of award. The project also mandates compliance with the Build America, Buy America (BABA) Act. Bids must be submitted on the provided proposal forms and accompanied by a bidder's bond for 10 percent of the bid amount. Successful bidders will be required to furnish payment and performance bonds along with insurance certificates. The deadline for submission is 1:00 PM local time on December 1, 2026, at the McIntosh County Commissioners Office in Darien, Georgia.
Mcintosh County Board of Commissioners

POSTED

23 minutes ago

DEADLINE

in about 1 month
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont in North Carolina involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station. Key infrastructure work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The scope further encompasses the installation of mechanical and electrical systems, including pumps, a generator, and odor control equipment, along with gravity sewers, manholes, stormwater facilities, and site restoration. The project has an estimated value of 16,690,000 dollars and a substantial completion timeline of 560 calendar days. This solicitation, identified as SRP-W-134-0290, is a unit price contract awarded to the responsible bidder submitting the lowest responsive bid. Bidders must provide a completed EJCDC C-410 Bid Form, a bid bond, and evidence of authority to sign, while also demonstrating good faith efforts toward MWBE goals. The contract requires performance and payment bonds and adherence to strict technical standards, including AWWA Specification C-600 for pipelines and NEMA standards for motors. Payment is processed via monthly applications for payment, with funds becoming due 30 days after presentation to the owner. The project is set aside for small businesses, including certified veteran-owned, women-owned, and HUBZone small businesses.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, associated supports, valves, and piping appurtenances. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, the rehabilitation of reactor mixers and aerators, and the rerouting of sump pump discharge lines. Electrical and instrumentation work includes the installation of new or improved instrumentation, the rehabilitation and replacement of motor control center components, and modifications to existing sluice gates alongside the installation of new slide gates. The project also involves excavation, trench work, and surveying of key points around the reactors. This is a union project, and all subcontractors must utilize union labor. Potential subcontractors must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid for reimbursement. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026. This opportunity is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone firms.
Garney Pacific, Inc.

POSTED

about 1 hour ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The Tara Hills Force Main Assessment Project (No. 21EG301) is a solicitation by the West County Wastewater District for construction services in Richmond and unincorporated Contra Costa County, California. The project scope focuses on assessing the force main through the installation of smart-pig launching and receiving assemblies at the Tara Hills Pump Station, the replacement of an 18-inch plug valve with a resilient seated gate valve at Rachel Road, and potholing at up to 20 sites. Comprehensive site work is required, including demolition, excavation, sheeting and shoring, bedding, backfill, surface restoration, and the installation of asphalt concrete paving, curbs, gutters, and sidewalks. The engineer's estimate for the project is 1,361,000.00 dollars, and any awarded bid exceeding 1 million dollars will be subject to the Project Stabilization Labor Agreement. Bids must be submitted via the OpenGov portal by 2:00 p.m. on September 25, 2026, and must include a detailed construction phasing schedule and proposal security of at least 10 percent of the proposal total. The award process emphasizes strict conformity to contract documents, with the District evaluating bidders based on technical organization, professional experience, and financial resources. Key contractual requirements include the provision of performance and payment bonds equal to 100 percent of the contract price, adherence to California prevailing wage laws, and a liquidated damages penalty of 500 dollars for each calendar day of delay. Work is deemed to start five calendar days after the Notice to Proceed is issued, provided a reasonable construction schedule has been submitted.

General Info

West County Wastewater District construction project in California estimated at 1,361,000 dollars.

Documents

1

Project #21EG301 - Tara Hills Force Main Assessment Project

PDF, High priority: read this firstitb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → West County Wastewater District
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
Bid #21EG301: The West County Wastewater District invites bids for the Tara Hills Force Main Assessment Project (No. 21EG301) in Richmond and unincorporated Contra Costa County. The project involves obtaining all necessary permits, installing smart-pig launching and receiving assemblies at the Tara Hills Pump Station, replacing an 18-inch plug valve with a resilient seated gate valve at Rachel Road, performing potholing at up to 20 sites along the pipe alignment, conducting work site cleanup, and providing emergency stand-by repairs. The scope includes demolition, pipe and valve installation, temporary bypass piping, thrust restraints, excavation, sheeting and shoring, bedding, backfill, compaction, removal and disposal of spoils, surface restoration, cleanup, testing, asphalt concrete paving, landscaping, curb, gutter, and sidewalk work, temporary fencing, site security, and lighting. The project aims to assess the force main and includes all other work specified in the Contract Documents.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS