TDPUD 2026 Electric Master Plan Initial Study and Appendix G Checklist

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Truckee Donner Public Utility District has developed the 2026 Electric System Master Plan to serve as a technical assessment and strategic roadmap for the planning, operation, and modernization of its electric distribution system. Spanning a five-year planning horizon from 2026 through 2030, the plan is designed to ensure safe, reliable, and affordable electric service while incorporating updated system modeling, findings from the 2024 Integrated Resource Plan, and anticipated community growth. The assessment identified 60 critical constraints and 62 minor issues, leading to the proposal of 30 specific projects with an estimated total investment of 19,681,178 dollars. To comply with regulatory requirements, the District conducted an environmental review under the California Environmental Quality Act, resulting in a Negative Declaration and an Initial Study confirming that the master plan does not constitute a project with direct environmental impacts. A public review and comment period was held from September 18, 2026, to October 19, 2026. The plan focuses on infrastructure upgrades, reliability and resilience measures, and modernization work within the district's service territory in Nevada County, California, and is intended to be updated on a recurring five-year cycle.

General Info

Truckee Donner PUD's 2026-2030 electric plan invests 19.7 million dollars for system modernization.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Truckee Donner Public Utility District
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Mike SwansonDirector of Electric Engineering & Operations
Scott MolloyLand Development Manager

Interested Companies (1)

Nv5Albuquerque, New Mexico

Full Description

Show more
The District has prepared the 2026 Electric System Master Plan to guide the planning, operation, maintenance, modernization, and improvement of the District's electric distribution system. The Master Plan was prepared pursuant to District Code Section 7.45 and serves as both a technical assessment of existing and future system conditions and a strategic roadmap for maintaining safe, reliable, affordable, and environmentally responsible electric service within the District's service territory. The Master Plan incorporates updated electric system modeling, findings from the District's 2024 Integrated Resource Plan, lessons learned from the 2019 Master Plan, anticipated community growth, regulatory requirements, and contingency planning for emergency and maintenance conditions. The Master Plan evaluates the District's electric distribution system over a five-year planning horizon from 2026 through 2030 and is intended to be updated on a recurring five-year cycle.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
Design, Installation, Maintenance and Repair of a Supervisory Control and Data Acquisition (SCADA) System.
Solicitation # 2026-007
The City of Zephyrhills is soliciting proposals for the design, installation, maintenance, and repair of a Supervisory Control and Data Acquisition (SCADA) system. The project focuses on standardizing the City's lift stations, potable water wells, and water tower locations using the Badger Meters (formerly SmartCover and Data Flow Systems) SCADA system. Key deliverables include 100% construction documents, estimated probable costs for civil design including permitting, and classroom-style training on basic SCADA software operation. The system must support various communication protocols, including MODBUS TCP. The contract features an initial three-year term with the option for two subsequent three-year renewals, with performance centered at 39421 South Avenue in Zephyrhills, Florida. The selection process is multi-stage, beginning with a written evaluation based on technical depth, firm qualifications, and team experience. A shortlist of three firms will be invited for interviews, where they will be evaluated on their methodology, problem-solving abilities, and communication. The top-ranked vendor will then enter negotiations. Applicants must provide comprehensive documentation, including organizational charts, resumes for key personnel, and several mandatory affidavits regarding public entity crimes, human trafficking, and labor coercion. Insurance requirements include comprehensive general liability and worker's compensation with minimum policy limits of $1,000,000 combined single limits. Payments will be processed via ACH-EFT.
Utilities

POSTED

about 19 hours ago

DEADLINE

in 28 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS